Wire Fence on Concrete Parapet

Standard figure PDF DGN Approval date Revision date Revision log
Wire Fence (Design W-1) and Concrete Parapet (Type P-1) 7.119 (PDF) 7.119 (DGN) Jan. 5, 2017 May 21, 2025 7.119 Revision Log (PDF)

Single Slope Barrier Type S

Standard figure PDF DGN Approval date Revision date Revision log
Concrete Barrier 36” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.138(A) (PDF) 7.138(A) (DGN) Aug. 24, 2016 May 21, 2025 7.138 Revision Log (PDF)
Concrete Barrier 36” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.138(B) (PDF) 7.138(B) (DGN) Aug. 24, 2016 May 21, 2025 7.138(B) Revision Log (PDF)
Concrete Barrier 36” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.138(C) (PDF) 7.138(C) (DGN) Aug. 24, 2016 May 21, 2025 7.138(C) Revision Log (PDF)
Concrete Barrier 36” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.138(D) (PDF) 7.138(D) (DGN) Aug. 24, 2016 May 21, 2025 7.138(D) Revision Log (PDF)
Concrete Barrier 36” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) No Approach Panel 7.138(E) (PDF) 7.138(E) (DGN) May 10, 2017 May 21, 2025 7.138(E) Revision Log (PDF)
Concrete Barrier 36” (Type S) Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.139(A) (PDF) 7.139(A) (DGN) Aug. 24, 2016 May 21, 2025 7.139(A) Revision Log (PDF)
Concrete Barrier 36” (Type S) Parapet Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.139(B) (PDF) 7.139(B) (DGN) Aug. 24, 2016 May 21, 2025 7.139(B) Revision Log (PDF)
Concrete Barrier 36” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.139(C) (PDF) 7.139(C) (DGN) Aug. 24, 2016 May 21, 2025 7.139(C) Revision Log (PDF)
Concrete Barrier 36” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.139(D) (PDF) 7.139(D) (DGN) Aug. 24, 2016 May 21, 2025 7.139(D) Revision Log (PDF)
Concrete Barrier 42” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.140(A) (PDF) 7.140(A) (DGN) Aug. 24, 2016 May 21, 2025 7.140(A) Revision Log (PDF)
Concrete Barrier 42” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.140(B) (PDF) 7.140(B) (DGN) Aug. 24, 2016 May 21, 2025 7.140(B) Revision Log (PDF)
Concrete Barrier 42” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.140(C) (PDF) 7.140(C) (DGN) Aug. 24, 2016 May 21, 2025 7.140(C) Revision Log (PDF)
Concrete Barrier 42” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.140(D) (PDF) 7.140(D) (DGN) Aug. 24, 2016 May 21, 2025 7.140(D) Revision Log (PDF)
Concrete Barrier 42” (Type S) Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.141(A) (PDF) 7.141(A) (DGN) Aug. 24, 2016 May 21, 2025 7.141(A) Revision Log (PDF)
Concrete Barrier 42” (Type S) Parapet Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.141(B) (PDF) 7.141(B) (DGN) Aug. 24, 2016 May 21, 2025 7.141(B) Revision Log (PDF)
Concrete Barrier 42” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.141(C) (PDF) 7.141(C) (DGN) Aug. 24, 2016 May 21, 2025 7.141(C) Revision Log (PDF)
Concrete Barrier 42” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.141(D) (PDF) 7.141(D) (DGN) Aug. 24, 2016 May 21, 2025 7.141(D) Revision Log (PDF)
Concrete Barrier 54” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.142(A) (PDF) 7.142(A) (DGN) Aug. 24, 2016 May 21, 2025 7.142(A) Revision Log (PDF)
Concrete Barrier 54” (Type S) Integral or Semi-Integral Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.142(B) (PDF) 7.142(B) (DGN) Aug. 24, 2016 May 21, 2025 7.142(B) Revision Log (PDF)
Concrete Barrier 54” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.142(C) (PDF) 7.142(C) (DGN) Aug. 24, 2016 May 21, 2025 7.142(C) Revision Log (PDF)
Concrete Barrier 54” (Type S) Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.142(D) (PDF) 7.142(D) (DGN) Aug. 24, 2016 May 21, 2025 7.142(D) Revision Log (PDF)
Concrete Barrier 54” (Type S) Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.143(A) (PDF) 7.143(A) (DGN) Aug. 24, 2016 May 21, 2025 7.143(A) Revision Log (PDF)
Concrete Barrier 54” (Type S) Parapet Abutment with Guardrail Connection (With 2" Concrete Wearing Course) 7.143(B) (PDF) 7.143(B) (DGN) Aug. 24, 2016 May 21, 2025 7.143(B) Revision Log (PDF)
Concrete Barrier 54” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.143(C) (PDF) 7.143(C) (DGN) Aug. 24, 2016 May 21, 2025 7.143(C) Revision Log (PDF)
Concrete Barrier 54” (Type S) Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2" Concrete Wearing Course) 7.143(D) (PDF) 7.143(D) (DGN) Aug. 24, 2016 May 21, 2025 7.143(D) Revision Log (PDF)

Single Slope Split Median Barrier Type S

Standard figure PDF DGN Approval date Revision date Revision log
Split Median Barrier 36” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.144(A) (PDF) 7.144(A) (DGN) Aug. 24, 2016 May 21, 2025 7.144(A) Revision Log (PDF)
Split Median Barrier 36” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.144(B) (PDF) 7.144(B) (DGN) Aug. 24, 2016 May 21, 2025 7.144(B) Revision Log (PDF)
Split Median Barrier 36” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.144(C) (PDF) 7.144(C) (DGN) Aug. 24, 2016 May 21, 2025 7.144(C) Revision Log (PDF)
Split Median Barrier 36” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.144(D) (PDF) 7.144(D) (DGN) Aug. 24, 2016 May 21, 2025 7.144(D) Revision Log (PDF)
Split Median Barrier 42” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.145(A) (PDF) 7.145(A) (DGN) Aug. 24, 2016 May 21, 2025 7.145(A) Revision Log (PDF)
Split Median Barrier 42” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.145(B) (PDF) 7.145(B) (DGN) Aug. 24, 2016 May 21, 2025 7.145(B) Revision Log (PDF)
Split Median Barrier 42” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.145(C) (PDF) 7.145(C) (DGN) Aug. 24, 2016 May 21, 2025 7.145(C) Revision Log (PDF)
Split Median Barrier 42” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.145(D) (PDF) 7.145(D) (DGN) Aug. 24, 2016 May 21, 2025 7.145(D) Revision Log (PDF)
Split Median Barrier 54” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.146(A) (PDF) 7.146(A) (DGN) Aug. 24, 2016 May 21, 2025 7.146(A) Revision Log (PDF)
Split Median Barrier 54” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.146(B) (PDF) 7.146(B) (DGN) Aug. 24, 2016 May 21, 2025 7.146(B) Revision Log (PDF)
Split Median Barrier 54” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.146(C) (PDF) 7.146(C) (DGN) Aug. 24, 2016 May 21, 2025 7.146(C) Revision Log (PDF)
Split Median Barrier 54” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.146(D) (PDF) 7.146(D) (DGN) Aug. 24, 2016 May 21, 2025 7.146(D) Revision Log (PDF)

Single Slope Solid Median Barrier Type S

Standard figure PDF DGN Approval date Revision date Revision log
Solid Median Barrier 36” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.147(A) (PDF) 7.147(A) (DGN) Aug. 24, 2016 May 21, 2025 7.147(A) Revision Log (PDF)
Solid Median Barrier 36” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.147(B) (PDF) 7.147(B) (DGN) Aug. 24, 2016 May 21, 2025 7.147(B) Revision Log (PDF)
Solid Median Barrier 36” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.147(C) (PDF) 7.147(C) (DGN) Aug. 24, 2016 May 21, 2025 7.147(C) Revision Log (PDF)
Solid Median Barrier 36” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.147(D) (PDF) 7.147(D) (DGN) Aug. 24, 2016 May 21, 2025 7.147(D) Revision Log (PDF)
Solid Median Barrier 42” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.148(A) (PDF) 7.148(A) (DGN) Aug. 24, 2016 May 21, 2025 7.148(A) Revision Log (PDF)
Solid Median Barrier 42” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.148(B) (PDF) 7.148(B) (DGN) Aug. 24, 2016 May 21, 2025 7.148(B) Revision Log (PDF)
Solid Median Barrier 42” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.148(C) (PDF) 7.148(C) (DGN) Aug. 24, 2016 May 21, 2025 7.148(C) Revision Log (PDF)
Solid Median Barrier 42” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.148(D) (PDF) 7.148(D) (DGN) Aug. 24, 2016 May 21, 2025 7.148(D) Revision Log (PDF)
Solid Median Barrier 54” (Type S) Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.149(A) (PDF) 7.149(A) (DGN) Aug. 24, 2016 May 21, 2025 7.149(A) Revision Log (PDF)
Solid Median Barrier 54” (Type S) Integral or Semi-Integral Abutment (With 2" Concrete Wearing Course) 7.149(B) (PDF) 7.149(B) (DGN) Aug. 24, 2016 May 21, 2025 7.149(B) Revision Log (PDF)
Solid Median Barrier 54” (Type S) Parapet Abutment (Without Concrete Wearing Course) 7.149(C) (PDF) 7.149(C) (DGN) Aug. 24, 2016 May 21, 2025 7.149(C) Revision Log (PDF)
Solid Median Barrier 54” (Type S) Parapet Abutment (With 2" Concrete Wearing Course) 7.149(D) (PDF) 7.149(D) (DGN) Aug. 24, 2016 May 21, 2025 7.149(D) Revision Log (PDF)

Metal Railing for Bikeways

Standard figure PDF DGN Approval date Revision date Revision log
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Integral or Semi-Integral Abutment (Without Guardrail Connection) 7.154(A) (PDF) 7.154(A) (DGN) Dec. 2, 2015 May 21, 2025 7.154(A) Revision Log (PDF)
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Integral or Semi-Integral Abutment (With Guardrail Connection) 7.154(B) (PDF) 7.154(B) (DGN) Dec. 2, 2020 May 21, 2025 7.154(B) Revision Log (PDF)
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Parapet Abutment (Without Guardrail Connection) 7.154(C) (PDF) 7.154(C) (DGN) Feb. 8, 2022 May 21, 2025 7.154(C) Revision Log (PDF)
Metal Railing (Type M-1) for Bikeways on Concrete Parapet (Type P-1) Parapet Abutment (with Guardrail Connection) 7.154(D) (PDF) 7.154(D) (DGN) Feb. 8, 2022 May 21, 2025 7.154(D) Revision Log (PDF)

Structural Tube Railing Design T-1 and Concrete Parapet (Type P-2)

Standard figure PDF DGN Approval date Revision date Revision log
Integral or Semi-Integral Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.157(A) (PDF) 7.157(A) (DGN) April 9, 2020 May 21, 2025 7.157(A) Revision Log (PDF)
Integral or Semi-Integral Abutment with Guardrail Connection (With 2” Concrete Wearing Course) 7.157(B) (PDF) 7.157(B) (DGN) April 9, 2020 May 21, 2025 7.157(B) Revision Log (PDF)
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.157(C) (PDF) 7.157(C) (DGN) April 9, 2020 May 21, 2025 7.157(C) Revision Log (PDF)
Integral or Semi-Integral Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) 7.157(D) (PDF) 7.157(D) (DGN) April 9, 2020 May 21, 2025 7.157(D) Revision Log (PDF)
Parapet Abutment with Guardrail Connection (Without Concrete Wearing Course) 7.157(E) (PDF) 7.157(E) (DGN) April 9, 2020 May 21, 2025 7.157(E) Revision Log (PDF)
Parapet Abutment with Guardrail Connection (With 2” Concrete Wearing Course) 7.157(F) (PDF) 7.157(F) (DGN) April 9, 2020 May 21, 2025 7.157(F) Revision Log (PDF)
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (Without Concrete Wearing Course) 7.157(G) (PDF) 7.157(G) (DGN) April 9, 2020 May 21, 2025 7.157(G) Revision Log (PDF)
Parapet Abutment with Bridge Slab Sidewalk and Guardrail Connection (With 2” Concrete Wearing Course) 7.157(H) (PDF) 7.157(H) (DGN) April 9, 2020 May 21, 2025 7.157(H) Revision Log (PDF)

Structural Tube Railing (Design T-2)

Standard figure PDF DGN Approval date Revision date Revision log
for Concrete Type J or F Barrier 7.158(A) (PDF) 7.158(A) (DGN) April 21, 2021 May 21, 2025 7.158(A) Revision Log (PDF)
for 36” Concrete Type S Barrier 7.158(B) (PDF) 7.158(B) (DGN) April 21, 2021 May 21, 2025 7.158(B) Revision Log (PDF)

Ornamental Metal Railing with Fence

Standard figure PDF DGN Approval date Revision date Revision log
Design T-3 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) 7.160(A) (PDF) 7.160(A) (DGN) May 21, 2025 N/A 7.160(A) Revision Log (PDF)
Design T-3 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) 7.160(B) (PDF) 7.160(B) (DGN) May 21, 2025 N/A 7.160(B) Revision Log (PDF)
Design T-3 Parapet Mount Parapet Abutment (without Guardrail Connection) 7.160(C) (PDF) 7.160(C) (DGN) May 21, 2025 N/A 7.160(C) Revision Log (PDF)
Design T-3 Parapet Mount Parapet Abutment (with Guardrail Connection) 7.160(D) (PDF) 7.160(D) (DGN) May 21, 2025 N/A 7.160(D) Revision Log (PDF)
Design T-3 Curb Mount Integral or Semi-Integral Abutment 7.161(A) (PDF) 7.161(A) (DGN) May 21, 2025 N/A 7.161(A) Revision Log (PDF)
Design T-3 Curb Mount Parapet Abutment 7.161(B) (PDF) 7.161(B) (DGN) May 21, 2025 N/A 7.161(B) Revision Log (PDF)

Ornamental Metal Railing

Standard figure PDF DGN Approval date Revision date Revision log
Design T-4 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) 7.162(A) (PDF) 7.162(A) (DGN) May 21, 2025 N/A 7.162(A) Revision Log (PDF)
Design T-4 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) 7.162(B) (PDF) 7.162(B) (DGN) May 21, 2025 N/A 7.162(B) Revision Log (PDF)
Design T-4 Parapet Mount Parapet Abutment (without Guardrail Connection) 7.162(C) (PDF) 7.162(C) (DGN) May 21, 2025 N/A 7.162(C) Revision Log (PDF)
Design T-4 Parapet Mount Parapet Abutment (with Guardrail Connection) 7.162(D) (PDF) 7.162(D) (DGN) May 21, 2025 N/A 7.162(D) Revision Log (PDF)
Design T-4 Curb Mount Integral or Semi-Integral Abutment 7.163(A) (PDF) 7.163(A) (DGN) May 21, 2025 N/A 7.163(A) Revision Log (PDF)
Design T-4 Curb Mount Parapet Abutment 7.163(B) (PDF) 7.163(B) (DGN) May 21, 2025 N/A 7.163(B) Revision Log (PDF)
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (without Guardrail Connection) 7.164(A) (PDF) 7.164(A) (DGN) May 21, 2025 N/A 7.164(A) Revision Log (PDF)
Design T-5 Parapet Mount Integral or Semi-Integral Abutment (with Guardrail Connection) 7.164(B) (PDF) 7.164(B) (DGN) May 21, 2025 N/A 7.164(B) Revision Log (PDF)
Design T-5 Parapet Mount Parapet Abutment (without Guardrail Connection) 7.164(C) (PDF) 7.164(C) (DGN) May 21, 2025 N/A 7.164(C) Revision Log (PDF)
Design T-5 Parapet Mount Parapet Abutment (with Guardrail Connection) 7.164(D) (PDF) 7.164(D) (DGN) May 21, 2025 N/A 7.164(D) Revision Log (PDF)
Design T-5 Curb Mount Integral or Semi-Integral Abutment 7.165(A) (PDF) 7.165(A) (DGN) May 21, 2025 N/A 7.165(A) Revision Log (PDF)
Design T-5 Curb Mount Parapet Abutment 7.165(B) (PDF) 7.165(B) (DGN) May 21, 2025 N/A 7.165(B) Revision Log (PDF)

Concrete Parapet (Type P-1)

Standard figure PDF DGN Approval date Revision date Revision log
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) With Raised Sidewalk 7.166(A) (PDF) 7.166(A) (DGN) April 9, 2020 May 21, 2025 7.166(A) Revision Log (PDF)
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.166(B) (PDF) 7.166(B) (DGN) April 9, 2020 May 21, 2025 7.166(B) Revision Log (PDF)
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk 7.166(C) (PDF) 7.166(C) (DGN) April 9, 2020 May 21, 2025 7.166(C) Revision Log (PDF)
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) 7.166(D) (PDF) 7.166(D) (DGN) April 9, 2020 May 21, 2025 7.166(D) Revision Log (PDF)
Parapet Abutment (Without Concrete Wearing Course) With Raised Sidewalk 7.166(E) (PDF) 7.166(E) (DGN) April 9, 2020 May 21, 2025 7.166(E) Revision Log (PDF)
Parapet Abutment (Without Concrete Wearing Course) 7.166(F) (PDF) 7.166(F) (DGN) April 9, 2020 May 21, 2025 7.166(F) Revision Log (PDF)
Parapet Abutment (With 2” Concrete Wearing Course) With Raised Sidewalk 7.166(G) (PDF) 7.166(G) (DGN) April 9, 2020 May 21, 2025 7.166(G) Revision Log (PDF)
Parapet Abutment (With 2” Concrete Wearing Course) 7.166(H) (PDF) 7.166(H) (DGN) April 9, 2020 May 21, 2025 7.166(H) Revision Log (PDF)

Concrete Curb

Standard figure PDF DGN Approval date Revision date Revision log
For Use with Ornamental Railing or Chain Link Fence 7.167 (PDF) 7.167 (DGN) May 21, 2025 N/A 7.167 Revision Log (PDF)

Concrete Barrier (Type P-4)

Standard figure PDF DGN Approval date Revision date Revision log
Integral or Semi-Integral Abutment (Without Concrete Wearing Course) 7.173(A) (PDF) 7.173(A) (DGN) April 9, 2020 May 21, 2025 7.173(A) Revision Log (PDF)
Integral or Semi-Integral Abutment (With 2” Concrete Wearing Course) 7.173(B) (PDF) 7.173(B) (DGN) April 9, 2020 May 21, 2025 7.173(B) Revision Log (PDF)
Parapet Abutment (Without Concrete Wearing Course) 7.173(C) (PDF) 7.173(C) (DGN) April 9, 2020 May 21, 2025 7.173(C) Revision Log (PDF)
Parapet Abutment (With 2” Concrete Wearing Course) 7.173(D) (PDF) 7.173(D) (DGN) April 9, 2020 May 21, 2025 7.173(D) Revision Log (PDF)

Miscellaneous Concrete Barrier and Parapet Details

Standard figure PDF DGN Approval date Revision date Revision log
Miscellaneous Concrete Barrier and Parapet Details 7.174 (PDF) 7.174 (DGN) Dec. 21, 2022 May 21, 2025 7.174 Revision Log (PDF)

Glulam Timber Rail

Standard figure PDF DGN Approval date Revision date Revision log
TL-2 Glulam Timber Rail (For Timber Slabs) 7.175 (PDF) 7.175 (DGN) April 21, 2021 May 21, 2025 7.175 Revision Log (PDF)
TL-4 Glulam Timber Rail (For Timber Slabs) 7.176 (PDF) 7.176 (DGN) April 21, 2021 May 21, 2025 7.176 Revision Log (PDF)
TL-2 Glulam Timber Rail (For Concrete Deck/Slab) for Skews up to 20° 7.177 (PDF) 7.177 (DGN) May 21, 2025 N/A 7.177 Revision Log (PDF)
TL-4 Glulam Timber Rail (For Concrete Deck/Slab) for Skews up to 20° 7.178 (PDF) 7.178 (DGN) May 21, 2025 N/A 7.178 Revision Log (PDF)

Wire Fence For Pedestrian Bridges and Walkways

Standard figure PDF DGN Approval date Revision date Revision log
5 Ft. Wire Fence (Design W-1) For Pedestrian Bridges 7.202 (PDF) 7.202 (DGN) Jan. 5, 2017 May 21, 2025 7.202 Revision Log (PDF)
8 Ft. Wire Fence for Pedestrian Walks 7.205 (PDF) 7.205 (DGN) Jan. 5, 2017 May 21, 2025 7.205 Revision Log (PDF)

Concrete Slope Paving Under Bridges

Standard figure PDF DGN Approval date Revision date Revision log
Concrete Slope Paving Under Bridges 7.301 (PDF) 7.301 (DGN) May 21, 2025 N/A 7.301 Revision Log (PDF)

Riprap and Stabilized Aggregate Slope Paving Under Bridges

Standard figure PDF DGN Approval date Revision date Revision log
Stabilized Aggregate Slope Paving Under Bridges 7.302 (PDF) 7.302 (DGN) May 21, 2025 N/A 7.302 Revision Log (PDF)
Riprap Slope with Geotextile (Slopes 1:2 and Flatter) 7.309 (PDF) 7.309 (DGN) May 21, 2025 N/A 7.309 Revision Log (PDF)

Conduit System For --

Standard figure PDF DGN Approval date Revision date Revision log
Conduit System For -- 7.402 (PDF) 7.402 (DGN) May 21, 2025 N/A 7.402 Revision Log (PDF)

Conduit System (Lighting)

Standard figure PDF DGN Approval date Revision date Revision log
36" Type S Concrete Light Blister, With or Without Wearing Course 7.406(B) (PDF) 7.406(B) (DGN) Aug. 24, 2016 May 21, 2025 7.406(B) Revision Log (PDF)

Prestressed Concrete Beams

Standard figure PDF DGN Approval date Revision date Revision log
30MH Prestressed Concrete Beam (Pretensioned) 30MH- 7.501 (PDF) 7.501 (DGN) Dec. 20, 2018 May 21, 2025 7.501 Revision Log (PDF)
35MH Prestressed Concrete Beam (Pretensioned) 35MH- 7.502 (PDF) 7.502 (DGN) Dec. 20, 2018 May 21, 2025 7.502 Revision Log (PDF)
40MH Prestressed Concrete Beam (Pretensioned) 40MH- 7.503 (PDF) 7.503 (DGN) Dec. 20, 2018 May 21, 2025 7.503 Revision Log (PDF)
27" Prestressed Concrete Beam (Pretensioned) 27M- 7.504 (PDF) 7.504 (DGN) May 21, 2025 N/A 7.504 Revision Log (PDF)
36" Prestressed Concrete Beam (Pretensioned) 36M- 7.505 (PDF) 7.505 (DGN) May 21, 2025 N/A 7.505 Revision Log (PDF)
MN45" Prestressed Concrete Beam (Pretensioned) MN45- 7.507 (PDF) 7.507 (DGN) May 21, 2025 N/A 7.507 Revision Log (PDF)
MN54" Prestressed Concrete Beam (Pretensioned) MN54- 7.508 (PDF) 7.508 (DGN) May 21, 2025 N/A 7.508 Revision Log (PDF)
MN63" Prestressed Concrete Beam (Pretensioned) MN63- 7.509 (PDF) 7.509 (DGN) May 21, 2025 N/A 7.509 Revision Log (PDF)
82MW Prestressed Concrete Beam (Pretensioned) 82MW- 7.531 (PDF) 7.531 (DGN) May 21, 2025 N/A 7.531 Revision Log (PDF)
96MW Prestressed Concrete Beam (Pretensioned) 96MW- 7.532 (PDF) 7.532 (DGN) May 21, 2025 N/A 7.532 Revision Log (PDF)
14", 18" and 22" Rectangular Prestressed Concrete Beam (Pretensioned) _RB- 7.550 (PDF) 7.550 (DGN) May 21, 2025 N/A 7.550 Revision Log (PDF)

Prestressed Concrete Beam Diaphragm Connections

Standard figure PDF DGN Approval date Revision date Revision log
Prestressed Concrete Beam Diaphragm Connection Details 7.560 (PDF) 7.560 (DGN) Dec. 21, 2022 May 21, 2025 7.560 Revision Log (PDF)

Waterproof Expansion Device

Standard figure PDF DGN Approval date Revision date Revision log
With Type F Barrier 7.627(A) (PDF) 7.627(A) (DGN) Aug. 24, 2016 May 21, 2025 7.627(A) Revision Log (PDF)
With Type S Barrier 7.627(B) (PDF) 7.627(B) (DGN) Aug. 24, 2016 May 21, 2025 7.627(B) Revision Log (PDF)
For Concrete Parapet 7.627(C) (PDF) 7.627(C) (DGN) Feb. 8, 2022 May 21, 2025 7.627(C) Revision Log (PDF)
Snowplow Protection (Use On Skews Over 15 Degrees and Less Than 50 Degrees) 7.628 (PDF) 7.628 (DGN) May 21, 2025 N/A 7.628 Revision Log (PDF)
Raised Median Or Sidewalk with F Barrier and Parapet 7.630(A) (PDF) 7.630(A) (DGN) Aug. 24, 2016 May 21, 2025 7.630(A) Revision Log (PDF)
Raised Median Or Sidewalk with S Barrier and Parapet 7.630(B) (PDF) 7.630(B) (DGN) Aug. 24, 2016 May 21, 2025 7.630(B) Revision Log (PDF)
Raised Median or Integral Sidewalk with F Barrier and Curb 7.632(A) (PDF) 7.632(A) (DGN) Aug. 24, 2016 May 21, 2025 7.632(A) Revision Log (PDF)
Raised Median or Integral Sidewalk with S Barrier and Curb 7.632(B) (PDF) 7.632(B) (DGN) Aug. 24, 2016 May 21, 2025 7.632(B) Revision Log (PDF)

Bridge Approach Panel Cover Plates

Standard figure PDF DGN Approval date Revision date Revision log
Bridge Approach Panel Barrier/Parapet Cover Plate Details 7.635(A) (PDF) 7.635(A) (DGN) May 21, 2025 N/A 7.635(A) Revision Log (PDF)
Bridge Approach Panel Raised Sidewalk Cover Plate Details 7.635(B) (PDF) 7.635(B) (DGN) May 21, 2025 N/A 7.635(B) Revision Log (PDF)
Bridge Approach Panel Integral Sidewalk Joint and Cover Plate Details (S Barrier) 7.635(C) (PDF) 7.635(C) (DGN) May 21, 2025 N/A 7.635(C) Revision Log (PDF)
Bridge Approach Panel Integral Sidewalk Joint and Cover Plate Details (Parapet) 7.635(D) (PDF) 7.635(D) (DGN) May 21, 2025 N/A 7.635(D) Revision Log (PDF)

As-Built Bridge Data

Standard figure PDF DGN Approval date Revision date Revision log
As-Built Bridge Data 7.900 (PDF) 7.900 (DGN) May 10, 2017 May 21, 2025 7.900 Revision Log (PDF)