Minnesota Department of Transportation

511 Travel Info

Hwy 210—Brainerd

Washington Street, Crow Wing County

Reconstruct, improve

MnDOT, Crow Wing County and the City of Brainerd, to reconstruct and improve Hwy 210/Washington St. from Baxter Dr. to the east end of the four-lane in Brainerd in 2026. Virtual event layout, improves from Sept. 12, 2022.

Summary of work

Hwy 210/Washington St.

  • Reconstruct or resurface the road
  • Reconstruct curbs, gutters, raised medians and
    storm sewers
  • Update signal systems
  • Remove signal systems at 4th Ave. NE and Mill Ave.
  • Realign and improve access at the Hwy 210 and Hwy 25/Mill Ave., includes roundabouts
  • Upgrade city utilities
  • Upgrade pedestrian sidewalks and approaches and reconstruct/connect the Cuyuna Lakes Trail
  • Update the Mississippi River Bridge
Project location map
Hwy 210 project location map. Click image for PDF

Hwy 210 segments

  • West — Baxter Dr. to the Bridge
  • Bridge — Mississippi River
  • Central — Bridge to Kingwood St.
  • Mall/Railyard — Kingwood St. to 10th Ave. NE
  • East — 10th Ave. NE to Pine Shores Rd.

Future impacts

Hwy 210 in Brainerd
Hwy 210 Brainerd westward towards Baxter. Photo by the City of Brainerd.

Motorists: Lane closures, changes to access along Hwy 210, gravel surfaces, detours

Pedestrians: Sidewalk closures, signed detours

More details to become available closer to construction