Minnesota Department of Transportation

511 Travel Info

Highway 62

Minneapolis

About this project

Hwy 62, South Frontage Road and South 58th Street between 28th Avenue and 46th Avenue in Minneapolis project location map
Hwy 62 in Minneapolis project area map
View full-size map

The purpose of this project is to reconstruct Hwy 62 between 28th Ave. South and 46th Ave. South in Minneapolis, as the existing pavement has reached the end of its service life. We will also resurface the Hwy 62 bridge over 28th Ave. South to extend the service life of the structure. This work is necessary to maintain the highway system.

Summary of work

  • Reconstruct Hwy 62 and ramps between 28th Ave. South and 46th Ave. South in Minneapolis
  • Resurface the Hwy 62 bridge over 28th Ave. South
  • Replace the center median barrier
  • Replace signs, including overhead signs
  • Remove the pedestrian overpass at 40th Ave. South
  • Widen the sidewalk on the 43rd Ave. South overpass
  • Replace the storm sewer system and add water treatment ponds

Traffic impacts

All traffic impacts are tentative and weather dependent. Access to businesses and residences will be maintained throughout the project.

Upcoming

Information about upcoming traffic impacts will be provided as details become available. Motorists can expect lane and directional closures on Hwy 62 during construction. The majority of construction on Hwy 62 will occur in 2027 and construction on the frontage road will occur in 2028 to minimize impact.