2025 roadwork
Through mid-October
Reconstruct, resurface and improve pedestrian features along the Hwy 12, Wright County, in these towns:
Howard Lake
Expect roadwork from west of 13th Ave. to east of Sixth Ave.

Current impacts
Through mid-October
Motorists
- Hwy 12 open with one lane in each direction
- Expect narrow lanes, shoulder or turn lane closures, gravel surfaces and flaggers at times
- Work will occur mostly between 7 a.m.- 7 p.m. on weekdays
Pedestrians
- Sidewalk closures with signed detours
Howard Lake is open
Access to businesses and residents will be maintained and open; however, expect use of alternate entrances or side streets
Summary of work
- Resurface Hwy 12 with a new asphalt road surface from west of 13th Ave. to east of Sixth Ave.
- Reconstruct or repair concrete curbs, gutters and entrances
- Improve and update pedestrian access:
- Reconstruct segments of sidewalks and ramp approaches between 13th Ave. and Sixth Ave.
- Reconstruct and widen the sidewalk in a two block area in the downtown district between Ninth Ave. and Seventh Ave.
- Update pedestrian crosswalk signal systems
Layout concept
Project home
Waverly
Expect road work on Hwy 12 from west of Summerfield Dr. to First St. S.

A rectangular rapid flashing beacon warns motorists that pedestrians are within the crosswalk
Current impacts
Through early-October
Motorists
- Hwy 12 open with one lane in each direction.
- Expect narrow lanes, shoulder or turn lane closures
- Work will occur mostly between 7 a.m.- 7 p.m. on weekdays
Pedestrians
- Sidewalk closures with signed routes
Waverly is open
Access to businesses and residents will be maintained and open; however, expect use of alternate entrances or side streets, includes sidewalk detours.
Work
- Resurface Hwy 12 with a new asphalt road surface from west of Summerfield Dr. to First St. S
- Reconstruct or repair concrete curbs, gutters and side entries
- Improve and update pedestrian access:
- Repair or add new sidewalk, includes bump outs
- Update pedestrian crosswalk signal systems at the intersections of:
- Hwy 12 and Co. Rd. 8 SW
- Hwy 12 and Fourth St. S/Co. Rd. 62
Project home
Montrose
Hwy 12 work zone from east of Clementa Ave. to east of Zephyr Ave., Wright County.

Current impacts
Through mid-October
Motorists
- Hwy 12 open with one lane in each direction.
- Expect narrow lanes, shoulder or turn lane closures
- Work will occur mostly between 7 a.m.- 7 p.m. on weekdays
Pedestrians
- Sidewalk closures with signed routes
Montrose is open
Access to businesses and residents will be maintained and open; however, expect use of alternate entrances or side streets, includes sidewalk detours.
Work
- Resurface Hwy 12 with a new asphalt surface from east of Clementa Ave. to east of Zephyr Ave. in Montrose
- Reconstruct or repair concrete curbs, gutters and entrances
- Add a center turn lane at Zephyr Ave. and Arizona Ave. in east Montrose to improve access.
- Reconstruct the Hwy 12 intersection at Hwy 25 and Wright Co. Rd. 12/Buffalo Ave. S, to improve the truck turning radius and pedestrian crosswalk
Project home