Urban non-freeway/non-expressway pavement projects
MnDOT District 8
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. MnDOT scores and prioritizes urban non-freeway/non-expressway pavement projects separately from the normal pavement scoring process, because of their complexity, utilities and other infrastructure and level of required local coordination and public involvement. In many instances, these roads function both as state highways and as city streets. These pavement projects can be on either National Highway System or non-NHS.
Freeways have full access control (no driveways, signals or at-grade intersections). Expressways have partial access control (limited or no driveways, few and widely spaced intersections, and may include some grade separated crossings). Both are high speed roads designed to facilitate longer trips.
For the purposes of this scoring category, MnDOT uses a flexible, context-based definition of urban. This includes areas with medium-to-high density adjacent development with small to medium setbacks, and in some instances no setback. This includes both residential, industrial and commercial areas. In some instances, the urban context may cover less than a quarter mile.
Urban pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects and funding shifts.
What was selected
Related links
- District 8 project selection
- District 8 National Highway System pavement projects
- District 8 Non-National Highway System pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated August 2024
Total Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
88 | US12 | Litchfield | Medium mill and overlay Highway 22 to Meeker County Road 34 (Litchfield) | $700,000 | 2024 | NA |
84 | US12 | Willmar | Medium mill and overlay from 11th St. W. to 6th St. E. (Willmar) | $900,000 | 2027 | NA |
84 | Hwy 19 | Marshall | Reconstruct Hwy 19 from 4th St to Bruce St in Marshall. Replace sidewalks and pedestrian crossings to meet ADA standards and bike lane striping from Channel Parkway to 4th St. | $26,500,000 | 2025/2026/2027 | NA |
79 | US59 | Marshall | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 (Marshall) | $7,800,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Hwy 19 | Marshall | Concrete reconstruction from Minnesota St. to Highway 23 (Marshall) | $13,600,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Hwy 19 | Marshall | Concrete reconstruction from Lyon County Road 7 to 2nd St. (Marshall) | $8,000,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
73 | Hwy 22 | Glencoe | Medium mill and overlay from Highway 212 to Cedate Ave (Glencoe) | $600,000 | 2023 | NA |
73 | US75 | Pipestone | Reconstruction from Highway 30 to 4th St N (Pipestone) | $4,500,000 | Not Selected | This segment was rehabilitated in 2018 |
72 | Hwy 30 | Pipestone | Reconstruction from 4th Ave. W. to Highway 75 (Pipestone) | $11,400,000 | Not Selected | This segment was rehabilitated in 2017 |
71 | Hwy 23 | Clara City | Medium mill and overlay Highway 7 to Bridge number 12012 (Clara City) | $400,000 | Not Selected | This segment was rehabilitated in 2017 |
69 | US212 | Olivia | Reconstruction from the west junction of Highway 71/320th st to the East junction of Highway 71/13th St (Olivia) | $11,200,000 | Not Selected | This segment was rehabilitated in 2014 |
69 | US75 | Canby | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 (Canby) | $8,700,000 | Not Selected | This segment was rehabilitated in 2016 |
69 | Hwy 19 | Morton | Reconstruction from Centenial Dr. to Brook Dr. (Morton) | $1,900,000 | Not Selected | This segment was rehabilitated in 2016 | 66 | Hwy 19 | Ivanhoe | Medium mill and overlay from Rebecca St. to Lincoln County Road 5 (Ivanhoe) | $300,000 | 2030 | Coordinated with a NHS pavement project |
66 | Hwy 15 | Hutchinson | Reconstructionfrom 5th Ave. to 0.2 mi. S. of McLeod County Road 15 / N. High Dr. (Hutchinson) | $1,300,000 | Not selected | NA |
66 | Hwy 9 | New London | Thick mill and overlay from Highway 23 to 1st Ave SE (New London) | $700,000 | Not Selected | NA |
66 | US212 | Montevideo | Medium mill and overlay from Yellow Medecine/Chippewa County Line to Hwy 29 in Montevideo | $200,000 | Not Selected | NA |
65 | Hwy 67 | Clarkfield | Reconstruct Hwy 67 from Hwy 59 to 6th St in Clarkfield | $6,568,000 | 2024/2025 | Selected prior to policy (In 2019-2028 CHIP) |
65 | US212 | Renville | Reconstruction from Renville County Road 6 to 5th St E (Renville) | $6,500,000 | Not Selected | NA |
64 | US12 | Litchfield | Resurfacing from Hwy 24 to 4th St in Litchfield | $500,000 | Not Selected | NA |
63 | US75 | Madison | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave (Madison) | $600,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | US14 | Lake Benton | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $6,200,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
63 | Hwy 22 | Litchfield | Concrete reconstruction from Pleasure Dr. to Highway 12 (Litchfield) | $5,200,000 | Not Selected | NA |
62 | US14 | Tracy | Medium mill and overlay from Lyon County Road 28 to 4th St. E. (Tracy) | $700,000 | 2028 | Coordinated with a Non-NHS pavement project |
62 | US212 | Danube | Reconstruction from Freedom St to 2nd St in Danube | $2,600,000 | Not Selected | NA |
62 | US12 | Grove City | Reconstruction from west junction Hwy 4 to east junction Hwy 4 Grove City | $1,400,000 | Not Selected | NA |
61 | US71 | Redwood Falls | Reconstruction from 11th St to Quality Dr | $11,000,000 | Not Selected | NA |
35 | US59 | Marshall | Reconstruct Hwy 59 from G St to A St in Marshall. | $10,700,000 | Not selected | NA |
28 | US212 | Bird Island | Minor CPR and diamond grinding from 0.4 mi. W. of 10th St. to 1st St. (Bird Island) | $200,000 | Not selected | NA |
25 | US59 | Marshall | Resurface Hwy 59 from H St to A St in Marshall. | $280,000 | Not selected | NA |
16 | Hwy 22 | Eden Valley | Thin mill and overlay from Hwy 55 to Meeker / Stearns Co. Line (Eden Valley) | $100,000 | Not selected | NA |
Previous years
View more detailed scores (Excel).
Total Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
88 | US12 | Litchfield | Medium mill and overlay Highway 22 to Meeker County Road 34 (Litchfield) | $ 700,000 | 2024 | NA |
84 | Hwy 19 | Marshall | Reconstruct Hwy 19 from 4th St to Bruce St in Marshall. Replace sidewalks and pedestrian crossings to meet ADA standards and bike lane striping from Channel Parkway to 4th St. | $ 28,110,000 | 2025 | NA |
84 | US12 | Willmar | Medium mill and overlay from 11th St. W. to 6th St. E. (Willmar) | $ 900,000 | 2027 | NA |
79 | US59 | Marshall | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 (Marshall) | $ 7,800,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Hwy 19 | Marshall | Concrete reconstruction from Minnesota St. to Highway 23 (Marshall) | $ 13,600,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Hwy 19 | Marshall | Concrete reconstruction from Lyon County Road 7 to 2nd St. (Marshall) | $ 8,000,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
74 | Hwy 19 | Marsall | Resurface Hwy 19 from 280th Ave in Marshall to Hwy 67. | $ 3,900,000 | 2031 | NA |
73 | Hwy 22 | Glencoe | Medium mill and overlay from Highway 212 to Cedate Ave (Glencoe) | $ 600,000 | 2023 | NA |
73 | US75 | Pipestone | Reconstruction from Highway 30 to 4th St N (Pipestone) | $ 4,500,000 | Not Selected | This segment was rehabilitated in 2018 |
72 | Hwy 30 | Pipestone | Reconstruction from 4th Ave. W. to Highway 75 (Pipestone) | $ 11,400,000 | Not Selected | This segment was rehabilitated in 2017 |
71 | Hwy 23 | Clara City | Medium mill and overlay Highway 7 to Bridge number 12012 (Clara City) | $ 400,000 | Not Selected | This segment was rehabilitated in 2017 |
69 | US212 | Olivia | Reconstruction from the west junction of Highway 71/320th st to the East junction of Highway 71/13th St (Olivia) | $ 11,200,000 | Not Selected | This segment was rehabilitated in 2014 |
69 | US75 | Canby | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 (Canby) | $ 8,700,000 | Not Selected | This segment was rehabilitated in 2016 |
69 | Hwy 19 | Morton | Reconstruction from Centenial Dr. to Brook Dr. (Morton) | $ 1,900,000 | Not Selected | This segment was rehabilitated in 2016 |
66 | Hwy 19 | Ivanhoe | Medium mill and overlay from Rebecca St. to Lincoln County Road 5 (Ivanhoe) | $ 300,000 | 2030 | Coordinated with a NHS pavement project |
66 | Hwy 15 | Hutchinson | Reconstructionfrom 5th Ave. to 0.2 mi. S. of McLeod County Road 15 / N. High Dr. (Hutchinson) | $ 1,300,000 | Not selected | NA |
66 | Hwy 9 | New London | Thick mill and overlay from Highway 23 to 1st Ave SE (New London) | $ 700,000 | Not Selected | NA |
66 | US 212 | Montevideo | Medium mill and overlay from Yellow Medecine/Chippewa County Line to Hwy 29 in Montevideo | $ 200,000 | Not Selected | NA |
65 | Hwy 67 | Clarkfield | Reconstruct Hwy 67 in Clarkfield from just east of the intersection of Hwy 59 to 6th St. Replace sidewalks and pedestrian crossings to meet ADA standards. | $ 6,559,515 | 2024/2025 | Selected prior to policy (In 2019-2028 CHIP) |
65 | US212 | Renville | Reconstruction from Renville County Road 6 to 5th St E (Renville) | $ 6,500,000 | Not Selected | NA |
64 | US12 | Litchfield | Resurfacing from Hwy 24 to 4th St in Litchfield | $ 500,000 | Not Selected | NA |
63 | US75 | Madison | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave (Madison) | $ 600,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | US14 | Lake Benton | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $ 6,200,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
63 | US75 | Lake Benton | Reconstruct Hwy 75 from S Valley St in Lake Benton to south jct of Hwy 14. | $ 5,400,000 | 2027 | NA |
63 | Hwy 22 | Litchfield | Concrete reconstruction from Pleasure Dr. to Highway 12 (Litchfield) | $ 5,200,000 | Not Selected | NA |
62 | US14 | Tracy | Medium mill and overlay from Lyon County Road 28 to 4th St. E. (Tracy) | $ 700,000 | 2028 | Coordinated with a Non-NHS pavement project |
62 | US212 | Danube | Reconstruction from Freedom St to 2nd St in Danube | $ 2,600,000 | Not Selected | NA |
62 | US12 | Grove City | Reconstruction from west junction Hwy 4 to east junction Hwy 4 Grove City | $ 1,400,000 | Not Selected | NA |
61 | US71 | Redwood Falls | Reconstruction from 11th St to Quality Dr | $ 11,000,000 | Not Selected | NA |
32 | US59 | Marshall | Reconstruct Hwy 59 from G St to A St in Marshall. | $ 5,700,000 | 2031 | NA |
28 | US212 | Bird Island | Minor CPR and diamond grinding from 0.4 mi. W. of 10th St. to 1st St. (Bird Island) | $ 200,000 | Not selected | NA |
25 | US59 | Marshall | Resurface Hwy 59 from H St to A St in Marshall. | $ 498,368 | 2024 | NA |
16 | Hwy 22 | Eden Valley | Thin mill and overlay from Hwy 55 to Meeker / Stearns Co. Line (Eden Valley) | $ 100,000 | Not selected | NA |
View more detailed scores (Excel).
Total Score | Community | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
Total Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
88 | US12 | Litchfield | Medium mill and overlay Highway 22 to Meeker County Road 34 (Litchfield) | $700,000 | 2024 | NA |
84 | US12 | Willmar | Medium mill and overlay from 11th St. W. to 6th St. E. (Willmar) | $900,000 | 2027 | NA |
84 | Hwy 19 | Marshall | Reconstruct Hwy 19 from 4th St to Bruce St in Marshall. Replace sidewalks and pedestrian crossings to meet ADA standards and bike lane striping from Channel Parkway to 4th St. | $26,500,000 | 2025/2026/2027 | NA |
79 | US59 | Marshall | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 (Marshall) | $7,800,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Hwy 19 | Marshall | Concrete reconstruction from Minnesota St. to Highway 23 (Marshall) | $13,600,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Hwy 19 | Marshall | Concrete reconstruction from Lyon County Road 7 to 2nd St. (Marshall) | $8,000,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
73 | Hwy 22 | Glencoe | Medium mill and overlay from Highway 212 to Cedate Ave (Glencoe) | $600,000 | 2023 | NA |
73 | US75 | Pipestone | Reconstruction from Highway 30 to 4th St N (Pipestone) | $4,500,000 | Not Selected | This segment was rehabilitated in 2018 |
72 | Hwy 30 | Pipestone | Reconstruction from 4th Ave. W. to Highway 75 (Pipestone) | $11,400,000 | Not Selected | This segment was rehabilitated in 2017 |
71 | Hwy 23 | Clara City | Medium mill and overlay Highway 7 to Bridge number 12012 (Clara City) | $400,000 | Not Selected | This segment was rehabilitated in 2017 |
69 | US212 | Olivia | Reconstruction from the west junction of Highway 71/320th st to the East junction of Highway 71/13th St (Olivia) | $11,200,000 | Not Selected | This segment was rehabilitated in 2014 |
69 | US75 | Canby | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 (Canby) | $8,700,000 | Not Selected | This segment was rehabilitated in 2016 |
69 | Hwy 19 | Morton | Reconstruction from Centenial Dr. to Brook Dr. (Morton) | $1,900,000 | Not Selected | This segment was rehabilitated in 2016 |
66 | Hwy 19 | Ivanhoe | Medium mill and overlay from Rebecca St. to Lincoln County Road 5 (Ivanhoe) | $300,000 | 2030 | Coordinated with a NHS pavement project |
66 | Hwy 15 | Hutchinson | Reconstructionfrom 5th Ave. to 0.2 mi. S. of McLeod County Road 15 / N. High Dr. (Hutchinson) | $1,300,000 | Not selected | NA |
66 | Hwy 9 | New London | Thick mill and overlay from Highway 23 to 1st Ave SE (New London) | $700,000 | Not Selected | NA |
66 | US212 | Montevideo | Medium mill and overlay from Yellow Medecine/Chippewa County Line to Hwy 29 in Montevideo | $200,000 | Not Selected | NA |
65 | Hwy 67 | Clarkfield | Reconstruct Hwy 67 from Hwy 59 to 6th St in Clarkfield | $6,568,000 | 2024/2025 | Selected prior to policy (In 2019-2028 CHIP) |
65 | US212 | Renville | Reconstruction from Renville County Road 6 to 5th St E (Renville) | $6,500,000 | Not Selected | NA |
64 | US12 | Litchfield | Resurfacing from Hwy 24 to 4th St in Litchfield | $500,000 | Not Selected | NA |
63 | US75 | Madison | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave (Madison) | $600,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | US14 | Lake Benton | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $6,200,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
63 | Hwy 22 | Litchfield | Concrete reconstruction from Pleasure Dr. to Highway 12 (Litchfield) | $5,200,000 | Not Selected | NA |
62 | US14 | Tracy | Medium mill and overlay from Lyon County Road 28 to 4th St. E. (Tracy) | $700,000 | 2028 | Coordinated with a Non-NHS pavement project |
62 | US212 | Danube | Reconstruction from Freedom St to 2nd St in Danube | $2,600,000 | Not Selected | NA |
62 | US12 | Grove City | Reconstruction from west junction Hwy 4 to east junction Hwy 4 Grove City | $1,400,000 | Not Selected | NA |
61 | US71 | Redwood Falls | Reconstruction from 11th St to Quality Dr | $11,000,000 | Not Selected | NA |
35 | US59 | Marshall | Reconstruct Hwy 59 from G St to A St in Marshall. | $10,700,000 | Not selected | NA |
28 | US212 | Bird Island | Minor CPR and diamond grinding from 0.4 mi. W. of 10th St. to 1st St. (Bird Island) | $200,000 | Not selected | NA |
25 | US59 | Marshall | Resurface Hwy 59 from H St to A St in Marshall. | $280,000 | Not selected | NA |
16 | Hwy 22 | Eden Valley | Thin mill and overlay from Hwy 55 to Meeker / Stearns Co. Line (Eden Valley) | $100,000 | Not selected | NA |
View more detailed scores (Excel).
Total Score | Route | Community | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
88 | US12 | Litchfield | Medium mill and overlay Highway 22 to Meeker County Road 34 (Litchfield) | $ 700,000 | 2024 | NA |
84 | Hwy 19 | Marshall | Reconstruct Hwy 19 from 4th St to Bruce St in Marshall. Replace sidewalks and pedestrian crossings to meet ADA standards and bike lane striping from Channel Parkway to 4th St. | $ 28,110,000 | 2025 | NA |
84 | US12 | Willmar | Medium mill and overlay from 11th St. W. to 6th St. E. (Willmar) | $ 900,000 | 2027 | NA |
79 | US59 | Marshall | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 (Marshall) | $ 7,800,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Hwy 19 | Marshall | Concrete reconstruction from Minnesota St. to Highway 23 (Marshall) | $ 13,600,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Hwy 19 | Marshall | Concrete reconstruction from Lyon County Road 7 to 2nd St. (Marshall) | $ 8,000,000 | Not Selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
74 | Hwy 19 | Marsall | Resurface Hwy 19 from 280th Ave in Marshall to Hwy 67. | $ 3,900,000 | 2031 | NA |
73 | Hwy 22 | Glencoe | Medium mill and overlay from Highway 212 to Cedate Ave (Glencoe) | $ 600,000 | 2023 | NA |
73 | US75 | Pipestone | Reconstruction from Highway 30 to 4th St N (Pipestone) | $ 4,500,000 | Not Selected | This segment was rehabilitated in 2018 |
72 | Hwy 30 | Pipestone | Reconstruction from 4th Ave. W. to Highway 75 (Pipestone) | $ 11,400,000 | Not Selected | This segment was rehabilitated in 2017 |
71 | Hwy 23 | Clara City | Medium mill and overlay Highway 7 to Bridge number 12012 (Clara City) | $ 400,000 | Not Selected | This segment was rehabilitated in 2017 |
69 | US212 | Olivia | Reconstruction from the west junction of Highway 71/320th st to the East junction of Highway 71/13th St (Olivia) | $ 11,200,000 | Not Selected | This segment was rehabilitated in 2014 |
69 | US75 | Canby | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 (Canby) | $ 8,700,000 | Not Selected | This segment was rehabilitated in 2016 |
69 | Hwy 19 | Morton | Reconstruction from Centenial Dr. to Brook Dr. (Morton) | $ 1,900,000 | Not Selected | This segment was rehabilitated in 2016 |
66 | Hwy 19 | Ivanhoe | Medium mill and overlay from Rebecca St. to Lincoln County Road 5 (Ivanhoe) | $ 300,000 | 2030 | Coordinated with a NHS pavement project |
66 | Hwy 15 | Hutchinson | Reconstructionfrom 5th Ave. to 0.2 mi. S. of McLeod County Road 15 / N. High Dr. (Hutchinson) | $ 1,300,000 | Not selected | NA |
66 | Hwy 9 | New London | Thick mill and overlay from Highway 23 to 1st Ave SE (New London) | $ 700,000 | Not Selected | NA |
66 | US 212 | Montevideo | Medium mill and overlay from Yellow Medecine/Chippewa County Line to Hwy 29 in Montevideo | $ 200,000 | Not Selected | NA |
65 | Hwy 67 | Clarkfield | Reconstruct Hwy 67 in Clarkfield from just east of the intersection of Hwy 59 to 6th St. Replace sidewalks and pedestrian crossings to meet ADA standards. | $ 6,559,515 | 2024/2025 | Selected prior to policy (In 2019-2028 CHIP) |
65 | US212 | Renville | Reconstruction from Renville County Road 6 to 5th St E (Renville) | $ 6,500,000 | Not Selected | NA |
64 | US12 | Litchfield | Resurfacing from Hwy 24 to 4th St in Litchfield | $ 500,000 | Not Selected | NA |
63 | US75 | Madison | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave (Madison) | $ 600,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | US14 | Lake Benton | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $ 6,200,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
63 | US75 | Lake Benton | Reconstruct Hwy 75 from S Valley St in Lake Benton to south jct of Hwy 14. | $ 5,400,000 | 2027 | NA |
63 | Hwy 22 | Litchfield | Concrete reconstruction from Pleasure Dr. to Highway 12 (Litchfield) | $ 5,200,000 | Not Selected | NA |
62 | US14 | Tracy | Medium mill and overlay from Lyon County Road 28 to 4th St. E. (Tracy) | $ 700,000 | 2028 | Coordinated with a Non-NHS pavement project |
62 | US212 | Danube | Reconstruction from Freedom St to 2nd St in Danube | $ 2,600,000 | Not Selected | NA |
62 | US12 | Grove City | Reconstruction from west junction Hwy 4 to east junction Hwy 4 Grove City | $ 1,400,000 | Not Selected | NA |
61 | US71 | Redwood Falls | Reconstruction from 11th St to Quality Dr | $ 11,000,000 | Not Selected | NA |
32 | US59 | Marshall | Reconstruct Hwy 59 from G St to A St in Marshall. | $ 5,700,000 | 2031 | NA |
28 | US212 | Bird Island | Minor CPR and diamond grinding from 0.4 mi. W. of 10th St. to 1st St. (Bird Island) | $ 200,000 | Not selected | NA |
25 | US59 | Marshall | Resurface Hwy 59 from H St to A St in Marshall. | $ 498,368 | 2024 | NA |
16 | Hwy 22 | Eden Valley | Thin mill and overlay from Hwy 55 to Meeker / Stearns Co. Line (Eden Valley) | $ 100,000 | Not selected | NA |
View more detailed scores (Excel).
Score | Community | Route | Description | High-Level Cost Estimate for Planning Purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
88 | Litchfield | US12 | Medium mill and overlay Highway 22 to Meeker County Road 34 (Litchfield) | $700,000 | 2023 | NA |
84 | Marshall | Hwy 19 | Concrete reconstruction from 2nd St. to Minnesota St. (Marshall) | $5,700,000 | 2025 | NA |
84 | Willmar | US12 | Medium mill and overlay from 11th St. W. to 6th St. E. (Willmar) | $2,000,000 | 2027 | NA |
79 | Marshall | US59 | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 (Marshall) | $7,800,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Marshall | Hwy 19 | Concrete reconstruction from Minnesota St. to Highway 23 (Marshall) | $13,600,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Marshall | Hwy 19 | Concrete reconstruction from Lyon County Road 7 to 2nd St. (Marshall) | $8,000,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
73 | Pipestone | US75 | Reconstruction from Highway 30 to 4th St N (Pipestone) | $4,500,000 | Not selected | This segment was rehabilitated in 2018 |
73 | Glencoe | Hwy 22 | Medium mill and overlay from Highway 212 to Cedar Ave (Glencoe) | $600,000 | 2023 | NA |
72 | Pipestone | Hwy 30 | Reconstruction from 4th Ave. W. to Highway 75 (Pipestone) | $11,400,000 | Not selected | This segment was rehabilitated in 2017 |
71 | Clara City | Hwy 23 | Medium mill and overlay Highway 7 to Bridge number 12012 (Clara City) | $400,000 | Not selected | This segment was rehabilitated in 2017 |
69 | Morton | Hwy 19 | Reconstruction from Centennial Dr. to Brook Dr. (Morton) | $1,900,000 | Not selected | This segment was rehabilitated in 2016 |
69 | Canby | US75 | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 (Canby) | $8,700,000 | Not selected | This segment was rehabilitated in 2016 |
69 | Olivia | US212 | Reconstruction from the west junction of Highway 71/320th sty to the East junction of Highway 71/13th St (Olivia) | $11,200,000 | Not selected | This segment was rehabilitated in 2014 |
66 | Ivanhoe | Hwy 19 | Medium mill and overlay from Rebecca St. to Lincoln County Road 5 (Ivanhoe) | $300,000 | 2029 | Coordinated with a NHS pavement project |
66 | New London | Hwy 9 | Thick mill and overlay from Highway 23 to 1st Ave SE (New London) | $700,000 | Not selected | NA |
66 | Hutchinson | Hwy 15 | Reconstruction from 5th Ave to High Drive in Hutchinson | $1,300,000 | Not selected | NA |
66 | Montevideo | US212 | Medium mill and overlay from Yellow Medicine/Chippewa County Line to Hwy 29 in Montevideo | $200,000 | Not selected | NA |
65 | Renville | US212 | Reconstruction from Renville County Road 6 to 5th St E (Renville) | $6,500,000 | Not selected | NA |
65 | Clarkfield | Hwy 67 | Reconstruction Highway 59 to 6th St. (Clarkfield) | $2,700,000 | 2024 | Selected prior to policy (In 2019-2028 CHIP) |
64 | Litchfield | US12 | Resurfacing from Hwy 24 to 4th St in Litchfield | $500,000 | Not selected | NA |
63 | Litchfield | Hwy 22 | Concrete reconstruction from Pleasure Dr. to Highway 12 (Litchfield) | $5,200,000 | Not selected | NA |
63 | Madison | US75 | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave (Madison) | $2,000,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | Lake Benton | US14 | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $5,500,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
62 | Tracy | US14 | Medium mill and overlay from Lyon County Road 28 to 4th St. E. (Tracy) | $700,000 | 2028 | Coordinated with a Non-NHS pavement project |
62 | Grove City | US 12 | Reconstruction from west junction Hwy 4 to east junction Hwy 4 Grove City | $1,400,000 | Not selected | NA |
62 | Danube | US212 | Reconstruction from Freedom St to 2nd St in Danube | $2,600,000 | Not selected | NA |
61 | Redwood Falls | US71 | Reconstruction from 11th St to Quality Dr | $11,000,000 | Not selected | NA |
61 | Granite Falls | US212 | Reconstruction from 17th St to Hwy 23 in Granite Falls | $3,700,000 | Not selected | NA |
60 | Montevideo | Hwy 7 | Thin mill and overlay from Highway 29 to 28th St | $1,000,000 | 2026 | Due to a rapid drop in pavement quality, the district is planning a thin mill and overlay in 2026 to extend the current lifespan of this segment. |
59 | Fairfax | Hwy 19 | Reconstruction from 1st St to Highway 4 (Fairfax) | $4,000,000 | Not selected | NA |
57 | Dawson | US212 | Reconstruction from Highway 119 to Lac qui Parle County 39 (Dawson) | $7,700,000 | Not selected | NA |
55 | Redwood Falls | Hwy 67 | Reconstruction on Highway 71 to Veda Dr. (Redwood Falls) | $7,700,000 | Not selected | NA |
53 | Hutchinson | Hwy 15 | Thin mill and overlay from 5th Ave. to McLeod County Road 15 (Hutchinson) | $200,000 | Not selected | NA |
46 | Hutchinson | Hwy 7 | Major concrete pavement rehab and diamond grinding Buff St. to Technology Dr. (Hutchinson) | $1,300,000 | Not selected | NA |
38 | Hendricks | Hwy 271 | Thin mill and overlay from Railroad St. to Henderson St. (Hendricks) | $200,000 | Not selected | NA |
37 | Walnut Grove | US14 | Reconstruction from 8th St to 6th St in Walnut Grove | $3,700,000 | Not selected | NA |
35 | Olivia | US212 | Resurfacing from Hwy [@Description]71 to Renville County Road 14 in Olivia | $200,000 | Not selected | NA |
28 | Redwood Falls | Hwy 19 | Resurfacing from Minnesota St to Sunrise Blvd in Redwood falls | $400,000 | Not selected | NA |
28 | Bird Island | US212 | Resurfacing from 10th St to 1st St in Bird Island | $200,000 | Not selected | NA |
25 | Eden Valley | Hwy 22 | Thin mill and overlay Highway 55 to Meeker/Stearns County Line (Eden Valley) | $100,000 | Not selected | NA |
21 | Marshall | Hwy 68 | Resurfacing from Hwy 59 to Hwy 19 in Marshall | $200,000 | Not selected | NA |
20 | Iona | Hwy 267 | Thin mill and overlay from Murray County Road 4 to Ireland Ave. (Iona) | $100,000 | Not selected | NA |
16 | Cosmos | Hwy 4 | Thin mill and overlay from Southern Cross Ave. to Northern Cross Ave. (Cosmos) | $400,000 | Not selected | NA |
16 | Eden Valley | Hwy 22 | Thin mill and overlay from Hwy 55 to Meeker/Stearns County Line in Eden Valley | $100,000 | Not selected | NA |
View more detailed scores (Excel).
Score | Community | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|---|
88 | Litchfield | US12 | Medium mill and overlay from Highway 22 to Meeker County Road 34 | $700,000 | 2023 | NA |
84 | Marshall | Hwy 19 | Reconstruction from 2nd St to Minnesota St | $5,700,000 | 2025 | NA |
84 | Willmar | US12 | Medium mill and overlay from near 11th St W to 6th St E | $900,000 | 2027 | NA |
79 | Marshall | US59 | Reconstruction from Highway 23 to the junction of Highway 68/Highway 19 | $7,800,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
76 | Marshall | Hwy 19 | Reconstruction from Minnesota St to Highway 23 | $14,000,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
75 | Marshall | Hwy 19 | Reconstruction from Lyon County Road 7 to 2nd St | $8,000,000 | Not selected | A nearby section of roadway is programmed for reconstruction. Waiting to avoid multiple years of detours. |
73 | Pipestone | US75 | Reconstruction from Highway 30 to 4th St N | $4,500,000 | Not selected | This segment was rehabilitated in 2018 |
73 | Glencoe | Hwy 22 | Medium mill and overlay from Highway 212 to Cedar Ave | $600,000 | 2023 | |
72 | Pipestone | Hwy 30 | Reconstruction from 4th Ave W to Highway 75 | $11,000,000 | Not selected | This segment was rehabilitated in 2017 |
71 | Clara City | Hwy 23 | Medium mill and overlay from near Highway 7 to Bridge number 12012 | $400,000 | Not selected | This segment was rehabilitated in 2017 |
69 | Morton | Hwy 19 | Reconstruction from Centenial Dr to Brook Dr | $1,900,000 | Not selected | This segment was rehabilitated in 2016 |
69 | Canby | US75 | Reconstruction from near St Olaf Ave S to Yellow Medicine County Road 3 | $8,700,000 | Not selected | This segment was rehabilitated in 2016 |
69 | Olivia | US212 | Reconstruction from the west junction of Highway 71/320th St to the East junction of Highway 71/13th St | $11,000,000 | Not selected | This segment was rehabilitated in 2014 |
66 | Ivanhoe | Hwy 19 | Medium mill and overlay from Rebecca St to Lincoln County Road 5 | $300,000 | 2029 | Coordinated with a NHS pavement project |
66 | New London | Hwy 9 | Thick mill and overlay from Highway 23 to 1st Ave SE | $700,000 | Not selected | |
65 | Renville | US212 | Reconstruction from Renville County Road 6 to 5th St E | $6,500,000 | Not selected | |
65 | Clarkfield | Hwy 67 | Reconstruction Highway 59 to 6th St | $2,700,000 | 2023 | Selected prior to policy (In 2019-2028 CHIP) |
63 | Litchfield | Hwy 22 | Reconstruction from Pleasure Dr to E Commercial St | $5,200,000 | Not selected | |
63 | Madison | US75 | Medium mill and overlay from Highway 40 to 8th St and Highway 40 from Highway 75 to Western Ave | $600,000 | 2023 | This section has been prioritized because the pavement will be 17 years old |
63 | Lake Benton | US14 | Reconstruction from South Valley St to Highway 14 and from near the Railroad tracks to Jesse St | $6,200,000 | 2027 | The District has been coordinating with the City to replace their utilities. |
62 | Tracy | US14 | Medium mill and overlay from near the western city Limits to 4th St E | $700,000 | 2028 | Coordinated with a Non-NHS pavement project |
61 | Redwood Falls | US71 | Reconstruction from 11th St to Quality Dr | $11,000,000 | Not selected | NA |
60 | Montevideo | Hwy 7 | Thin mill and overlay from Highway 29 to 28th St | $1,200,000 | 2026 | Due to a rapid drop in pavement quality, the district is planning a thin mill and overlay in 2026 to extend the current lifespan of this segment. |
59 | Fairfax | Hwy 19 | Reconstruction from 1st St NW to Highway 4 | $4,000,000 | Not selected | NA |
57 | Dawson | US212 | Reconstruction from Highway 119 to Lac qui Parle County 39 | $7,700,000 | Not selected | NA |
55 | Redwood Falls | Hwy 67 | Reconstruction from Highway 71 to near Redwood County Road 101 | $7,700,000 | Not selected | NA |
53 | Hutchinson | Hwy 15 | Thin mill and overlay from 5th Ave to McLeod County Road 15 | $200,000 | Not selected | NA |
46 | Hutchinson | Hwy 7 | Major concrete rehabilitation and diamond grinding Bluff St to Technology Dr | $1,300,000 | Not selected | NA |
38 | Hendricks | Hwy 271 | Thin mill and overlay from Railroad St to Maple St | $200,000 | Not selected | NA |
25 | Eden Valley | Hwy 22 | Thin mill and overlay from Highway 55 to Meeker/Stearns County Line | $100,000 | Not selected | NA |
20 | Iona | Hwy 267 | Thin mill and overlay from Murray County Road 4 to Ireland Ave | $100,000 | Not selected | NA |
16 | Cosmos | Hwy 4 | Thin mill and overlay from southern city limits to Northern Cross Ave | $400,000 | Not selected | NA |