Non-National Highway System pavement projects
MnDOT Metro District
MnDOT scores stretches of highway based on a pavement need when selecting projects to include in the 10-year Capital Highway Investment Plan. Pavement needs on the National Highway System (NHS) are scored and selected separately from pavement needs off the system. MnDOT’s approach to managing pavements follows the guidance and targets in the Transportation Asset Management Plan and the planned outcomes in MnSHIP.
Pavement projects are scored and selected within each district. Potential pavement projects are identified by the Highway Pavement Management Application (HPMA) and by MnDOT District staff.
Once selected, MnDOT then identifies and evaluates alternatives and other needs, legal requirements, issues and opportunities in coordination with local partners, and considers public input. In the process, non-pavement work may be added to a pavement project or a pavement project may be combined with a nearby bridge project. The department follows a context-sensitive complete streets approach, which considers the needs of all users. The final project may address a substantial number of needs beyond the pavement need that precipitated the project. Projects may move years based on local coordination, project delivery, timing of other nearby construction projects, and funding shifts.
What was selected
Related links
- Metro District project selection
- Metro District National Highway System pavement projects
- Metro District Urban pavement projects
How the projects scored
The construction costs shown on this list represent a very rough estimate based on limited information available at the time selection decisions were made. Actual construction and delivery costs will change over time as projects go from a concept through the project development process and are eventually constructed. View more detailed scores (Excel).
Last updated October 2024
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Medium mill and overlay from I-35W to Yankee Doodle Rd | $6,900,000 | Not selected | RQI does not match on the ground conditions |
90 | Hwy 95 | Resurface road from Hwy 97 to Hwy 36 in Scandia and Stillwater | $17,004,000 | 2030 | Projected poor pavement conditions. |
90 | Hwy 95 | Resurface Hwy 95 from the Isanti county line to Hemingway Ave in North Branch | $14,185,600 | 2029 | NA |
87 | Hwy 120 | Resurface road on Hwy 120 (Century Ave) from 35 feet north of 4th St to Hwy 36 in Maplewood and bituminous mill and overlay on Hwy 120 (Century Ave) from Hwy 36 to Hwy 244 (County Rd E) in White Bear Lake | $8,770,000 | 2027 | Poor pavement conditions. |
85.5 | Hwy 13 | Resurface Hwy 13 from Eagle Creek Ave to CSAH 42 in Savage - Future Project | $37,229,649 | 2035 | Projected poor pavement conditions. |
84 | Hwy 5 | Repair road on Hwy 5 (W 78th St) from Hwy 41 (Hazeltine Blvd) to Eden Prairie Rd in Chanhassen | $21,724,572 | 2033 | Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues. |
82 | Hwy 97 | Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake | $17,700,000 | 2025 | Geometrics. Poor pavement conditions. Ped/bike trail needs. |
82 | US Hwy 61 | Resurface road, traffic signals, pedestrian improvements, drainage, curb and gutter and replace bridge #96093 on Hwy 61 from 0.2 miles north of Carver Ave to east junction of I-94 in St Paul | $25,259,000 | 2027, 2028 | Poor pavement conditions. |
81 | Hwy 5 | Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave | $600,000 | Not selected | Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down. |
81 | Hwy 97 | Resurface Hwy 97 from US Hwy 61 to Hwy 95 in Scandia | $11,716,661 | 2032 | Poor pavement conditions. Project has been deferred several times. |
79 | Hwy 96 | Resurface road from US Hwy 61 to Hwy 95 | $10,280,000 | Not selected | Projected poor pavement conditions. |
78 | Hwy 13 | Medium mill and overlay from Scott County Road 42 to Connelly Pkwy | $700,000 | Not selected | RQI does not match on the ground conditions |
78 | Hwy 3 | Medium mill and overlay from Hwy 50 to Dakota County Road 58 | $3,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years. |
77 | Hwy 120 | Resurface Hwy 120 from Brookview Dr to 4th St in Maplewood | $2,763,119 | 2032 | Projected poor pavement conditions. |
77 | Hwy 21 | Medium mill and overlay from Hwy 19 to Scott County Road 37 | $300,000 | Not selected | Program limited by available funding. Short urban section. |
77 | Hwy 3 | Resurface road on Hwy 3 from Rice County line to Hwy 50 in Hampton | $12,933,131 | 2029 | Poor pavement conditions. |
76 | Hwy 21 | Medium mill and overlay from Sawmill Rd to Mill St | $300,000 | Not selected | RQI does not match on the ground conditions |
74 | Hwy 13 | Medium mill and overlay from Hwy 13 to Dakota Ave | $700,000 | Not Selected | Program limited by available funding. |
74 | Hwy 51 | Medium mill and overlay from Grey Fox Rd to I694 | $300,000 | Not selected | Recently repaired in 2021 |
73 | 952A | Resurface road, construct separated bike lanes, signal, ADA and sidewalk work on Hwy 952A/Hwy 47 (University Ave) from Hwy 65 (Central Ave) to I-35W in Mpls | $9,500,000 | 2027 | Poor pavement conditions plus ADA and bike needs. 2726-87 |
73 | Hwy 13 | Medium mill and overlay legs to and from Scott County Road 21 roundabout | $300,000 | Not selected | Very new pavement either side of new roundabout. |
73 | Hwy 21 | Medium mill and overlay from 7th St to Sawmill Rd | $4,300,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 3 | Medium mill and overlay from Bridge 19045 to Mendota Rd | $500,000 | Not selected | RQI does not match on the ground conditions |
72 | Hwy 121 | Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from WB TH62 loop to W 58th St and CR22 from W 58th St to W 56th St in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls and Extend porkchop on Hwy 121 ( Lyndale Conn) at WB intersection with the WB Hwy 62 loop in Mpls | $2,192,000 | 2025 | Poor pavement conditions. |
72 | Hwy 13 | Medium mill and overlay from Dakota to Washburn ave | $1,600,000 | Not Selected | Program limited by available funding. |
72 | Hwy 3 | Reconstruct Hwy 3 (Robert St) from Amana Trail to Hwy 62 in Settler's Ridge | $13,603,200 | 2033 | RQI does not match on the ground conditions |
72 | Hwy 95 | Medium mill and overlay from Point Rd to I-94 | $2,800,000 | Not selected | RQI does not match on the ground conditions |
72 | US Hwy 61 | Medium mill and overlay from US 10 to 70th St | $8,500,000 | Not Selected | Program limited by available funding. |
72 | US Hwy 61 | Medium mill and overlay from Hwy 96 to White Bear Lake CL | $1,000,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 13 | Medium mill and overlay from Yankee Doodle Rd to I494 | $900,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 3 | Medium mill and overlay from Hwy 149 to Bridge 19045 | $1,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life. |
70 | Hwy 13 | Repair concrete from I-494 to Hwy 55 in Eagan and Mendota Heights | $6,618,480 | 2029 | Poor pavement conditions. 2020 Remaining service life 0 to 5 years. |
70 | Hwy 50 | Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 (Lillehei Ave) in Douglas Township | $8,000,000 | 2026 | Poor pavement conditions. |
69 | Hwy 149 | Medium mill and overlay from Hwy 3 to Albano Tr | $200,000 | Not selected | Program limited by available funding. |
69 | Hwy 3 | Resurface Hwy 3 (S Robert Trl) from 145th St to Hwy 149 (Dodd Rd) in Rosemount | $6,045,603 | 2033 | NA |
69 | Hwy 5 | Medium mill and overlay from Birch St to Scandia Rd | $1,100,000 | Not selected | Program limited by available funding. |
69 | US Hwy 61 | Medium mill and overlay from Frenchman Rd to Trailer Pk entrance | $400,000 | Not selected | Program limited by available funding. |
68 | Hwy 101 | Medium mill and overlay from NB split with US169 to SB merge with US169 | $3,400,000 | Not Selected | Program limited by available funding. |
68 | Hwy 13 | Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout | $2,000,000 | Not selected | Program limited by available funding. |
68 | Hwy 95 | Medium mill and overlay from Mulberry to St Saint Croix Trail | $500,000 | Not selected | Program limited by available funding. |
68 | US Hwy 61 | Medium mill and overlay from White Bear Lake Cr to Frenchman Rd | $1,800,000 | Not selected | Program limited by available funding. |
68 | US Hwy 61 | Medium mill and overlay from 250th St to Chisago County Road 31/32 | $700,000 | Not selected | Program limited by available funding. |
67 | Hwy 5 | Resurface road from St. Clair Ave to bridge over I94, resurface Hwy 5 bridge in St. Paul. | $19,970,000 | 2029 | Poor pavement conditions. |
67 | US Hwy 61 | Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St | $700,000 | Not selected | Program limited by available funding. |
67 | US Hwy 61 | Medium mill and overlay from Chisago County Road 31/22 to 267th St | $200,000 | Not selected | Program limited by available funding. |
66 | Hwy 13 | Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave | $700,000 | Not Selected | Program limited by available funding. |
66 | Hwy 95 | Medium mill and overlay from St Croix Trail to Point Rd | $1,000,000 | Not selected | Program limited by available funding. |
65 | Hwy 13 | Medium mill and overlay from Dakota County Line to Washburn Ave | $700,000 | Not Selected | Program limited by available funding. |
65 | Hwy 5 | Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 | $200,000 | Not selected | Program limited by available funding. |
64 | Hwy 149 | Medium mill and overlay from Albano Tr to Hwy 55 | $2,600,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Sunrise River to Taylors Falls | $6,600,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Bailey Rd to US Hwy 61 | $4,100,000 | Not selected | Program limited by available funding. |
64 | US Hwy 61 | Medium mill and overlay from 170th St to Hwy 97 | $1,900,000 | Not selected | Program limited by available funding. |
62 | Hwy 243 | Medium mill and overlay from Hwy 95 to St Croix River | $700,000 | Not selected | Program limited by available funding. |
62 | Hwy 95 | Medium mill and overlay from I-94 to Valley Creek | $700,000 | Not selected | Program limited by available funding. |
61 | Hwy 101 | Minor concrete pavement repair, from CR 38 to US 10 | $3,500,000 | Not Selected | Poor pavement conditions. |
61 | Hwy 95 | Medium mill and overlay from Valley Creek to Bailey Rd | $1,200,000 | Not selected | Program limited by available funding. |
59 | Hwy 5 | Medium mill and overlay from Hwy 25 to Carver County Road 10 | $1,900,000 | Not selected | Program limited by available funding. |
59 | Hwy 51 | Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills | $6,477,000 | 2026 | Poor pavement conditions. ADA, bike/ped, and drainage needs. |
58 | Hwy 149 | Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St | $2,500,000 | Not selected | Program limited by available funding. |
57 | Hwy 149 | Medium mill and overlay from I-494 to Mendota Heights Rd | $600,000 | Not selected | Program limited by available funding. |
57 | Hwy 50 | Medium mill and overlay from Hwy 3 to US52 | $4,300,000 | Not selected | Program limited by available funding. |
55 | Hwy 121 | Medium mill and overlay from I35W to Pedestrian bridge | $300,000 | Not Selected | Program limited by available funding. |
55 | Hwy 5 | Medium mill and overlay from Carver County Road 10 to Oak Ave | $200,000 | Not selected | Program limited by available funding. |
47 | Hwy 19 | Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project | $2,700,000 | Not selected | NA |
47 | Hwy 95 | Thin mill and overlay from I-94 to Mulberry St | $18,000,000 | Not selected | Projected poor pavement conditions. 2020 RSL is 4 to 6 years. |
46 | Hwy 101 | Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego | $12,674,000 | 2027 | Poor pavement conditions. |
44 | Hwy 95 | Medium mill and overlay from I-94 to .5 miles S of I-94 | $500,000 | Not selected | Program limited by available funding. |
43 | Hwy 5 | Medium mill and overlay from I-494 to Hennepin/Ramsey County line | $3,900,000 | Not Selected | Program limited by available funding. |
40 | Hwy 13 | Medium mill and overlay from Washburn Ave to I-35 | $1,400,000 | Not Selected | Program limited by available funding. |
40 | Hwy 56 | Resurface road on Hwy 56 (Emery Ave) from the Goodhue/Dakota County line to Hwy 52/Hwy 50 (Hampton Ave) in Randolph | $9,486,129 | 2033 | Projected poor pavement conditions. 2020 RSL 4 to 11 years. |
39 | Hwy 97 | Minor rehabilitation within roundabout at US Hwy 61 | $100,000 | Not selected | Newer concrete roundabouts. |
27 | Hwy 13 | Medium mill and overlay from Hwy 13 to Hwy 149 | $200,000 | Not selected | Program limited by available funding. |
27 | Hwy 13 | Medium mill and overlay from Connelly Pkwy to old Hwy 101 | $2,000,000 | Not selected | Program limited by available funding. |
25 | Hwy 5 | Resurface road, improve ADA, lighting, traffic signal replacement, bridge repairs on TH5 from Munster Ave to 0.02 miles east of St Clair Ave in St Paul | $27,117,000 | 2028 | Poor pavement conditions. |
25 | Hwy 51 | Resurface Hwy 51 (Snelling) from W 7th to Dayton Ave in St. Paul | $13,210,469 | 2030 | Poor pavement conditions. |
24 | Hwy 5 | Resurface Hwy 5 from County Rd 11 to Hwy 41 in Chanhassen | $6,540,000 | 2032 | Projected poor pavement conditions. |
22 | Hwy 149 | Resurface Hwy 149 (Dodd Rd) from Hwy 55 to bridge over I-494 in Eagan | $4,944,240 | 2033 | Preventive maintenance. |
21 | Hwy 20 | Resurface Hwy 20 from Hwy 19 to Hwy 50 in Cannon Falls | $6,540,000 | 2032 | Poor pavement conditions. 2020 RSL 2 to 10 years. |
21 | Hwy 95 | Resurface Hwy 95 from Hwy 8 to Hwy 97 in North Branch | $19,620,000 | 2032 | NA |
19 | Hwy 47 | Thin mill and overlay from Cree St to Pederson Dr | $2,400,000 | Not Selected | Safety. Poor pavement conditions. |
18 | Hwy 95 | Resurface Hwy 95 (St Croix Trl) from Hemingway Ave to Manning Bridge over Sunrise River in North Branch | $9,168,714 | 2031 | Poor pavement conditions. 2020 RSL 0 to 5 years. |
16 | Hwy 51 | Resurface Hwy 51 from Dayton Ave to Pierce Butler in St. Paul | $14,713,584 | 2034 | NA |
10 | Hwy 244 | Resurface Hwy 244 (Dellwood/Mahtomedi Ave) from CR 12 (Stillwater Rd) in Mahtomedi to Hwy 96 (Dellwood Rd) in Dellwood | $6,299,000 | 2026 | Poor pavement conditions. |
0 | Hwy 20 | Resurface Hwy 20 (Cannon Falls Blvd) from River Road in Cannon Falls to 280th St E at Goodhue and Dakota County line in Cannon Falls Township | $3,420,000 | 2025 | NA |
Previous years
View more detailed scores (Excel).
Last updated October 2023
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
13.5 | Hwy 284 | Resurface Hwy 284 from 122nd Street to Sparrow Road. | $6,862,524 | 2031 | NA |
15 | Hwy 56 | Resurface road from the Goodhue/Dakota County line to Hwy 50/US 52 | $7,252,392 | 2033 | Projected poor pavement conditions. 2020 RSL 4 to 11 years. |
18 | Hwy 77 | Resurface Hwy 77 (Cedar) from 138th St (CR 23) to the Dakota-Hennepin County line in Apple Valley | $45,096,000 | 2026, 2027 | Poor pavement conditions. |
21 | Hwy 20 | Resurface road from Hwy 19 to Hwy 50 | $5,000,000 | 2032 | Poor pavement conditions. 2020 RSL 2 to 10 years. |
21 | Hwy 95 | Resurface Hwy 95 from Jct Hwy 8 to Hwy 97. | $15,000,000 | 2032 | NA |
24 | Hwy 5 | Resurface road from County Rd 11 to Hwy 41 | $5,000,000 | 2032 | Projected poor pavement conditions. |
25 | Hwy 51 | Resurface road from W 7th to Dayton Ave | $10,099,747 | 2030 | Poor pavement conditions. |
27 | Hwy 13 | Medium mill and overlay from Connelly Pkwy to old Hwy 101 | $2,000,000 | Not selected | Program limited by available funding. |
27 | Hwy 13 | Medium mill and overlay from Hwy 13 to Hwy 149 | $200,000 | Not selected | Program limited by available funding. |
29 | US61 | Medium mill and overlay from 267th St to I35 | $300,000 | Not selected | Program limited by available funding. |
29 | Hwy 65 | Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 | $3,100,000 | Not Selected | Program limited by available funding. |
31 | Hwy 7 | Repair road from W end of 494 bridge. to I-494 | $500,000 | 2032 | Poor pavement conditions. |
32 | US61 | Medium mill and overlay from RP155 to 170th ST | $200,000 | Not selected | Program limited by available funding. |
33 | US61 | Resurface road from 3rd St. to US 10 | $6,250,000 | 2032 | Poor pavement conditions. |
34 | US61 | Resurface road and repair bridge 19075 on Hwy 61 from N Jct Hwy 316 to 4th St in Hastings | $10,867,000 | 2027 | Poor pavement conditions. |
35 | Hwy 97 | Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake | $15,884,000 | 2025 | Geometrics. Poor pavement conditions. Ped/bike trail needs. |
39 | Hwy 97 | Minor rehabilitation within roundabout at US61 | 100000 | Not selected | Newer concrete roundabouts. |
40 | Hwy 13 | Medium mill and overlay from Washburn Ave to I-35 | $1,400,000 | Not Selected | Program limited by available funding. |
43 | Hwy 13 | Reconstruct road from Eagle Creek Ave to County Rd 42 | $3,500,000 | Not selected | Projected poor pavement conditions. |
43 | Hwy 5 | Medium mill and overlay from I-494 to Hennepin/Ramsey County line | $3,900,000 | Not Selected | Program limited by available funding. |
43 | Hwy 65 | Repair road from 217th Ave to Anoka-Isanti County line | $18,000,000 | Not Selected | Repair early distresses. |
44 | Hwy 95 | Medium mill and overlay from I-94 to .5 miles S of I-94 | $500,000 | Not selected | Program limited by available funding. |
46 | Hwy 101 | Repair and resurface road, update guardrail and median barrier, signal replacement, ADA curb ramps, drainage, turn lane extension and pork chop island realignment on Hwy 101 from I-94 in Rogers to CR 38 (70th St NE) in Otsego | $12,674,000 | 2027 | Poor pavement conditions. |
47 | Hwy 19 | Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project | $2,700,000 | Not selected | NA |
47 | Hwy 95 | Thin mill and overlay from I-94 to Mulberry St | 18000000 | Not selected | Projected poor pavement conditions. 2020 RSL is 4 to 6 years. |
55 | Hwy 5 | Medium mill and overlay from Carver County Road 10 to Oak Ave | $200,000 | Not selected | Program limited by available funding. |
55 | Hwy 121 | Medium mill and overlay from I35W to Pedestrian bridge | $300,000 | Not Selected | Program limited by available funding. |
57 | Hwy 149 | Medium mill and overlay from I-494 to Mendota Heights Rd | $600,000 | Not selected | Program limited by available funding. |
57 | Hwy 50 | Medium mill and overlay from Hwy 3 to US52 | $4,300,000 | Not selected | Program limited by available funding. |
57 | US61 | Medium mill and overlay from RP163 to 250TH St | $200,000 | Not selected | Program limited by available funding. |
58 | Hwy 149 | Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St | 2500000 | Not selected | Program limited by available funding. |
59 | Hwy 5 | Medium mill and overlay from Hwy 25 to Carver County Road 10 | $1,900,000 | Not selected | Program limited by available funding. |
60 | Hwy 77 | Medium mill and overlay from Minnesota River bridge to I-494 | $3,100,000 | Not Selected | Program limited by available funding. |
60 | Hwy 5 | Repair road from Hwy 41 to Eden Prairie Rd | $16,609,000 | 2033 | Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues. |
61 | Hwy 95 | Medium mill and overlay from Valley Creek to Bailey Rd | 1200000 | Not selected | Program limited by available funding. |
61 | Hwy 101 | Minor concrete pavement repair, from CR 38 to US 10 | $3,500,000 | Not Selected | Poor pavement conditions. |
62 | Hwy 243 | Medium mill and overlay from Hwy 95 to St Croix River | $700,000 | Not selected | Program limited by available funding. |
62 | Hwy 95 | Medium mill and overlay from I-94 to Valley Creek | 700000 | Not selected | Program limited by available funding. |
63 | US61 | Medium mill and overlay from 70th St to Carver Ave | $4,400,000 | Not Selected | Program limited by available funding. |
63 | US61 | Medium mill and overlay from Trailer Pk entrance to 170th St | $1,000,000 | Not selected | Program limited by available funding. |
64 | Hwy 149 | Medium mill and overlay from Albano Tr to Hwy 55 | $2,600,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Bailey Rd to US61 | 4100000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Sunrise River to Taylors Falls | $6,600,000 | Not selected | Program limited by available funding. |
64 | US61 | Medium mill and overlay from 170th St to Hwy 97 | $1,900,000 | Not selected | Program limited by available funding. |
65 | Hwy 13 | Medium mill and overlay from Dakota County Line to Washburn Ave | $700,000 | Not Selected | Program limited by available funding. |
65 | Hwy 5 | Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 | $200,000 | Not selected | Program limited by available funding. |
66 | Hwy 7 | Medium mill and overlay from I-494 to Shady Oak Road | 1000000 | Not Selected | Program limited by available funding. |
66 | Hwy 95 | Medium mill and overlay from St Croix Trail to Point Rd | 1000000 | Not selected | Program limited by available funding. |
66 | Hwy 13 | Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave | $700,000 | Not Selected | Program limited by available funding. |
67 | Hwy 7 | Medium mill and overlay from Railroad bridge to Hwy 100 | $900,000 | Not Selected | Program limited by available funding. |
67 | US61 | Medium mill and overlay from Chisago County Road 31/22 to 267th St | $200,000 | Not selected | Program limited by available funding. |
67 | US61 | Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St | $700,000 | Not selected | Program limited by available funding. |
68 | Hwy 95 | Medium mill and overlay from Mulberry to St Saint Croix Trail | $500,000 | Not selected | Program limited by available funding. |
68 | US61 | Medium mill and overlay from 250th St to Chisago County Road 31/32 | $700,000 | Not selected | Program limited by available funding. |
68 | US61 | Medium mill and overlay from White Bear Lake Cr to Frenchman Rd | $1,800,000 | Not selected | Program limited by available funding. |
68 | Hwy 13 | Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout | $2,000,000 | Not selected | Program limited by available funding. |
68 | Hwy 65 | Medium mill and overlay from 26th St to 10th ST | $1,300,000 | Not Selected | Program limited by available funding. |
68 | Hwy 101 | Medium mill and overlay from NB split with US169 to SB merge with US169 | $3,400,000 | Not Selected | Program limited by available funding. |
69 | Hwy 149 | Medium mill and overlay from Hwy 3 to Albano Tr | $200,000 | Not selected | Program limited by available funding. |
69 | US61 | Medium mill and overlay from Frenchman Rd to Trailer Pk entrance | $400,000 | Not selected | Program limited by available funding. |
69 | Hwy 3 | Resurface road from 145th St to Hwy 149 | $4,622,021 | 2033 | NA |
69 | Hwy 5 | Medium mill and overlay from Birch St to Scandia Rd | $1,100,000 | Not selected | Program limited by available funding. |
70 | Hwy 51 | Resurface road and ADA improvements on Hwy 51 (Snelling Ave) from Grand Ave to St Clair Ave in St Paul | $2,183,000 | 2024 | Poor pavement conditions. |
70 | Hwy 65 | Resurface road from NE 37th Ave CL to 53rd Ave NE | $5,270,000 | 2033 | Projected poor pavement conditions. |
70 | Hwy 101 | Resurface road from Hwy 5 (W 78th St) to CSAH 62/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie | $1,887,000 | 2024 | Poor pavement conditions. |
71 | Hwy 13 | Medium mill and overlay from Yankee Doodle Rd to I494 | $900,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 3 | Medium mill and overlay from Hwy 149 to Bridge 19045 | $1,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life. |
72 | Hwy 7 | Resurface road from TH 25 to Carver County Line | $10,522,000 | 2033 | Projected poor pavement conditions. |
72 | Hwy 95 | Medium mill and overlay from Point Rd to I-94 | $2,800,000 | Not selected | RQI does not match on the ground conditions |
72 | US61 | Medium mill and overlay from US 10 to 70th St | $8,500,000 | Not Selected | Program limited by available funding. |
72 | US61 | Medium mill and overlay from Hwy 96 to White Bear Lake CL | $1,000,000 | Not selected | RQI does not match on the ground conditions |
72 | Hwy 13 | Medium mill and overlay from Dakota to Washburn ave | $1,600,000 | Not Selected | Program limited by available funding. |
72 | Hwy 3 | Reconstruct the road from Amana Trail to Hwy 62 | $10,400,000 | 2033 | NA |
73 | Hwy 7 | Medium mill and overlay from Texas Ave to Railroad Bridge | 700000 | Not Selected | RQI does not reflect on the ground conditions |
73 | Hwy 13 | Medium mill and overlay legs to and from Scott County Road 21 roundabout | $300,000 | Not selected | Very new pavement either side of new roundabout. |
73 | Hwy 21 | Medium mill and overlay from 7th St to Sawmill Rd | $4,300,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 3 | Medium mill and overlay from Bridge 19045 to Mendota Rd | $500,000 | Not selected | RQI does not match on the ground conditions |
74 | Hwy 284 | Reconstruct road from US 212 to 122nd St | $4,480,000 | 2031 | Many issues with this pavement including geometric and ADA needs. RQI data not reflective of the poor pavement conditions. |
74 | Hwy 51 | Medium mill and overlay from Grey Fox Rd to I694 | $300,000 | Not selected | Recently repaired in 2021 |
74 | Hwy 13 | Medium mill and overlay from Hwy 13 to Dakota Ave | $700,000 | Not Selected | Program limited by available funding. |
76 | Hwy 50 | Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 in Douglas Township | $7,196,000 | 2026 | Poor pavement conditions. |
76 | Hwy 21 | Medium mill and overlay from Sawmill Rd to Mill St | $300,000 | Not selected | RQI does not match on the ground conditions |
77 | Hwy 120 | Resurface Hwy 120 from BrookView Dr to 4th St. | $2,112,476 | 2032 | Projected poor pavement conditions. |
77 | Hwy 21 | Medium mill and overlay from Hwy 19 to Scott County Road 37 | $300,000 | Not selected | Program limited by available funding. Short urban section. |
77 | Hwy 3 | Resurface road from Rice County line to Hwy 50 | $10,207,680 | 2029 | Poor pavement conditions. |
78 | Hwy 7 | Medium mill and overlay from Shady Oak Rd to Texas Ave | $3,000,000 | Not Selected | RQI does not reflect on the ground conditions |
78 | Hwy 13 | Medium mill and overlay from Scott County Road 42 to Connelly Pkwy | $700,000 | Not selected | RQI does not match on the ground conditions |
78 | Hwy 3 | Medium mill and overlay from Hwy 50 to Dakota County Road 58 | $3,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years. |
78 | Hwy 65 | Repair pavement and replace bridges 6817 ( new bridge # 02X06) and 9417 (02X07) over Coon Creek, replace box culvert bridge 9465 and ADA, signal replacement on Hwy 65 (Central Ave) from CR 10 (Mounds View Blvd) in Spring Lake Park to 217th Ave in East Bethel, cable median barrier from Bunker Lake Blvd to 237th | $40,546,000 | 2024 | Poor pavement conditions. |
78 | Hwy 65 | Resurface road form 53rd Ave NE to South Moore Lake Dr | $3,000,000 | Not Selected | Poor pavement conditions. |
79 | Hwy 51 | Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills | $6,678,000 | 2026 | Poor pavement conditions. ADA, bike/ped, and drainage needs. |
79 | Hwy 96 | Resurface road from US 61 to Hwy 95 | $10,280,000 | Not selected | Projected poor pavement conditions. |
81 | Hwy 7 | Resurface road from the Hennepin/Carver County line to Division St and replace bridge over County Road 82. | $31,280,000 | 2029 | Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride. |
81 | Hwy 97 | Resurface road from US61 to Hwy 95 | $8,957,692 | 2032 | Poor pavement conditions. Project has been deferred several times. |
81 | US61 | Thin mill and overlay from Goodhue/Dakota County Line to Hwy 316 | $9,000,000 | Not Selected | Projected poor pavement conditions. |
81 | Hwy 5 | Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave | $600,000 | Not selected | Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down. |
82 | US61 | Resurface road, traffic signals, pedestrian improvements, drainage, curb and gutter and replace bridge #96093 on Hwy 61 from 0.2 miles north of Carver Ave to east junction of I-94 in St Paul. | $10,000,000 | 2028 | Poor pavement conditions. |
87 | Hwy 95 | Resurface Hwy 95 from Hemingway Ave to Manning Bridge over Sunrise River. | $7,009,720 | 2031 | Poor pavement conditions. 2020 RSL 0 to 5 years. |
90 | Hwy 95 | Resurface Hwy 95 from the Isanti county line to Hemingway Ave | $9,002,400 | 2028 | NA |
90 | Hwy 95 | Resurface road from Hwy 97 to Hwy 36 | $13,000,000 | 2030 | Projected poor pavement conditions. |
90 | Hwy 13 | Medium mill and overlay from I-35W to Yankee Doodle Rd | $6,900,000 | Not selected | RQI does not match on the ground conditions |
61 | Hwy 101 | Minor concrete pavement repair, from CR 38 to US 10 | $3,500,000 | Not Selected | Poor pavement conditions. |
View more detailed scores (Excel).
Last updated October 2022
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
15 | Hwy 56 | Resurface road from the Goodhue/Dakota County line to Hwy 50/US 52 | $5,180,000 | 2031 | Projected poor pavement conditions. 2020 RSL 4 to 11 years. |
18 | Hwy 77 | Resurface Hwy 77 (Cedar) from 138th St (CR 23) in Bloomington to the Dakota-Hennepin County line in Apple Valley | $35,838,000 | 2026, Future | Poor pavement conditions. |
19 | Hwy 47 | Resurface road and ADA improvements on Hwy 47 (University Ave) from Cree St to Anoka/Isanti County line in St Francis | $2,662,000 | 2025 | Safety. Poor pavement conditions. |
20 | Hwy 244 | Rebuild road from County Rd. 12 to Hwy 96 | $4,000,000 | 2031 | NA |
21 | Hwy 20 | Resurface road from Hwy 19 to Hwy 50 | $5,000,000 | 2032 | Poor pavement conditions. 2020 RSL 2 to 10 years. |
24 | Hwy 5 | Resurface road from County Rd 11 to Hwy 41 | $5,000,000 | 2032 | Projected poor pavement conditions. |
25 | Hwy 51 | Resurface road from W 7th to Dayton Ave | $6,100,000 | 2030 | Poor pavement conditions. |
27 | Hwy 13 | Medium mill and overlay from Connelly Pkwy to old Hwy 101 | $2,000,000 | Not selected | Program limited by available funding. |
27 | Hwy 13 | Medium mill and overlay from Hwy 13 to Hwy 149 | $200,000 | Not selected | Program limited by available funding. |
29 | Hwy 65 | Medium mill and overlay from south of E Moore Lake Dr to Anoka County Road 10 | $3,100,000 | Not Selected | Program limited by available funding. |
30 | Hwy 47 | Medium mill and overlay from US10 to .4 miles NW of US10 | $300,000 | Not selected | Program limited by available funding. |
31 | Hwy 7 | Repair road from W end of 494 bridge. to I-494 | $500,000 | 2030 | Poor pavement conditions. |
32 | Hwy 47 | Resurface road from 40th Ave to US 10 | $10,500,000 | 2030 | Poor pavement conditions. |
33 | Hwy 47 | Resurface Hwy 47 from 142nd Ave to 153rd Ave (Alpine Dr) | $1,600,000 | 2028 | Projected poor pavement conditions. Project has previously been deferred. 2020 RSL 5 years. |
33 | Hwy 47 | Resurface road from 153rd Ave (Alpine Dr) to Cree St NW/St. Francis | $15,000,000 | 2029 | Projected poor pavement conditions. |
35 | Hwy 97 | Reconstruct road, trail on Hwy 97 (Scandia Trail N) from 0.24 miles east of I-35/Hwy 61 (Forest Blvd N) and add turn lanes and lighting on Hwy 97 (Scandia Trail N) from west of Everton Ave N to Hwy 61 (Forest Blvd N) in Forest Lake | $10,849,000 | 2025 | Geometrics. Poor pavement conditions. Ped/bike trail needs. |
39 | Hwy 21 | Resurface road from Mill St to US169 | $1,500,000 | 2031 | Poor pavement conditions. |
39 | Hwy 97 | Minor rehabilitation within roundabout at US61 | $100,000 | Not selected | Newer concrete roundabouts. |
40 | Hwy 13 | Medium mill and overlay from Washburn Ave to I-35 | $1,400,000 | Not Selected | Program limited by available funding. |
43 | Hwy 13 | Reconstruct road from Eagle Creek Ave to County Rd 42 | $3,500,000 | 2030 | Projected poor pavement conditions. |
43 | Hwy 5 | Medium mill and overlay from I-494 to Hennepin/Ramsey County line | $3,900,000 | Not Selected | Program limited by available funding. |
43 | Hwy 65 | Repair road from 217th Ave to Anoka-Isanti County line | $18,000,000 | 2029 | Repair early distresses. |
44 | Hwy 95 | Medium mill and overlay from I-94 to .5 miles S of I-94 | $500,000 | Not selected | Program limited by available funding. |
46 | Hwy 101 | Repair and resurface road from I-94 to County Rd 38 | $8,800,000 | 2026 | Poor pavement conditions. |
47 | Hwy 19 | Resurface road from the Leseuer/Scott county line to the Scott/Rice county line - Future Project | $2,700,000 | 2036 | NA |
47 | Hwy 95 | Thin mill and overlay from I-94 to Mulberry St | $18,000,000 | Not selected | Projected poor pavement conditions. 2020 RSL is 4 to 6 years. |
55 | Hwy 121 | Medium mill and overlay from I35W to Pedestrian bridge | $300,000 | Not Selected | Program limited by available funding. |
55 | Hwy 5 | Medium mill and overlay from Carver County Road 10 to Oak Ave | $200,000 | Not selected | Program limited by available funding. |
57 | Hwy 149 | Medium mill and overlay from I-494 to Mendota Heights Rd | $600,000 | Not selected | Program limited by available funding. |
57 | Hwy 50 | Medium mill and overlay from Hwy 3 to US52 | $4,300,000 | Not selected | Program limited by available funding. |
58 | Hwy 149 | Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St | $2,500,000 | Not selected | Program limited by available funding. |
59 | Hwy 5 | Medium mill and overlay from Hwy 25 to Carver County Road 10 | $1,900,000 | Not selected | Program limited by available funding. |
60 | Hwy 5 | Repair road from Hwy 41 to Eden Prairie Rd | $18,300,000 | 2032 | Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues. |
60 | Hwy 77 | Medium mill and overlay from Minnesota River bridge to I-494 | $3,100,000 | Not Selected | Program limited by available funding. |
61 | Hwy 101 | Minor concrete pavement repair, from CR 38 to US 10 | $3,500,000 | 2027 | Poor pavement conditions. |
61 | Hwy 47 | Medium mill and overlay from US 10 to Industry Ave | $700,000 | Not selected | Program limited by available funding. |
61 | Hwy 95 | Medium mill and overlay from Valley Creek to Bailey Rd | $1,200,000 | Not selected | Program limited by available funding. |
62 | Hwy 243 | Medium mill and overlay from Hwy 95 to St Croix River | $700,000 | Not selected | Program limited by available funding. |
62 | Hwy 95 | Medium mill and overlay from I-94 to Valley Creek | $700,000 | Not selected | Program limited by available funding. |
64 | Hwy 149 | Medium mill and overlay from Albano Tr to Hwy 55 | $2,600,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Bailey Rd to US61 | $4,100,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Sunrise River to Taylors Falls | $6,600,000 | Not selected | Program limited by available funding. |
65 | Hwy 13 | Medium mill and overlay from Dakota County Line to Washburn Ave | $700,000 | Not Selected | Program limited by available funding. |
65 | Hwy 5 | Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 | $200,000 | Not selected | Program limited by available funding. |
66 | Hwy 13 | Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota ave | $700,000 | Not Selected | Program limited by available funding. |
66 | Hwy 7 | Medium mill and overlay from I-494 to Shady Oak Road | $1,000,000 | Not Selected | Program limited by available funding. |
66 | Hwy 95 | Medium mill and overlay from St Croix Trail to Point Rd | $1,000,000 | Not selected | Program limited by available funding. |
67 | Hwy 5 | Resurface road from St. Clair Ave to bridge over I94 | $14,439,000 | 2028 | Poor pavement conditions. |
67 | Hwy 7 | Medium mill and overlay from Railroad bridge to Hwy 100 | $900,000 | Not Selected | Program limited by available funding. |
68 | Hwy 101 | Medium mill and overlay from NB split with US169 to SB merge with US169 | $3,400,000 | Not Selected | Program limited by available funding. |
68 | Hwy 13 | Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout | $2,000,000 | Not selected | Program limited by available funding. |
68 | Hwy 65 | Medium mill and overlay from 26th St to 10th ST | $1,300,000 | Not Selected | Program limited by available funding. |
68 | Hwy 95 | Medium mill and overlay from Mulberry to St Saint Croix Trail | $500,000 | Not selected | Program limited by available funding. |
69 | Hwy 149 | Medium mill and overlay from Hwy 3 to Albano Tr | $200,000 | Not selected | Program limited by available funding. |
69 | Hwy 3 | Resurface road from 145th St to Hwy 149 | $4,500,000 | 2031 | NA |
69 | Hwy 5 | Medium mill and overlay from Birch St to Scandia Rd | $1,100,000 | Not selected | Program limited by available funding. |
70 | Hwy 101 | Resurface road from Hwy 5 (W 78th St) to Hwy 10/Townline Rd, resurface road, drainage repairs and ADA improvements on Hwy 101 (W 192nd Ave) from Hwy 5 to Townline Rd in Chanhassen/Eden Prairie | $1,799,000 | 2024 | Poor pavement conditions. |
70 | Hwy 13 | Repair concrete from I-494 to Hwy 55 | $5,000,000 | 2031 | NA |
70 | Hwy 51 | Resurface road and ADA improvements on Hwy 51 (Snelling Ave) from Grand Ave to St Clair Ave in St Paul | $1,760,000 | 2024 | NA |
70 | Hwy 65 | Resurface road from 37th Ave NE Ave to 53rd NE | $5,200,000 | 2032 | Projected poor pavement conditions. |
71 | Hwy 13 | Medium mill and overlay from Yankee Doodle Rd to I494 | $900,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 3 | Medium mill and overlay from Hwy 149 to Bridge 19045 | $1,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life. |
72 | Hwy 121 | Resurface pavement, signals, drainage and ADA on Hwy 121 (Lyndale Conn) from 0.5 miles west of I-35W pedestrian bridge over Lyndale Ave to W 58th St in Mpls | $1,540,000 | 2025 | NA |
72 | Hwy 13 | Medium mill and overlay from Dakota to Washburn ave | $1,600,000 | Not Selected | Program limited by available funding. |
72 | Hwy 3 | Reconstruct the road from Amana Trail to Hwy 62 | $8,800,000 | 2031 | NA |
72 | Hwy 47 | Resurface, drainage, sidewalks and ADA work on Hwy 47 from Hwy 65 to just south of 27th northeast Ave in Mpls | $3,400,000 | 2027 | NA |
72 | Hwy 7 | Resurface road from TH 25 to Carver County Line | $6,500,000 | 2030 | Projected poor pavement conditions. |
72 | Hwy 95 | Medium mill and overlay from Point Rd to I-94 | $2,800,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 13 | Medium mill and overlay legs to and from Scott County Road 21 roundabout | $300,000 | Not selected | Very new pavement either side of new roundabout. |
73 | Hwy 21 | Medium mill and overlay from 7th St to Sawmill Rd | $4,300,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 3 | Medium mill and overlay from Bridge 19045 to Mendota Rd | $500,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 7 | Medium mill and overlay from Texas Ave to Railroad Bridge | $700,000 | Not Selected | RQI does not reflect on the ground conditions |
74 | Hwy 13 | Medium mill and overlay from Hwy 13 to Dakota Ave | $700,000 | Not Selected | Program limited by available funding. |
74 | Hwy 284 | Reconstruct road from US 212 to 122nd St | $11,000,000 | 2031 | NA |
74 | Hwy 51 | Medium mill and overlay from Grey Fox Rd to I694 | $300,000 | Not selected | Recently repaired in 2021 |
76 | Hwy 21 | Medium mill and overlay from Sawmill Rd to Mill St | $300,000 | Not selected | RQI does not match on the ground conditions |
76 | Hwy 50 | Resurface Hwy 50 (240th St) from Hwy 52 (Emery Ave/Rochester Blvd) in Hampton to Hwy 61 in Douglas Township | $6,568,000 | 2026 | Poor pavement conditions. |
77 | Hwy 120 | Resurface road from Ridge Dr to 4th St. | $1,200,000 | 2031 | Projected poor pavement conditions. |
77 | Hwy 21 | Medium mill and overlay from Hwy 19 to Scott County Road 37 | $300,000 | Not selected | Program limited by available funding. Short urban section. |
77 | Hwy 3 | Resurface road from Rice County line to Hwy 50 | $6,500,000 | 2028 | Poor pavement conditions. |
78 | Hwy 13 | Medium mill and overlay from Scott County Road 42 to Connelly Pkwy | $700,000 | Not selected | RQI does not match on the ground conditions |
78 | Hwy 3 | Medium mill and overlay from Hwy 50 to Dakota County Road 58 | $3,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years. |
78 | Hwy 65 | Repair pavement and replace bridges 6817 ( new bridge # 02X06) and 9417 (02X07) over Coon Creek and ADA, signal replacement on Hwy 65 (Central Ave) from CR 10 (Mounds View Blvd) in Spring Lake Park to 217th Ave in East Bethel, cable median barrier from Bunker Lake Blvd to 237th | $39,898,000 | 2024 | Poor pavement conditions. |
78 | Hwy 65 | Resurface road form 53rd Ave NE to South Moore Lake Dr | $3,000,000 | 2027 | Poor pavement conditions. |
78 | Hwy 7 | Medium mill and overlay from Shady Oak Rd to Texas Ave | $3,000,000 | Not Selected | RQI does not reflect on the ground conditions |
79 | Hwy 51 | Resurface, guardrail and ADA on Hwy 51 (Snelling Ave N) from north end of bridge over Hwy 36 in Roseville to 0.1 mile north of Grey Fox Rd in Arden Hills | $6,477,000 | 2026 | Poor pavement conditions. ADA, bike/ped, and drainage needs. |
79 | Hwy 96 | Resurface road from US 61 to Hwy 95 | $10,280,000 | 2030 | Projected poor pavement conditions. |
81 | Hwy 5 | Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave | $600,000 | Not selected | Not selected. Program limited by available funding. Short section of PCC before and after river bridge. Bridge surface is pulling average RQI down. |
81 | Hwy 7 | Resurface road from the Hennepin/Carver County line to Division St | $23,100,000 | 2031 | Recent resurfacing project. Construction in progress at time of DIV run. Roughness at intersection contribute to poor ride. |
81 | Hwy 97 | Resurface road from US61 to Hwy 95 | $8,500,000 | 2028 | Poor pavement conditions. Project has been deferred several times. |
87 | Hwy 120 | Reconstruct road from 4th St in Maplewood to Hwy 244 in White Bear Lake | $15,559,000 | 2027 | NA |
87 | Hwy 95 | Resurface Hwy 95 from the Isanti county line to the bridge over Sunrise river | $14,800,000 | 2028 | Poor pavement conditions. 2020 RSL 0 to 5 years. |
90 | Hwy 13 | Medium mill and overlay from I-35W to Yankee Doodle Rd | $6,900,000 | Not selected | RQI does not match on the ground conditions |
90 | Hwy 95 | Resurface road from US 8 to Hwy 36 | $28,000,000 | 2029 | Projected poor pavement conditions. |
View more detailed scores (Excel).
Last updated October 2021
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Medium mill and overlay from I-35W to Yankee Doodle Rd | $6,900,000 | Not selected | RQI does not match on the ground conditions |
87 | Hwy 95 | Reclaim and overlay from Chisago/Isanti County line to Sunrise River | $20,000,000 | 2028 | Poor pavement conditions. 2020 RSL 0 to 5 years. |
85 | Hwy 5 | Medium mill and overlay from Hwy 41 to US212 | $6,900,000 | Not selected | Program limited by available funding. Much of this is older PCC with ride impacted by isolated crack slabs, some of which are from subsurface utility issues. A minor CPR is planned using PM or BARC funds in 2022 or 2023. |
81 | Hwy 97 | Thin mill and overlay from US61 roundabout to Hwy 95 | $11,400,000 | 2028 | Poor pavement conditions. Project has been deferred several times. SP 8212-035. |
81 | US61 | Thin mill and overlay from Goodhue/Dakota County Line to Hwy 316 | $9,000,000 | 2027 | Projected poor pavement conditions. SP 1916-028. |
81 | Hwy 5 | Medium mill and overlay from Hennepin/Ramsey County Line to Munster Ave | $600,000 | Not selected | Program limited by available funding. Short section of PCC before and after river bridge. Bridge ride is pulling average RQI down. |
80 | UN52 | Medium mill and overlay from Hwy 65 to University Ave | $1,600,000 | Not selected | Program limited by available funding. |
79 | Hwy 51 | Thin mill and overlay from Hwy 36 to Grey Fox Rd | $8,200,000 | 2026 | Poor pavement conditions. ADA, bike/ped, and drainage needs. SP 6216-142. |
78 | Hwy 13 | Medium mill and overlay from Scott County Road 42 to Connelly Pkwy | $700,000 | Not selected | RQI does not match on the ground conditions |
78 | Hwy 3 | Medium mill and overlay from Hwy 50 to Dakota County Road 58 | $3,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life is predicted 9 to 15 years. |
78 | US10 | Medium mill and overlay from US61 to .1 miles east of US61 | $100,000 | Not selected | Program limited by available funding. Short piece of 4 lane east of USTH 61. Recently received a UTBWC surface treatment. |
77 | Hwy 3 | Thin mill and overlay from Rice/Dakota County line to Hwy 50 | $8,700,000 | 2028 | Poor pavement conditions. SP 1920-047. |
77 | Hwy 20 | Thin mill and overlay from Hwy 19 to Hwy 50 | $6,700,000 | 2028 | Poor pavement conditions. 2020 RSL 2 to 10 years. |
77 | Hwy 21 | Medium mill and overlay from Hwy 19 to Scott County Road 37 | $300,000 | Not selected | Program limited by available funding. Short urban section. |
76 | Hwy 50 | Medium mill and overlay from US52 to US61 | $5,500,000 | 2026 | Poor pavement conditions. SP 1923-048. |
76 | Hwy 3 | Medium mill and overlay from Amana Trail to Hwy 62/Robert St | $13,200,000 | 2031 | NA |
76 | Hwy 21 | Medium mill and overlay from Sawmill Rd to Mill St | $300,000 | Not selected | RQI does not match on the ground conditions |
75 | Hwy 41 | Medium mill and overlay from Hundertmark to Pioneer Trail | $300,000 | Not selected | RQI does not match on the ground conditions |
75 | Hwy 3 | Medium mill and overlay from 145th St to Hwy 149 | $6,800,000 | 2031 | NA |
74 | Hwy 51 | Medium mill and overlay from Grey Fox Rd to I694 | $300,000 | Not selected | Recently repaired in 2021. |
73 | Hwy 13 | Medium mill and overlay legs to and from Scott County Road 21 roundabout | $300,000 | Not selected | Very new pavement either side of new roundabout. |
73 | Hwy 3 | Medium mill and overlay from Bridge 19045 to Mendota Rd | $500,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 96 | Medium mill and overlay from US61 to Hwy 95 | $14,800,000 | 2030 | Projected poor pavement conditions. |
73 | US10 | Medium mill and overlay from I-35W to I694 | $3,000,000 | Not selected | RQI does not match on the ground conditions |
73 | Hwy 21 | Medium mill and overlay from 7th St to Sawmill Rd | $4,300,000 | Not selected | RQI does not match on the ground conditions |
72 | US61 | Medium mill and overlay from Hwy 96 to White Bear Lake CL | $1,000,000 | Not selected | RQI does not match on the ground conditions |
72 | Hwy 95 | Medium mill and overlay from Point Rd to I-94 | $2,800,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 13 | Medium mill and overlay from Yankee Doodle Rd to I494 | $900,000 | Not selected | RQI does not match on the ground conditions |
71 | Hwy 3 | Medium mill and overlay from Hwy 149 to Bridge 19045 | $1,300,000 | Not selected | Program limited by available funding. 2020 Remaining service life 0 to 7 years. Short PCC section driving down Remaining service life. |
71 | Hwy 25 | Medium mill and overlay from Scott County line to Hwy 5 | $7,100,000 | Not selected | RQI does not match on the ground conditions |
70 | Hwy 101 | Medium mill and overlay from Hwy 5 to Town Line Rd | $1,400,000 | 2024 | Poor pavement conditions. SP 2736-046. |
69 | US61 | Medium mill and overlay from Frenchman Rd to Trailer Pk entrance | $400,000 | Not selected | Program limited by available funding. |
69 | Hwy 5 | Medium mill and overlay from Birch St to Scandia Rd | $1,100,000 | Not selected | Program limited by available funding. |
69 | Hwy 62 | Medium mill and overlay from I-35E to US52 | $3,500,000 | Not selected | Program limited by available funding. |
69 | Hwy 149 | Medium mill and overlay from Hwy 3 to Albano Tr | $200,000 | Not selected | Program limited by available funding. |
68 | Hwy 13 | Medium mill and overlay from Hwy 282 to Scott County Road 21 roundabout | $2,000,000 | Not selected | Program limited by available funding. |
68 | Hwy 13 | Medium mill and overlay from Hwy 55 to Hwy 13 | $2,600,000 | Not selected | Program limited by available funding. |
68 | US61 | Medium mill and overlay from White Bear Lake Cr to Frenchman Rd | $1,800,000 | Not selected | Program limited by available funding. |
68 | US61 | Medium mill and overlay from 250th St to Chisago County Road 31/32 | $700,000 | Not selected | Program limited by available funding. |
68 | Hwy 95 | Medium mill and overlay from Mulberry to St Saint Croix Trail | $500,000 | Not selected | Program limited by available funding. |
67 | US61 | Medium mill and overlay from I-94/Mounds Blvd to Hwy 5/7th St | $700,000 | Not selected | Program limited by available funding. |
67 | US61 | Medium mill and overlay from Chisago County Road 31/22 to 267th St | $200,000 | Not selected | Program limited by available funding. |
66 | Hwy 95 | Medium mill and overlay from St Croix Trail to Point Rd | $1,000,000 | Not selected | Program limited by available funding. |
65 | Hwy 5 | Medium mill and overlay from .2 miles W of Carver County Road 10 to .2 miles east of Carver County Road 10 | $200,000 | Not selected | Program limited by available funding. |
65 | US10 | Medium mill and overlay from US 61 to St Croix River bridge | $3,800,000 | 2031 | Projected poor pavement conditions. 2020 RSL 10 years. |
64 | Hwy 13 | Cold in place recycling and medium overlay from Hwy 19 to Hwy 282 | $7,000,000 | 2022 | Poor pavement conditions. SP 7001-123. |
64 | US61 | Medium mill and overlay from 170th St to Hwy 97 | $1,900,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Sunrise River to Taylors Falls | $6,600,000 | Not selected | Program limited by available funding. |
64 | Hwy 95 | Medium mill and overlay from Bailey Rd to US61 | $4,100,000 | Not selected | Program limited by available funding. |
64 | Hwy 149 | Medium mill and overlay from Albano Tr to Hwy 55 | $2,600,000 | Not selected | Program limited by available funding. |
63 | US61 | Medium mill and overlay from Trailer Pk entrance to 170th St | $1,000,000 | Not selected | Program limited by available funding. |
62 | Hwy 41 | Medium mill and overlay from Hwy 5 to Hwy 7 | $1,100,000 | Not selected | Program limited by available funding. |
62 | Hwy 41 | Medium mill and overlay from Pioneer Trail to Hwy 5 | $1,500,000 | 2023 | Poor pavement conditions. SP 1008-096. |
62 | Hwy 95 | Medium mill and overlay from I-94 to Valley Creek | $700,000 | Not selected | Program limited by available funding. |
62 | Hwy 243 | Medium mill and overlay from Hwy 95 to St Croix River | $700,000 | Not selected | Program limited by available funding. |
61 | Hwy 47 | Medium mill and overlay from US 10 to Industry Ave | $700,000 | Not selected | Program limited by available funding. |
61 | Hwy 95 | Medium mill and overlay from Valley Creek to Bailey Rd | $1,200,000 | Not selected | Program limited by available funding. |
59 | Hwy 5 | Medium mill and overlay from Hwy 25 to Carver County Road 10 | $1,900,000 | Not selected | Program limited by available funding. |
58 | Hwy 149 | Medium mill and overlay from Mendota Heights Rd to Hwy 5/7th St | $2,500,000 | Not selected | Program limited by available funding. |
57 | Hwy 50 | Medium mill and overlay from Hwy 3 to US52 | $4,300,000 | Not selected | Program limited by available funding. |
57 | US61 | Medium mill and overlay from RP163 to 250TH St | $200,000 | Not selected | Program limited by available funding. |
57 | Hwy 149 | Medium mill and overlay from I-494 to Mendota Heights Rd | $600,000 | Not selected | Program limited by available funding. |
55 | Hwy 5 | Medium mill and overlay from Carver County Road 10 to Oak Ave | $200,000 | Not selected | Program limited by available funding. |
50 | Hwy 5 | Thin mill and overlay from Carver County Road 11 to Hwy 41 | $6,900,000 | 2029 | Projected poor pavement conditions. |
47 | Hwy 95 | Thin mill and overlay from I-94 to Mulberry St | $18,000,000 | 2029 | Projected poor pavement conditions. 2020 RSL is 4 to 6 years. |
44 | Hwy 95 | Medium mill and overlay from I-94 to .5 miles S of I-94 | $500,000 | Not selected | Program limited by available funding. |
40 | Hwy 95 | Reclaim and overlay from US8 to Hwy 97 | $20,700,000 | 2029 | Projected poor pavement conditions. |
39 | Hwy 97 | Minor rehabilitation within roundabout at US61 | $100,000 | Not selected | Newer concrete roundabouts. |
39 | Hwy 25 | Thin mill and overlay from US212 to Hwy 5 | $4,100,000 | 2031 | Projected poor pavement conditions. 2020 RSL 11 years. |
36 | Hwy 13 | Reclaim and overlay from Scott County Road 21 Roundabout to Scott County Road 42 | $5,200,000 | 2030 | Projected poor pavement conditions. |
35 | Hwy 97 | Reconstruction from I-35W to US61 | $9,700,000 | 2024 | Geometrics. Poor pavement conditions. Ped/bike trail needs. SP 8201-021. |
33 | Hwy 47 | Thin mill and overlay from Industry Ave to 153rd Ave | $2,100,000 | 2027 | Projected poor pavement conditions. Project has previously been deferred. 2020 RSL 5 years. |
33 | Hwy 47 | Reclaim and overlay from 153Rd ave to Cree St | $20,700,000 | 2029 | Projected poor pavement conditions. |
32 | US61 | Medium mill and overlay from RP155 to 170th ST | $200,000 | Not selected | Program limited by available funding. |
30 | Hwy 47 | Medium mill and overlay from US10 to .4 miles NW of US10 | $300,000 | Not selected | Program limited by available funding. |
29 | US61 | Medium mill and overlay from 267th St to I35 | $300,000 | Not selected | Program limited by available funding. |
27 | Hwy 13 | Medium mill and overlay from Hwy 13 to Hwy 149 | $200,000 | Not selected | Program limited by available funding. |
27 | Hwy 13 | Medium mill and overlay from Connelly Pkwy to old Hwy 101 | $2,000,000 | Not selected | Program limited by available funding. |
19 | Hwy 47 | Thin mill and overlay from Cree St to Pederson Dr | $2,400,000 | 2025 | Safety. Poor pavement conditions. SP 0206-067. |
15 | Hwy 56 | Thin mill and overlay from Goodhue/Dakota County Line to Hwy 50 | $5,000,000 | 2031 | Projected poor pavement conditions. 2020 RSL 4 to 11 years. 1911-026 |
View more detailed scores (Excel).
Last updated December 2020
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
90 | Hwy 13 | Medium mill and overlay from I-35W to Yankee Doodle Road | $6,370,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
83 | Hwy 5 | Medium mill and overlay from Carver County Road 17 to Hennepin County Road 4 | $3,260,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
83 | Hwy 97 | Thin mill and overlay from Roundabout to Hwy 95 | $11,450,000 | 2028 | |
82 | Hwy 19 | Medium mill and overlay from Red Wing Ave to LeSueur/Scott County Line | $220,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
81 | Hwy 5 | Medium mill and overlay from Fuller Rd to Wooddale Ave | $710,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
81 | Hwy 5 | Medium mill and overlay from County Road 4 to Fuller Rd | $580,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
80 | US 10 | Medium mill and overlay from .2 miles north of I-694 to I-694 | $470,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
79 | Hwy 62 | Medium mill and overlay from I-35E to Hwy 52 | $3,420,000 | Not Selected | Recent rehabilitation completed |
79 | Hwy 13 | Medium mill and overlay from Senneca Rd to Yankee Doodle Rd | $620,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
78 | Hwy 25 | Medium mill and overlay from White sty to State St | $60,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
77 | Hwy 13 | Medium mill and overlay from County Road 42 to Connelly Pkwy | $790,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
77 | US 61 | Medium mill and overlay from Roselawn Ave to Hwy 36 | $1,090,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
77 | US 61 | Medium mill and overlay from I-694 to White Bear Ave | $2,480,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
77 | Hwy 19 | Thin mill and overlay from LeSueur/Scott County Line to Scott/Rice County Line | $3,330,000 | 2027 | |
77 | Hwy 282 | Major rehabilitation from Hwy 21 to Hwy 13 | $1,170,000 | 2021 | NA |
76 | Hwy 5 | Major rehabilitation from Sibley/Carver County line to 142nd St | $460,000 | 2021 | NA |
75 | Hwy 47 | Medium mill and overlay from 27th Ave to 35th Ave | $1,080,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
75 | Hwy 120 | Medium mill and overlay from Ridge Dr to 4th St in Oakdale | $1,410,000 | 2026 | |
75 | US 10 | Thin mill and overlay from Hwy 61 to Saint Croix River bridge | $460,000 | 2027 | Poor ride quality requires resurfacing. |
75 | Hwy 149 | Major rehabilitation from Hwy 55 to I-494 | $320,000 | 2028 | NA |
74 | Hwy 3 | Reconstruction from Amana trail to south of Upper 55th Ave | $6,110,000 | 2029 | |
74 | Hwy 97 | Medium mill and overlay from east of Everton Ave to Hwy 61 Roundabout | $30,000 | 2024 | NA |
74 | Hwy 41 | Medium mill and overlay from Engler Rd to Pioneer Tr | $520,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
73 | Hwy 47 | Reclaim and overlay from 153rd Ave to Cree St | $15,560,000 | 2027 | NA |
73 | Hwy 95 | Reclaim and overlay from Chisago County road 14 to Sunrise river | $10,630,000 | 2028 | |
73 | Hwy 95 | Reconstruction from Oakview Ave to Chisago County Rd 14 | $6,900,000 | 2028 | |
73 | Hwy 97 | Medium mill and overlay from US61 Roundabout to end of US61 Roundabout | $40,000 | 2024 | NA |
72 | US 61 | Medium mill and overlay from Hwy 36 to I-694 | $1,690,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
72 | Hwy 95 | Medium mill and overlay from Bailey Rd to 70th St | $730,000 | Not Selected | Recent rehabilitation completed |
71 | Hwy 3 | Medium mill and overlay from 190th to Dakota County Road 58 | $610,000 | Not Selected | Newer roundabout completed |
71 | Hwy 13 | Medium mill and overlay from .4 miles west of Dakota Ave to .2 miles east of Dakota Ave | $600,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
71 | Hwy 13 | Medium mil and overlay from Yankee Doodle Rd to I-494 | $380,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
71 | US 61 | Medium mill and overlay from Hwy 96 to .8 miles north | $400,000 | Not Selected | Recent rehabilitation completed |
71 | Hwy 252 | Major rehabilitation from 85th to Hwy 610 | $440,000 | 2025 | Corridors of commerce |
70 | Hwy 101 | Medium mill and overlay from Carver County Road 61 to Carver County Road 14 | $280,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
70 | Hwy 3 | Medium mill and overlay from Upper 55th St to Robert St | $790,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
70 | Hwy 3 | Medium mill and overlay from Railroad crossing to Chesterfield. | $260,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
70 | Hwy 25 | Medium mill and overlay from Scott County line to Sibley County Road 14 | $500,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
70 | Hwy 25 | Medium mill and overlay from Sibley County Road 14 to Hwy 5 | $3,020,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
70 | Hwy 95 | Medium mill and overlay from Hwy 36 to north of 56th St N | $940,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
69 | Hwy 5 | Medium mill and overlay from Birch St to Scandia Rd | $930,000 | Not Selected | Not district priority. Will continue to monitor pavement performance |
69 | Hwy 47 | Major rehabilitation from Central Ave to Broadway St | $730,000 | 2024 | NA |
69 | Hwy 13 | Major reconstruction from I-494 to Hwy 55 | $5,250,000 | 2026 | |
69 | Hwy 50 | Medium mill and overlay from Hwy 52 to Hwy 60 | $5,630,000 | 2026 | |
69 | US 61 | Medium mill and overlay from Hwy 97 to north of Washington County Road 2 | $7,600,000 | 2030 | RQI is predicted to fall into the poor category before 2030. |
69 | US 61 | Medium mill and overlay from Frenchman Rd to Trailer Park Entrance | $180,000 | Not Selected | |
69 | US 61 | Medium mill and overlay from Forest Lake Circle to south of 250th St N | $310,000 | Not Selected | |
69 | Hwy 284 | Reclaim and overlay from Hwy 212 to Elm Creek Rd | $5,760,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 21 | Medium mill and overlay from south of Old Hwy 169 to Mill St | $120,000 | 2027 | |
68 | Hwy 21 | Medium mill and overlay from 230th St to Meadow Wood Court | $570,000 | Not Selected | |
67 | US 61 | Medium mill and overlay from 250th St N | $330,000 | Not Selected | |
67 | US 61 | Medium mill and overlay from Chisago County Road 31/32 to 267th St in Wyoming | $70,000 | Not Selected | |
67 | Hwy 19 | Medium mill and overlay from Scott County Road 143 to 11th ave SW | $90,000 | Not Selected | |
67 | Hwy 95 | Medium mill and overlay from north of Commercial Ave to Hwy 36 | $440,000 | Not Selected | |
66 | Hwy 97 | Medium mill and overlay from I-35W to Hwy 61 | $500,000 | 2024 | |
65 | Hwy 47 | Medium mill and overlay from Broadway St to 27th Ave NE | $1,270,000 | Not Selected | |
65 | Hwy 3 | Medium mill and overlay from 145th St to Hwy 149 | $5,760,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
65 | Hwy 13 | Medium mill and overlay from I-35E to Hwy 13 | $480,000 | Not Selected | |
65 | Hwy 95 | Medium mill and overlay from .25 miles South of Valley Creek to .25 miles north of Valley Creek | $100,000 | Not Selected | |
65 | Hwy 149 | Medium mill and overlay from Hwy 3 to Albano Tr | $100,000 | Not Selected | |
64 | Hwy 13 | Medium mill and overlay from 2nd St to U-35E | $360,000 | Not Selected | |
63 | Hwy 5 | Medium mill and overlay from .2 miles east of Carver County Road1 0 to .2 miles west of Carver County Road 10 | $90,000 | Not Selected | |
63 | Hwy 121 | Medium mill and overlay from Pedestrian Bridge to 58th St | $1,230,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
63 | Hwy 95 | Medium mill and overlay from Vista Road to Chisago County Road 16 | $180,000 | Not Selected | |
63 | Hwy 96 | Medium mill and overlay from Hwy 61 to Hwy 95 | $15,350,000 | 2030 | RQI currently in the poor to fair range. |
62 | Hwy 19 | Medium mill and overlay from 11th Ave SW to 5th Ave SW | $90,000 | Not Selected | |
62 | Hwy 95 | Medium mill and overlay from .7 miles north of I-94 to I-94 | $360,000 | Not Selected | |
62 | Hwy 95 | Medium mill and overlay from I-94 to Valley Creek | $300,000 | Not Selected | |
62 | Hwy 41 | Medium mill and overlay from Pioneer Tr to Hwy 5 | $440,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
62 | Hwy 41 | Medium mill and overlay from Hwy 5 to Hwy 7 | $530,000 | Not Selected | |
61 | Hwy 5 | Medium mill and overlay from Hwy 25 to .1 miles north | $20,000 | Not Selected | |
61 | Hwy 25 | Medium mill and overlay from Hwy 5 to Hwy 7 | $1,320,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
60 | Hwy 13 | Reclaim and overlay form Eagle Creek to Scott County Road 42 | $5,360,000 | 2030 | RQI currently in the poor to fair range. |
60 | Hwy 95 | Reclaim and overlay from Hwy 8 to Hwy 97 | $19,580,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
59 | Hwy 25 | Thin mill and overlay from Hwy 212 to Hwy 5 | $2,820,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
59 | US 61 | Major rehabilitation from 267th St to I35 | $80,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
58 | Hwy 3 | Medium mill and overlay from Ann Marie Tr to Amana Tr | $50,000 | Not Selected | |
57 | Hwy 25 | Medium mill and overlay from .2 miles south of Hwy 7 to Hwy 7 | $50,000 | Not Selected | |
56 | Hwy 95 | Medium mill and overlay from Chestnut St to north of Commercial Ave | $210,000 | Not Selected | |
55 | Hwy 101 | Medium mill and overlay from Hwy 5 to Town Line Rd | $2,180,000 | 2026 | Selected prior to policy (in 2019-2028 CHIP) |
55 | Hwy 3 | Medium mill and overlay from Ann Marie Trail to Amana Trail | $170,000 | Not Selected | |
54 | Hwy 13 | Medium mill and overlay from Hwy 55 to 2nd St | $460,000 | Not Selected | |
50 | Hwy 5 | Thin mill and overlay from Carver County Road 11 to Hwy 41 | $4,900,000 | 2029 | Selected prior to policy (in 2019-2028 CHIP) |
48 | Hwy 51 | Thin mill and overlay from Hwy 36 to Grey Fox Rd | $5,760,000 | 2026 | Longitudinal joint distresses need fixing; not necessarily associated with poor ride. Other area needs included. |
46 | Hwy 20 | Thin mill and overlay from Hwy 19 to Hwy 50 | $6,620,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
44 | Hwy 62 | Thin mill and overlay from Mendota to I35E | $1,250,000 | 2025 | Predicted RQI does not match on the ground conditions. Poor condition requires resurfacing. |
43 | Hwy 25 | Medium mill and overlay from Hwy 7 to White St | $1,120,000 | Not Selected | NA |
42 | Hwy 3 | Thin mill and overlay from Rice/Dakota County line to Hwy 50 | $8,740,000 | 2028 | Thin mill and overlay selected for preventive maintenance. |
41 | US 10 | Medium mill and overlay from I35W to north of I494/694 | $970,000 | Not Selected | |
41 | Hwy 95 | Thin mill and overlay from Isanti trail to west of Falcon Ave | $1,520,000 | 2028 | Poor ride requires resurfacing. Coordinating with locals. |
40 | Hwy 56 | Thin mill and overlay from Goodhue/Dakota County line to Hwy 50 | $4,390,000 | 2027 | Thin mill and overlay selected for preventive maintenance. |
38 | Hwy 95 | Medium mill and overlay from old County Road 15 to south of Hudson Rd D | $440,000 | Not Selected | |
37 | Hwy 95 | Medium mill and overlay from .7 miles north of I-94 to I-94 | $350,000 | Not Selected | |
34 | Hwy 5 | Major rehabilitation from 142nd St to Hwy 212 | $140,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
34 | Hwy 47 | Thin mill and overlay from 40th Ave to Hwy 10 | $15,790,000 | 2030 | RQI predictions do not match conditions on the ground. Requires resurfacing. Other area and local needs included. |
34 | Hwy 13 | Medium mill and overlay from Hwy 19 to 1.5 miles north of Hwy 19 | $1,530,000 | Not Selected | |
32 | US 61 | Medium mill and overlay from south of 170th st to .1 miles north of 170th | $60,000 | Not Selected | Recent roundabout completed |
30 | Hwy 101 | Medium mill and overlay from Carver County Road 14 to Kiowa Tr | $1,070,000 | Not Selected | NA |
29 | Hwy 101 | Medium mill and overlay from Kiowa Tr to Lyman Blvd | $170,000 | Not Selected | NA |
28 | Hwy 95 | Reclaim and overlay from Isanti/Chisago County line to north of 392nd st | $1,380,000 | 2028 | Poor ride quality requires resurfacing. Coordinating with locals. |
26 | Hwy 95 | Medium mill and overlay from Valley Crk to Jct Bailey | $480,000 | Not Selected | |
26 | Hwy 95 | Medium mill and overlay from 70th St to Hwy 61 | $1,250,000 | Not Selected | |
19 | Hwy 55 | Thin mill and overlay from Hwy 100 to Lyndale Ave | $2,020,000 | Not Selected | RQI predictions do not match conditions on the ground. Requires resurfacing. Other functional and local needs included. |
19 | Hwy 47 | Thin mill and overlay from Cree St to Anoka/Isanti County line | $3,320,000 | 2025 | Pavement is rough but surface work is secondary. Project driven by safety. |
13 | Hwy 95 | Thin mill and overlay from Hwy 97 to north of Commercial Ave | $17,710,000 | 2029 | RQI prediction does not match conditions on the ground. Poor ride requires resurfacing. |
9 | Hwy 47 | Thin mill and overlay from Industry ave to 153rd | $2,130,000 | 2027 | Thin mill and overlay selected for preventive maintenance. |
4 | Hwy 244 | Thin mill and overlay from Ash St to Hwy 96 | $1,050,000 | 2025 | Notoriously poor riding urban section. Requires resurfacing. Other functional area and local needs included. |
View more detailed scores (Excel).
Last updated December 2019
Score | Route | Description | High level construction cost estimate for planning purposes | Year Planned (FY) | Comments |
---|---|---|---|---|---|
95 | Hwy 5 | Concrete rehabilitation from Highway 41 to Highway 212 | $10,600,000 | 2027 | |
95 | Hwy 13 | Medium mill and overlay from I-35W to I-494 | $7,100,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
91 | Hwy 95 | Reclaim and overlay from Isanti/Chisago County Line to Sunrise River | $6,600,000 | 2026 | |
90 | Hwy 95 | Reclaim and overlay from Highway 8 to north end of stone wall | $19,500,000 | 2028 | |
87 | Hwy 95 | Reclaim and overlay from I-94 to Bailey Rd | $2,500,000 | 2021 | NA |
86 | US61 | Medium mill and overlay from Roselawn Ave to White Bear Ave | $5,500,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
84 | Hwy 47 | Reclaim and overlay from Industry Ave NW to Anoka/Isanti County Line | $10,200,000 | 2025 | |
82 | Hwy 97 | Reconstruction from Hornsby Ave to roundabout | $5,800,000 | 2024 | |
81 | Hwy 97 | Thin mill and overlay from end of roundabout to Highway 95 | $3,200,000 | 2026 | |
81 | US61 | Medium mill and overlay from Highway 96 to 170th St | $1,300,000 | Not Selected | Not a current district priority, but will continue to monitor pavement performance |
79 | Hwy 13 | Medium mill and overlay from Scott/Rice County Line to Highway 282 | $4,700,000 | 2022 | NA |
79 | US61 | Thin mill and overlay from Highway 316 to Highway 316 in Hastings | $3,600,000 | 2026 | NA |
79 | Hwy 96 | Medium mill and overlay from Highway 61 to Highway 95 | $5,300,000 | 2029 | NA |
77 | Hwy 3 | Thin mill and overlay from Rice/Dakota County Line to Highway 50 | $3,400,000 | 2026 | NA |
77 | Hwy 120 | Medium mill and overlay from Ridge Drive to 4th St | $600,000 | 2026 | NA |
77 | US952A | Medium overlay from 2nd Ave N to I-94 | $2,900,000 | Not Selected | Waiting to coordinate with bridge work |
76 | Hwy 5 | Meduim mill and overlay from Sibley Carver County Line to Highway 212 | $1,400,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
76 | Hwy 101 | Medium mill and overlay from Highway 5 to Town Line Rd | $1,700,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
76 | Hwy 95 | Medium mill and overlay from end of stone wall to Point Rd | $700,000 | Not Selected | NA |
75 | Hwy 41 | Thin mill and overlay from Pioneer Trail to Highway 5 | $900,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
74 | Hwy 284 | Reclaim and overlay from Cologne to Elm Creek Rd | $5,700,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
74 | Hwy 13 | Medium mill and overlay from I-35E to Highway 13 | $1,000,000 | Not Selected | NA |
73 | US61 | Medium mill and overlay from Highway 316 to west of Higway 316 | $400,000 | Not Selected | NA |
72 | Hwy 95 | Medium mill and overlay from Point Rd to I-94 | $1,800,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
72 | Hwy 47 | Medium mill and overlay from Central Ave to 27th Ave | $1,300,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
72 | Hwy 121 | Medium mill and overlay from pedestrian wall to 58th St | $300,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
72 | Hwy 3 | Reconstruction from reference point 143 to Robert St/Old Highway 110 | $10,000,000 | 2029 | Selected to in order to start early project development work in a complicated area |
72 | Hwy 41 | Thin mill and overlay from Highway 5 to Highway 7 | $1,100,000 | Not Selected | NA |
71 | Hwy 95 | Reconstruction from Bailey Rd to Highway 61 | $6,000,000 | Not Selected | NA |
70 | Hwy 50 | Medium mill and overlay from Highway 52 to Highway 61 | $2,900,000 | 2023 | Selected prior to policy (in 2019-2022 STIP) |
70 | Hwy 13 | Major concrete rehabilitation from I-494 to westbound Highway 55 | $2,000,000 | 2024 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 3 | Medium mill and overlay from 145th St to Highway 149/Dodd Rd | $4,700,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
69 | Hwy 13 | Medium mill and overlay from 2nd St to I-35E | $800,000 | Not Selected | NA |
65 | Hwy 3 | Medium mill and overlay from reference point 40 to reference point 143 | $500,000 | Not Selected | NA |
64 | Hwy 282 | Reclaim and overlay from Highway 21 to Highway 13 | $3,800,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
60 | Hwy 25 | Medium mill and overlay from Highway 5 to roundabout at Highway 7 | $2,800,000 | 2021 | Selected prior to policy (in 2019-2022 STIP) |
59 | Hwy 51 | Thin mill and overlay from Highway 36 to Frey Fox Rd | $2,000,000 | 2025 | Selected prior to policy (in 2019-2028 CHIP) |
59 | Hwy 25 | Thin mill and overlay from Highway 212 to Highway 5 | $900,000 | 2027 | Selected prior to policy (in 2019-2028 CHIP) |
58 | US61 | Medium mill and overlay from Forest Lake city limits to I-35 | $1,600,000 | 2020 | Selected prior to policy (in 2019-2022 STIP) |
57 | Hwy 13 | Medium mill and overlay from Highway 55 to 2nd St | $1,000,000 | Not Selected | NA |
52 | Hwy 62 | Thin mill and overlay from I-35E to I-494 | $1,300,000 | Not Selected | NA |
51 | US10 | Thin mill and overlay from I-35W to Highway 10/I-694 | $500,000 | Not Selected | NA |
47 | Hwy 19 | Thin mill and overlay from Le Sueur/Scott County Line to Scott/Rise County Line | $1,300,000 | 2028 | Limited funding for bigger fix, which scores higher |
46 | US61 | Medium mill and overlay from Highway 97 to Forest Lake city limits | $1,500,000 | 2029 | Limited funding for bigger fix, which scores higher |
43 | Hwy 13 | Reclaim and overlay from Eagle Creek interchange to Dakota County Road 42 | $2,100,000 | 2028 | Selected prior to policy (in 2019-2028 CHIP) |
42 | US10 | Thin mill and overlay from Highway 61 to West end of Saint Croix bridge | $1,100,000 | Not Selected | NA |
40 | Hwy 56 | Thin mill and overlay from Goodhue/Dakota County line to Highway 50 | $2,000,000 | 2027 | Limited funding for bigger fix, which scores higher |
37 | Hwy 25 | Medium mill and overlay from Highway 7 roundabout to State St/Highway 25 | $2,500,000 | Not Selected | NA |
36 | Hwy 5 | Thin mill and overlay from Birch St to Scandia Rd | $700,000 | Not Selected | NA |
34 | Hwy 25 | Thin mill and overlay from Scott County Line to Sibley County Road 14 | $700,000 | Not Selected | NA |
32 | Hwy 47 | Thin mill and overlay from 40th Ave to Highway 10 | $4,900,000 | 2029 | Score is lower because of urban pavement section included in the project |
24 | Hwy 5 | Thin mill and overlay from Carver County Road 11 to Highway 41 | $1,500,000 | 2028 | Score is lower because of urban pavement section included in the project |
21 | Hwy 20 | Thin mill and overlay from Highway 19 to Highway 50/240th St | $2,500,000 | 2028 | Limited funding for bigger fix, which scores higher |
21 | Hwy 3 | Thin mill and overlay from Highway 50 to 190th | $1,000,000 | Not Selected | NA |
20 | Hwy 51 | Thin mill and overlay from Grey Fox Rd to I-694 | $300,000 | Not Selected | NA |
17 | Hwy 97 | Roundabout at Highway 61 and Highway 97 | $100,000 | Not Selected | NA |
14 | US61 | Roundabout at Highway 61 and Highway 98 | $200,000 | Not Selected | NA |
3 | Hwy 5 | Thin mill and overlay from Highway 25 to Carver County Road 10 | $200,000 | Not Selected | NA |