Minnesota Department of Transportation

511 Travel Info

Highway 14/Highland Avenue

New Ulm

About this project

Highway 14/Highland Avenue Study area map
Highway 14/Highland Avenue roundabout. Click for larger view.

MnDOT conducted a study of the Hwy 14 and Highland Ave. intersection in New Ulm to analyze safety and traffic flow issues. With input from the city of New Ulm, local residents and businesses, the school district, and other project stakeholders, MnDOT evaluated the intersection, developed design alternatives, and arrived at a single lane roundabout design.

Intersection study: final report (PDF)
Final layout: single lane roundabout (PDF)

Summary of work

  • Construct a single-lane roundabout at the intersection of Hwy 14 and Highland Ave.
  • Construct new sidewalk and trail to connect to existing locations
  • Add lighting at the intersection

Traffic impacts

Traffic will be detoured during construction in 2024

Highway 14/Highland Avenue Study area map
Highway 14/Highland Avenue detour map. Click for larger view.