About this project
View full-size map
The purpose of this project is to reconstruct Hwy 62 between 28th Ave. South and 46th Ave. South in Minneapolis, as the existing pavement has reached the end of its service life. We will also resurface the Hwy 62 bridge over 28th Ave. South to extend the service life of the structure. This work is necessary to maintain the highway system.
Summary of work
- Reconstruct Hwy 62 and ramps between 28th Ave. South and 46th Ave. South in Minneapolis
- Resurface the Hwy 62 bridge over 28th Ave. South
- Replace the center median barrier
- Replace signs, including overhead signs
- Remove the pedestrian overpass at 40th Ave. South
- Widen the sidewalk on the 43rd Ave. South overpass
- Replace the storm sewer system and add water treatment ponds
