This webpage is not updated over the weekend/overnight. For up-to-date information on traffic impacts, visit 511mn.org.
Traffic impacts
All traffic impacts are tentative and weather dependent.
Current
Lane closures
Through late October
- I-494 is reduced to two lanes in both directions between 24th Ave. and Pilot Knob Rd.
Ramp closures
10 p.m. Sun, April 28 through October
- The ramp from WB Hwy 5 to EB I-494 is closed
- The ramp from 34th Ave. to EB I-494 is closed
Upcoming
Information about upcoming traffic impacts will be posted as details become available. Motorists can expect weekend, nighttime and directional closures.
About this project
MnDOT is doing work on the I-494 bridge over the Minnesota River. This 43-year-old bridge is in need of major repairs to continue to safely transport people and goods between the cities of Bloomington, Eagan, and Mendota Heights. Once construction is completed, travelers using the bridge will enjoy a smoother safer road. The project will also extend the life of the bridge and improve drainage.
Summary of work
- Repair pavement on I-494
- Reconstruct the regional trail
- Replace bridge joints
- Repair bridge deck, beam ends and railings
- Reconstruct bearings
- Replace highway lighting
- Repair/replace drainage