Crews constructed a new noise wall on Hwy 169 between Bass Lake Rd. and 62nd Ave. N. in New Hope.

Summary of work

  • Constructed new approximately 2,800 feet long and 20 foot tall concrete post and wood plank noise barrier
  • Tree removal
  • Guard rail installation
  • Utility work

Schedule

  • Completed: June 2023 through spring 2024

Location

  • NB Hwy 169 between Bass Lake Rd. and 62nd Ave. N. in New Hope

Benefits

  • Reduce noise levels

Cost

  • $2.6 million

Hwy 169 in Edina

East side of Highway 169 standalone noise wall in Edina project area map

Hwy 169 standalone noise wall in Edina project area map.

View full-size map

Crews constructed a noise wall and made improvements to nearby utilities on Hwy 169.

Summary of work

  • Constructed new wood plank and concrete post noise barrier along the east side of Hwy 169 between approximately Valley View Rd. and Apache Rd.
  • Removed trees and vegetation
  • Installed guardrail and lighting
  • Replaced the ramp meters at the ramp from Valley View Rd. to NB Hwy 169

Schedule

  • Completed: Mid-August 2022 through June 2023

Location

  • Hwy 169 between Valley View Rd. and Bren Rd. in Edina

Benefits

  • Reduce noise levels
  • Improve traffic mobility and safety

Cost

  • $3.6 million

I-94 in St. Paul

Eastbound I-94 standalone noise wall in St. Paul project area map

I-94 standalone noise wall in St. Paul project area map.

View full-size map

Crews constructed a new noise wall between Fairview Ave. and Prior Ave. on eastbound I-94 in St. Paul.

Summary of work

  • Constructed new wood plank and concrete post noise barrier
  • Removed trees

Schedule

  • Completed: August 2021 through June 2022

Location

  • EB I-94 between Fairview Ave. and Prior Ave. in St. Paul

Benefits

  • Reduce noise levels

Cost

  • $950,000

I-35E in Eagan

I-35E standalone noise wall in Eagan project area map

I-35E standalone noise wall in Eagan project area map.

View full-size map

Previous noise levels exceeded state/federal noise standards. This area previously ranked 6th in the MnDOT Metro 2016 Noise Abatement Study. The city of Eagan provided a resolution of support for this project and committed to a 10% cost share. A public meeting and voting process was held in September 2017.

Summary of work

  • Constructed new 3,500 ft. long, 20 ft. tall concrete noise barrier
  • Removed trees
  • Installed guardrail

Schedule

  • Completed: November 2020 through July 2021

Location

  • NB I-35E between Hwy 77 and Cliff Rd. in Eagan

Benefits

  • Reduce noise levels

Cost

  • $3.5 million