Minnesota state highway projects

Construction projects, plans, and studies

Updated July 1, 2020

Search for a project


Browse by region

District Offices MnDOT District 7 - Mankato/Windom Metro District - St Paul/Minneapolis MnDOT District 8 - Marshall/Wilmar/Hutchinson MnDOT District 1 - Duluth/Virginia MnDOT District 4 - Detroit Lakes/Morris MnDOT District 2 - Bemidji/Crookston MnDOT District 3 - Baxter/St Cloud MnDOT District 6 - Rochester/Owatonna








Browse by stage








Browse by highway number



Hwys 1–9

Hwy 1 — Red Lake

Reconstruct between Hwy 89 and border with Red Lake Nation

  • Construction dates: May to late October 2020
  • Traffic impacts: Detour

Hwy 1 — Stony River Bridge

Replace bridge at Stony River, grade approaches near CR 2 west of Isabella in Lake County

  • Construction dates: May to November 2020
  • Traffic impacts: Lane closures

Hwy 1 — Thief River Falls resurfacing

Resurface Hwy 1 between Hwy 219 and Pennington CR 18

  • Construction dates: mid-August to early October 2020
  • Traffic impacts: Detour

Hwy 1 and Hwy 59 — Thief River Falls roundabouts

Construct three roundabouts, frontage road and multi-use trail between Hwy 59 and Kinney Avenue

  • Construction dates: June to late October 2020
  • Traffic impacts: Stage detours

Hwy 1 and Hwy 73 — Itasca and Saint Louis counties

Resurface Hwy 1 from Hwy 65 to Hwy 53 and on Hwy 73 from Hwy 1 to Hwy 53 and intersection improvement at County Road 115/Ashawa Road north junction Hwy 1 in Itasca and St. Louis counties

  • Construction dates: July to October 2020
  • Traffic impacts: Lane closures

Hwy 2 — Bagley

Resurface and pedestrian improvements, construct multi-use trail

  • Construction dates: June to August 2020
  • Traffic impacts: Lane closures

Hwy 2 — Bena to Ball Club

Resurface between Bena and Ball Club, construct multi-use trail near Bena

  • Construction dates: July to September 2020
  • Traffic impacts: Lane closures

Hwy 2 — Crookston

Resurface east of Crookston

  • Construction dates: June to July 2020
  • Traffic impacts: Lane shift, single lane traffic

Hwy 2 — Deer River

Urban reconstruct on Hwy 2 and 6 in Deer River

  • Construction dates: May to October 2020
  • Traffic impacts: Detour

Hwy 2 — Marcoux Corner

Resurface westbound lanes between Hwy 32 and Polk County Road 44

  • Construction dates: July to August 2020
  • Traffic impacts: Lane closures

Hwy 3 — Empire Township and Farmington

Adding roundabout at 170th Street and left turn lane construction

  • Construction dates: June 15 through fall 2020

Hwy 3/Robert Street — Saint Paul

Repair Robert Street Bridge over the Mississippi River.

  • Construction dates: Preventative maintenance begins summer 2020

Hwy 5 — Green Isle

Resurface from 5th St in Green Isle to Hwy 212

  • Construction dates: Construction July/August - October 2020
  • Traffic impacts: Detour

Hwy 5 — Mississippi River to Minneapolis-Saint Paul International Airport

Highway and ramp resurfacing on Hwy 5 from Mississippi River to 34th Ave.

  • Construction dates: Spring through fall 2020

Hwy 6 — Talmoon

Resurface between Talmoon and Itasca CR 136

  • Construction dates: July to September 2020
  • Traffic impacts: Detour

Hwy 7 — Minnetonka

Add a second left turn from Hwy 7 to Hopkins Crossroad and replace traffic signal.

  • Construction dates: May through September 2021

Hwy 7 — Victoria

Stabilize the highway and shoulders and install an improved drainage system with curb and gutters and new shoulders between Merrywood Ln. and Waterford Ln. on Hwy 7.

  • Construction dates: August through October 2020

Hwy 8 — Chisago County

Safety and Mobility Improvement study to identified potential needs on Hwy 8 between I-35 and Co. Rd. 80 in Chisago County.

  • Studying preliminary design

Hwy 8 — Wyoming and Chisago City

Study identified possible future improvements to the Hwy 8 Corridor between Greenway Ave. North and Karmel Ave.

  • Study completed; no projects have been funded or are currently planned

Hwy 9 — Barnesville to I- 94

Resurfacing, turn lanes, utility replacement, sidewalk improvements, trail, bicycle & ADA accessibility upgrades.

  • Scheduled for construction in 2023

Hwy 9 — New London

Addition of safety improvements for people who walk and bike

  • Scheduled for construction in 2022

Hwys 10–19

Hwy 10 — Anoka

Construct new interchange at Thurston Ave., build underpass at Fairoak Ave. and extend West Main St.; Remove all Hwy 10 access in project area.

  • Scheduled for construction in 2021-2022

Hwy 10 and Hwy 47 — Anoka and Coon Rapids

Resurface Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka Co. Rd 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and Co. Rd. 10 interchange and at the Hwy 10/610 and University Ave. (Co. Rd. 51) interchange.

  • Construction dates: Mid-September through October 2020
  • Traffic impacts: Lane and shoulder closures

Hwy 10 — Anoka and Ramsey

Corridor study identified needs

  • Study complete; no projects have been funded or planned

Hwy 10 — Anoka Rum River Bridge replacement

Replace Hwy 10 bridge over the Rum River; Additional funding being sought to reconstruct Ferry St. (Hwy 47/Hwy 169) interchange and build auxiliary lanes from Ferry St. to 7th Ave.

  • Scheduled for construction in 2022

Hwy 10 — Coon Rapids

Replace signal system, realign NB Round Lake Blvd. to EB Hwy 10 ramp, repair bridges and resurface approach roads.

  • Scheduled for construction in 2021

Hwy 10 — Detroit Lakes

Intersection improvements at Kris Street and signal installation at County Road 54

  • Construction dates: 2020 construction season

Hwy 10 — Elk River

Reconstruct and improve Highway 10 from Xenia Avenue to 4th Street NW in Elk River, includes pedestrian sidewalks/trails and signal system upgrades.

  • Scheduled for construction in 2021

Hwy 10 — Elk River project study

Upgrade to a freeway system

  • Study completed 2012; no projects have been funded or planned

Hwy 10 — Glyndon

Pavement repair on eastbound Hwy 10 in Glyndon

  • Construction dates: 2020 construction season

Hwy 10 and Hwy 75 — Downtown Moorhead

Reconstruct Hwy10 and Hwy 75 in downtown Moorhead

  • Construction dates: Summer 2025

Hwy 10 and Hwy 75 — Moorhead 11th Street underpass

Two grade separations of Highway 10/75 under the BNSF rail lines, paving, pedestrian accessibility improvements, utility replacements and signals.

  • Planning

Hwy 10 — Wadena

Reconstruct Hwy 10 from Birch Ave to east of CR 4 in the city of Wadena, includes sidewalks, accesses and utilities.

  • Construction dates: May 2019 - October 2020; work operations resume April 2020
  • Traffic impacts: Lane closures, flaggers, staged detours

Hwy 11 and Hwy 72 — Baudette/Rainy River International Bridge replacement

Replace bridge over the Rainy River

  • Construction dates: May 2018 to summer 2020
  • Traffic impacts: None (use old bridge until new bridge opens)

Hwy 12 — Chippewa River, Cottonwood Creek and County Ditch 3 bridge replacements

Replace the bridges at Chippewa River, Cottonwood Creek and County Ditch 3.

  • Construction scheduled for 2023

Hwy 12 — Cokato

Resurface from Sunset Avenue Northwest to Seventh  Street Southeast, update pedestrian sidewalks; reconstruct access and replace signal at Wright County Road 3; update accesses at Dassel-Cokato high school.

  • Construction dates: July through October 2020
  • Traffic impacts: Lane and sidewalk closures, flaggers, access detour at Wright County Road 3

Hwy 12 — Maple Plain to Delano

Installed flexible rubber safety poles in center of Hwy 12 and removed trees on state property.

  • Status: Completed

Hwy 12 — Montrose to Delano

Resurface from Zephyr Ave. in Montrose to north of Bridge Ave. in Delano

  • Construction dates: August through October 2020
  • Traffic impacts: Lane closures

Hwy 12 — Orono to Independence

Improve safety and reduce crashes along Hwy 12, install a center concrete barrier, and construct a roundabout

  • Scheduled for construction in 2021

Hwy 12 — Ortonville to Hwy 59

Reclamation, shoulder widening, snow trap improvements, and box culvert replacements.

  • Scheduled for construction in 2021

Hwy 12 and Hwy 22 — Litchfield

Reconstruction of four blocks of Hwy 12 and Hwy 22 through downtown Litchfield.

  • Construction dates: June 2019 through November 2020

Hwy 12 and Hwy 40 — Willmar Wye Rail Connector & Industrial Access Project

Realign Hwy 12 and reconstruct Hwy 40 to facilitate a railroad bypass on the west side of Willmar.

  • Construction dates: May 2019 through November 2020

Hwy 13 — Prior Lake

Reconstructing Hwy 13, constructing turn lanes, installing traffic signal and improving pedestrian crossings

  • Construction dates: May 2019 through 2020

Hwy 13 — Savage to Burnsville

Study of Hwy 13 between Hwy 169 in Savage and Nicollet Ave. in Burnsville.

  • Study in progress; scheduled for construction in 2022

Hwy 13 — Spring Lake and Cedar Lake

Resurface and reconstruct road between Hwy 19 in Cedar Lake Township to Hwy 282 in Spring Lake Township and add left turn lanes.

  • Scheduled for construction in 2022

Hwy 14 — Chester drainage repair

Replace two drainage pipes and a box culvert

  • Scheduled for construction in 2020

Hwy 14 — New Ulm gateway

Complete bridge aesthetics and landscaping

  • Status: Completed

Hwy 14 — New Ulm Highland Avenue study

A study is being conducted of the Hwy 14 and Highland Avenue intersection in New Ulm to analyze safety and mobility issues. 

  • Study in 2020

Highway 14 — Sanborn to Springfield

Resurfacing over 8 miles of Highway 14 from the west side of the Sanborn Four Corners intersection to the eastern city limits of Springfield.

  • Construction dates: 2022

Hwy 14 — New Ulm to Nicollet four-lane expansion

Construct a four-lane divided highway from New Ulm to Nicollet (12.5-mile segment) and bypass the city of Courtland

  • Scheduled for construction in 2022-2023

Hwy 14 — Owatonna to Dodge Center

Four-lane expansion

  • Construction dates: Segment 1 construction complete. Segment 2 construction TBD.

Hwy 15 — Hutchinson

Reconstruct and resurface Hwy 15 in Hutchinson

  • Construction dates: April to October 2020

Hwy 15 — Kimball

Reconstruct Hwy 15 from Willow Creek Park, south of the railroad tracks, to Hwy 55 in Kimball, Stearns County, includes pedestrian sidewalks and city utilities

  • Construction dates: 2021
  • Traffic impacts: Detour

Hwy 18 — East of Brainerd

Replace bridge over Portage Creek west of Hwy 6

  • Construction dates: July to August 2020
  • Traffic impacts: Detour

Hwy 19 — Cannon Falls repaving

Repaving, possible replacement of the traffic signal at the intersection of Hwy 19 and Hwy 20 along with ADA sidewalk improvements.

  • Scheduled for construction in 2022

Hwy 19 — Morton slope repair

Stabilize slope and repair road on Hwy 19 near Morton

  • Status: Completed

Hwy 19 — New Prague

Reconstruct Hwy 19 in downtown New Prague (city-led project)

  • Construction dates: 2020
  • Traffic impacts: Detour

Hwy 19 and College Drive — Marshall

Reconstruction of Hwy 19/College Drive from Fourth Street to Bruce Street

  • Scheduled for construction in 2025

Hwy 19 and Hwy 93 — Henderson

Flood feasibility study to evaluate the bridges and approach roadways over the Minnesota River for Hwy 19, Hwy 93 and Sibley County Road 6.

  • Study in progress; no projects have been funded or planned

Hwys 20–29

Hwy 21 — Jordan

Replacing two bridges, repaving, adding trail, erosion and drainage repair.

  • Construction dates: February through late November 2020
  • Traffic impacts: Full closure of Hwy 21 with detours

Hwy 21 — Shieldsville

Hwy 21 resurfacing

  • Scheduled for construction in 2021

Hwy 22 — Mapleton to Wells

Resurface Hwy 22 from approximately a quarter of a mile south of Mapleton to the north city limits of Wells, including the Hwy 22/Hwy 109/Faribault County Road 29 intersection

  • Scheduled for construction in 2023

Hwy 22 – Glencoe

  • Scheduled for construction in 2023

Hwy 23 — Cottonwood to Granite Falls

Resurface Hwy 23 from Cottonwood to Granite Falls.

  • Construction dates: May to November 2020

Hwy 23 — Deer Creek Bridge

Replace Deer Creek Bridge on Hwy 23 just south of Pleasant Valley in Carlton County

  • Construction dates: May to October 2020
  • Traffic impacts: Bypass

Hwy 23 — East St. Cloud

Resurface both directions from Benton Co. Rd. 1 to Hwy 95 east of St. Cloud. Reconstruct Hwy 23/Co. Rd. 8 access as a safer reduced conflict intersection

  • Construction dates: September through October 2020
  • Traffic impacts: Lane and shoulder closures

Hwy 23 — Foley to Milaca

Resurface and improve 12.5 miles of road from Foley to Milaca, includes: underground pipes/culverts, intersection turn lanes/access. Reconstruct one mile of road in Foley, includes: storm sewer, pedestrian sidewalk/multi-use trail and new roundabout.

  • Plans in progress
  • Construct in 2022

Hwy 23 — Fond du Lac

New road connection from Hwy 23 to Fourth Street in Fond du Lac

  • Construction dates: September to October 2020
  • Traffic impacts: Lane closures

Hwy 23 — Gaps

Expansion of Hwy 23 from two-lanes to four-lanes from New London to Paynesville and Paynesville to Richmond

  • Scheduled for construction in 2021

Hwy 23 — Mission Creek

Burial recovery and cemetery restoration

  • Construction dates: May 2017 (work has stopped, traffic impacts still in place)
  • Traffic Impacts: Lane closures

Hwy 23 — Mission Creek highway realignment and bridge replacement

Replace old bridge and realign highway

  • Scheduled for construction in 2023

Hwy 23 — Nemadji River Bridge

Replace Nemadji River Bridge on Hwy 23, 1.6 miles north of County Road 8 in Carlton County

  • Construction dates: May to October 2020
  • Traffic impacts: One lane bypass

Hwy 23 — New London

Construct J-turn

  • Scheduled for construction in 2022

Hwy 23 and Hwy 10 — St. Cloud interchange

Reconstruct and improve the Hwy 10 and Hwy 23 interchange area in east St. Cloud, Benton County. The project will reconstruct the road surfaces, reconstruct the Hwy 23 bridges over Hwy 10, replace drainage structures, and improve overall motorist and pedestrian safety and access.

  • Plans, study in progress; scheduled for construction in 2023

Hwy 23 and I-94 — Waite Park interchange

Add loop ramps to improve access to/from the Hwy 23/I-94 interchange

  • Status: Complete
  • Construction dates: July 2019 to May 15, 2020

Hwy 24 — Annandale

Reconstruct from Hwy 55 to Poplar Ave. in Annandale, includes pedestrian sidewalks and city utilities

  • Construction dates: April through November 2020
  • Traffic impacts: Detour(s)

Hwy 25 — Buffalo

Reconstruct Hwy 25 from south of 1st St. S to north of Settlers Pkwy. in Buffalo, Wright County, includes city utilities and pedestrian sidewalks and approaches.

  • Scheduled for construction in 2023

Hwy 25 — Montrose

Resurface and improve Hwy 25 from Hwy 12 to 7th St S., add new multiuse paved trail and install new water and sewer lines. (City of Montrose-led project)

  • Construction dates: Fall 2019 to spring 2020
  • Traffic impacts: Detour via local streets

Hwy 25 — Watertown, and Mayer

Resurface Hwy 25 south of Co. Rd. 30 in Mayer to State St in Watertown, update drainage and sidewalks to meet current American with Disability Standards (ADA).

  • Construction dates: July 2020 through June 2021

Hwy 27 — Osakis area

Reconstruct and improve Hwy 27 between I-94 in Douglas County and Hwy 71 in Todd County. The project will replace four bridges, reconstruct and widen the road and improve access.

  • Scheduled for construction in 2022

Hwy 28 — Chokio to Morris

Resurface, replace box culverts

  • Construction dates: 2020 construction season

Hwy 28 — Sauk Centre

Replace the bridge over Hoboken Creek west of Sauk Centre.

  • Construction dates: July through September 2020
  • Traffic impacts: Detour

Hwys 28, 29, and 114 — Starbuck Complete Streets

Downtown complete streets reconstruction, resurface, utility replacement, ADA improvements and multi-use trail.

  • Construction dates: 2020 construction season

Hwy 29 — Alexandria

Planning study to identify future highway improvements that will enhance traffic performance, mobility and driver satisfaction.

  • Study

Hwy 29 — Glenwood overpass

Construct bridge over the railroad tracks just north of Glenwood, realign the intersection of Hwy 29 and Hwy 55

  • Scheduled for construction in 2021

Hwy 29 — Montevideo bridge

Replace bridge on Hwy 29 over North Parkway Drive in Montevideo.

  • Status: Completed

Hwys 30-39

Hwy 30 — Cottonwood County

Resurface from Cottonwood County Road 7 to Hwy 71

  • Construction dates: July to September 2020
  • Traffic impacts: Lane restrictions

Hwy 30 and Hwy 22 — New Richland

Resurface Hwy 30 from Hwy 22 to New Richland; replace two bridges

  • Construction dates: May through October 2020
  • Traffic Impacts: Detour

Hwy 32 — Thief River Falls to St. Hilaire resurfacing

Resurface, pedestrian improvements in St. Hilaire

  • Construction dates: May to June 2020
  • Traffic impacts: Detour

Hwy 34 — East of County Road 29 to west of Osage

Selective tree logging in right of way, resurface (reclaim), culvert replacements, and bridge replacement at Shell River

  • Scheduled for construction in 2020-2021

I-35 — Duluth Lake Avenue Bridge

Resurface Lake Avenue Bridge in Duluth, safety and mobility improvements

  • Construction dates: April to September 2020
  • Traffic impacts: Lane and ramp closures

I-35 — Harris to Chisago/Pine County line

Concrete pavement work, drainage updates and safety improvements

  • Construction dates: Fall 2018 through June 2020

I-35 — Heath Creek Rest Area

Rest area reconstruction

  • Scheduled for construction in 2020

I-35 — Pine City

Replace the bridges at Hwy 70 and County Road 7

  • Construction dates: Mid-April to May 2020
  • Traffic impacts: Single lane closures

I-35 — Straight River Southbound Rest Area

Rest area reconstruction

  • Scheduled for construction in 2020

I-35, I-35E, I-35W North Metro Split — Lino Lakes to Forest Lake

Project includes resurfacing the road and replacing bridges

  • Construction dates: October 2017 through fall 2020
  • Traffic impacts: Lane and ramp closures

I-35E — Eagan standalone noise barrier

Construct new 3,500 foot long, 20 foot tall concrete noise barrier near NB I-35E between the Hwy 77 ramps and just south of Cliff Rd. in Eagan

  • Construction dates: November 2020 through July 2021
  • Traffic impacts: Shoulder closures

I-35E — Little Canada to White Bear Lake

Study to develop and evaluate conceptual alternatives for extending MnPASS from Little Canada Road to County Rd. 96

  • Study in progress; the environmental phase for a MnPASS extension project has begun

I-35E and I-94 — Saint Paul concrete rehabilitation project

Concrete pavement repair/resurfacing between Western Ave. and Mounds Blvd.; and on I-35E between I-94 and University Ave. in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Scheduled for construction in 2022-2023; preliminary work begins 2021

I-35E, I-35W, and I-35 North Metro Split — Lino Lakes to Forest Lake

Project includes resurfacing the road and replacing bridges

  • Construction dates: October 2017 through fall 2020
  • Traffic impacts: Lane and ramp closures

I-35W — Burnsville and Bloomington

Reconstruct I-35W bridge over the Minnesota River, replace pavement, add northbound lane

  • Construction dates: August 2018 through November 2021
  • Traffic impacts: Lane closures and detours

I-35W — Richfield

Repaired concrete on I-35W between 66th St. and 76th St. in Richfield

  • Status: Completed

I-35W — Minneapolis

Crews will build six stormwater storage tanks east of NB I-35W between 40th St. and 42nd St.

  • Construction dates: February 2020 through August 2023
  • Traffic impacts: Overnight lane closures of NB I-35W; short-term closures of Second Ave.

I-35W — North Gateway Study

Study the freeway between Park Ave. in Minneapolis and Co. Rd. C in Roseville to identify needs for future construction projects.

  • Study in progress

I-35W — Roseville to Lino Lakes

Construct MnPASS Express Lanes (one lane in each direction) in the middle of existing I-35W between Hwy 36 in Roseville and Sunset Ave. (Co. Rd. 53) in Lino Lakes

  • Construction dates: Summer 2018 through fall 2021

I-35W, I-35E, I-35 North Metro Split — Lino Lakes to Forest Lake

Project includes resurfacing the road and replacing bridges

  • Construction dates: October 2017 through fall 2020
  • Traffic impacts: Lane and ramp closures

I-35W and Hwy 52 — Metro-wide noise wall repairs

Repair select noise walls along I-35W and Hwy 52 in Dakota and Hennepin Counties

  • Construction dates: October 2018 through spring 2020
  • Traffic impacts: Lane, ramp and shoulder closures

I-35W and I-94 — Downtown to Crosstown (Minneapolis)

Improve transit and regional access, reconstruct bridges and pavement

  • Construction dates: August 2017 through fall 2021
  • Traffic impacts: Road, lane and ramp closures and delays

I-35W and I-494 — Study

Interchange improvements

  • Status: Study complete

Hwy 36 — North Saint Paul to Oakdale study

Develop preliminary concept designs for intersection improvements at Century Avenue and Hadley Avenue

  • Funded for construction in 2019

Hwy 36 — Saint Croix River Crossing

Mitigation for construction of the new Saint Croix River Crossing. Includes rehabilitation of the Stillwater Lift bridge, construction of the Upper Loop Trail along Hwy 95 and landscaping along Hwy 95 north of the bridge and in the interchange of Hwy 36 and Hwy 95

  • Construction dates: May 2014 through spring 2020
  • Traffic impacts: Road closure and detour, lane closures, shoulder closures, noise impacts

Hwy 36 — Stillwater Lift Bridge

Transformation into a bicycle/pedestrian crossing including repaired steel connections, restored mechanical and electrical components, repaired concrete railings, reconstructed concourse, paint and lighting replacements

  • Status: Completed

Hwy 36 and County Hwy 15 — Manning Avenue Interchange

Locally led project to construct interchange at Manning Ave. (Washington County Hwy 15) and Hwy 36.

  • Scheduled for construction in 2021

Hwy 37 — Gilbert

Resurfacing, safety and accessibility improvements on Hwy 37 from Hwy 53 to Hwy 135

  • Construction dates: July to October 2020, and May to August 2021
  • Traffic impacts: Lane closures

Hwy 38 — Bigfork

Resurface Hwy 38 through Bigfork, from Rajala Mill Road to CR 14; curb, gutter and sidewalk work

  • Scheduled for construction in 2023

Hwys 40-59

Hwy 40 — Milan Bridge

Replace bridge (known as Milan Bridge) over Lac qui Parle Lake west of Milan.

  • Construction dates: May 2019 to summer 2020

Hwy 41 — Chaska

Landscape, reconstruct and expand road, improve intersection, signals and pedestrian ramps, relocate trail and build underpass for trail between Hwy 212 and Pioneer Trail. Project lead is Carver County.

  • Construction dates: May 2018 through summer 2019
  • Traffic impacts: Lane and turn lane closures

Hwy 41 — River crossing

Connect Hwy 169 and new Hwy 212 near Hwy 41

  • Study complete; no projects have been funded or planned

Hwy 42 — Resurfacing

Resurfacing Hwy 42 from Plainview to the west side of the newly replaced bridge west of Hwy 61

  • Scheduled for construction in 2020

Hwy 43 — Repaving

Repave Hwy 43 from Hwy 44 near Mabel to Hwy 16 near Rushford in Fillmore County

  • Detours and single-lane closures with flaggers during the project.
  • Scheduled for construction in 2022

Hwy 47 — Hwy 65 (Central Avenue) to 27th Avenue

Resurface Hwy 47 from Hwy 65 to 27th Ave. NE in Minneapolis, ADA improvements, sidewalk improvements, replace guardrail and repair drainage

  • Scheduled for construction in 2024

Hwy 47 — Isle to Ogilvie

Reconstruct 22 miles of road surface, improve road access and update drainage between Hwy 27/47 in Isle and Hwy 23 in Ogilvie. Replace two bridges near Ann Lake.

  • Construction dates: May through November 2020
  • Traffic impacts: Detour(s)

Hwy 47 — St. Francis

MnDOT is beginning a planning study of the Hwy 47 St. Francis corridor to examine a range of alternatives to address pedestrian, bicycle and motorist safety, as well as road capacity, and access and mobility issues.

  • On hold

Hwy 47/Ferry Street and BNSF Railroad Crossing — Anoka

Construct a new crossing of the BNSF Railroad north of Highway 10

  • Study complete; preliminary design underway; no projects have been funded or planned

Hwy 47 and Hwy 10 — Anoka and Coon Rapids

Resurface Hwy 10 in both directions between Hwy 47 and Hwy 65 and Hwy 47 between Anoka Co. Rd 10 and Hwy 10; Americans with Disabilities (ADA) improvements at the Hwy 47 and Co. Rd. 10 interchange and at the Hwy 10/610 and University Ave. (Co. Rd. 51) interchange.

  • Construction dates: Mid-September through October 2020
  • Traffic impacts: Lane and shoulder closures

Hwy 47 and Hwy 65 — Columbia Heights to Coon Rapids

Conduct a roadway safety audit to analyze crash information with a focus on pedestrian crashes on Hwy 47 and Hwy 65 between the Hennepin-Anoka County line in Columbia Heights and Hwy 10 in Coon Rapids.

  • Construction dates: Spring 2020 through 2021

Hwy 47 and Hwy 169 — Anoka

Repair and resurface approximately 2.5 miles of Hwy 169 between the north end of the Mississippi River bridge to Clay St. in Anoka. Hwy 47 will be resurfaced from Pleasant St. to Bunker Lake Rd. in Anoka.

  • Scheduled for construction in 2021

Hwy 51 (Snelling Avenue) — Roseville to Arden Hills

Install cable median barrier between Co. Rd. C and 1-694 and extend left turn lanes at Lydia Ave. W Co. Rd. C2 and Co. Rd. C.

  • Construction dates: 2022

Hwy 51 (Snelling Avenue) — Hewitt Avenue to Midway Parkway

Safety and mobility needs study

  • Developing a preliminary design. Study completed in 2013.

Hwy 52 — Cannon Falls to Hader access study

Study to identify a recommended alternative

  • Study completed 2012; several projects completed or planned

Hwy 52 — Hader southbound improvements

The project follows along Highway 52, from roughly 2 miles south of Cannon Falls and ends at Zumbrota.

  • Scheduled for construction in 2021

Hwy 52 — Saint Paul to Rochester corridor projects

Four different road construction projects are planned for Hwy 52 between Rochester and St. Paul

  • Construction dates: 2020
  • Traffic impacts: Single lane traffic in each direction, temporary ramp closures, detours for some vehicles

Hwy 52 — Saint Paul, West Saint Paul, Inver Grove Heights

Resurface Hwy 52 between I-494 in Inver Grove Heights and Hwy 156/Concord St. in West St. Paul and repair concrete on Hwy 52 between Concord St. in West St. Paul and Plato Blvd. in St. Paul.

  • Scheduled for construction in 2021

Hwy 52 and I-35W — Metro-wide noise wall repairs

Repair select noise walls along I-35W and Hwy 52 inn Dakota and Hennepin Counties

  • Construction dates: October 2018 through spring 2020
  • Traffic impacts: Lane, ramp and shoulder closures

Hwy 53 — International Falls

Reconstruct Hwy 53 from Crescent Drive to 4th Street and on Hwy 11 from the east junction of Hwy 71 to the east junction of Hwy 53 in International Falls in St. Louis County; complete streets improvements

  • Construction dates: July to October 2020, and May to October 2021
  • Traffic impacts: Lane closures, local detours

Hwy 53 — Virginia

Turn lanes, traffic signal and accessibility improvements at 13th Street, Mount Iron Drive, 12th Avenue West and Second Avenue West in Virginia in St. Louis County

  • Construction dates: July to October 2020
  • Traffic impacts: Lane closures, local detours

Hwy 53 and Hwy 1 — St. Louis, Koochiching Counties

Intersection improvement, passing lanes project

  • Construction dates: 2019 to 2020

Hwy 55 — Brooten, Belgrade

Reconstruct Hwy 55 through the cities of Brooten and Belgrade, Stearns County, includes road surface, storm sewer and pedestrian sidewalks.

  • Scheduled for construction in 2021
  • Traffic impacts: Detour in Brooten; Lane closures in Belgrade

Hwy 55 — Golden Valley

Resurface Hwy 55 between General Mills Blvd. and Hwy 100 in Golden Valley; improve safety and accessibility; potentially construct beginning of trail between Winnetka Ave. and Glenwood Ave.

  • Scheduled for construction in 2021

Hwy 55 (Hiawatha) — Minneapolis storm sewer project

Repair storm sewer pipe that takes water from Hwy 55 in Minneapolis to the Mississippi River. The work can only be done during cold temperatures.

  • Construction dates: December 2018 through fall 2020

Hwy 55 — Plymouth bridge

Repair concrete, replace joints and make improvements to the barrier on the westbound Hwy 55 bridge over the Luce Line and the railroad tracks.

  • Construction dates: July 7 through August 2020
  • Traffic impacts: Lane restrictions and trail closure

Hwy 55 — Plymouth to Rockford

Lane expansion

  • Study in progress; no projects have been funded or planned

Hwy 55 — Pomme de Terre Bridge Replacement

Replace the bridge at Pomme de Terre River, southeast of Barrett

  • Construction dates: 2020 construction season

Hwy 55 and Hwy 59 — Elbow Lake to Barrett

Resurfacing (reclaim), shoulder-widening, with 8 additional feet (4-foot paved, 4-foot gravel) on each side of the highway, culvert replacements, turn lanes at County Road 8 and County Road 21, potential installation of snow fence, access improvements, and pedestrian ramp installation in the city of Barrett.

  • Scheduled for construction in 2023

Hwy 56 — Taopi to LeRoy

Repaving

  • Scheduled for construction in 2020

Hwy 57 and Hwy 60 — Wanamingo

Intersection roundabout

  • Scheduled fo construction in 2020

Hwy 59 — Newfolden

Replace two culverts

  • Construction dates: July to September 2020
  • Traffic impacts: Detour

Hwy 59 and Hwy 14 — Slope repairs

Stabilize slopes in Lyon, Murray and Redwood counties

  • Construction dates: July to September 2020

Hwy 59 and Hwy 108 — Pelican Rapids

Utility replacement, sidewalk improvements, bicycle & ADA accessibility upgrades.

  • Planning

Hwys 60-79

Hwy 60 — Lake Crystal

MnDOT is conducting a transportation study that reflects the current and future transportation needs on Highway 60 through Lake Crystal. With input from the city of Lake Crystal, local residents and businesses, and other project stakeholders, MnDOT will evaluate the corridor, develop design alternatives, and arrive at a preliminary layout for a future Highway 60 roadway project.

  • Scheduled for construction in 2024

Hwy 60 — Madison Lake, Elysian, Waterville lake connection

Resurface approximately 16 miles of Hwy 60, including a reconstruction through Madison Lake

  • Scheduled for construction in 2021

Hwy 60 — Zumbro Falls

Hwy 60 improvements

  • Scheduled for construction in 2022

Hwy 61 — Grand Marais

Reconstruct, resurface Hwy 61 in Grand Marais, accessibility, drainage improvements from just north of Cutface Creek to just north of Hwy 14 in Grand Marais in Cook County

  • Construction dates: December 2019 to 2021
  • Traffic impacts: Lane closures, detours

Hwy 61 — Grand Portage

Resurfacing and bridge project from Reservation Bay Road to the Canadian Border in Cook County

  • Construction dates: July 2020 to fall 2021
  • Traffic impacts: Lane closures, local detour

Hwy 61 Wabasha to Minnesota City

Resurfacing southbound lanes, constructing a reduced conflict intersection at Hwy 42 and replacing approach panels on six bridges

  • Scheduled for construction in 2022

Highway 61 Resurfacing - Lake City to Red Wing

Resurfacing road, adding passing zone and changing access

  • Scheduled for construction in 2023

Hwy 61 — Lake City

Hwy 61 reconstruction

  • Scheduled for construction in 2020

Highway 61 — Withers Harbor Bridge

  • Scheduled for construction in 2023

Hwy 61/Hwy 316 Roundabout

Constructing a roundabout at intersection, improving bicycle facilities, connections near Prairie Island Indian Community

  • Scheduled for construction in 2022

Hwy 61/County Road 18 Intersection Safety

Constructing a reduced conflict intersection north of Red Wing

  • Scheduled for construction in 2022

Hwy 61 — Lake County

Install new efficient tunnel lighting systems

  •  Scheduled for construction in 2021

Hwy 61 — Silver Creek and Stewart River bridges

Replace Silver Creek Bridge, rehabilitate existing Stewart River Bridge and add new bridge inland.

  • Scheduled for construction in 2021-2022

Hwy 61 — Two Harbors

Resurface almost seven miles of pavement south of Two Harbors, new intersection

  • Scheduled for construction in 2021

Hwy 61 — Winona

Hwy 61 intersection safety improvements

  • Scheduled for construction in 2020

Hwy 61 — Wyoming to Forest Lake

Resurface Hwy 61 between I-35 in Wyoming and Hwy 8 in Forest Lake. The work will include pavement work, drainage, right turn lanes, safety and pedestrian improvements.

  • Scheduled for construction in 2021

Hwy 63 — Red Wing bridges

Rehabilitate existing bridges, identify a preferred alternative for a bridge crossing between Red Wing, Minn. and Wisconsin

  • Construction dates: May 2017 to August 2020

Hwy 63 and I-90 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Scheduled for construction in 2020-2021

Hwy 65 — Ham Lake, Blaine and Spring Lake Park

Corridor access planning study between Bunker Lake Blvd. and Co. Rd. 10

  • Study 2018-2020

Hwy 65 — Isanti

Improve access; install a reduced conflict intersection to improve access at Hwy 65/Cajima St NE, Isanti. (City of Isanti-led project)

  • Construction dates: July through September 2020
  • Traffic impacts: Lane and shoulder closures

Hwy 65 and 41st Avenue — Columbia Heights

Replace signal system at intersection of Hwy 65 and 41st Ave. Install audible pedestrian signals and upgrade pedestrian crossing to ADA standards.

  • Construction dates: Early September 2019 through spring 2020
  • Traffic impacts: Daytime non-peak lane closures. Pedestrian and business access will be maintained at all times.

Hwy 65 and Hwy 2 — Swan River roundabout

Construct roundabout

  • Scheduled for construction in 2023

Hwy 65 and Klondike Drive Northeast — Cedar and East Bethel

Build a non-signalized reduced conflict intersection

  • Currently in design; scheduled for construction in 2021

Hwy 65/Third Avenue Bridge — Minneapolis

The Hwy 65/Third Avenue bridge will get major renovation improvements including a new bridge deck.

  • Construction dates: May 2020 through August 2022
  • Traffic impacts: Lane and bridge closures

Hwy 65 — Albert Lea Main Street

Repaving road, flood mitigation and ADA work

  • Scheduled for construction in 2022

Hwy 67 — Clarkfield

Reconstruction of Hwy 67 from Hwy 59 to Sixth Street

  • Scheduled for construction in 2023

Hwy 67 — Granite Falls to Echo

The road will remain closed through 2020 due to slide area

  • Not yet scheduled for construction

Hwy 67 — Morgan

Resurface road. Project led by City of Morgan.

  • Construction dates: Summer 2018 to 2021

Hwy 68 — Minneota to Marshall

Shoulder widening and culvert replacement

  • Scheduled for construction in 2021

Hwy 71 — Bemidji

Corridor safety evaluation

  • Community Review Panel study

Hwy 71 — County Road 90 J-turn

Construction of J-turn

  • Preliminary design and environmental work

Hwy 71 — Jackson to Windom and Windom to Hwy 30

Resurfacing and bridge replacement

  • Construction dates: May to August 2020
  • Traffic impacts: Detour for bridge replacement near Jackson

Hwy 71 — Long Prairie

Replace bridge over Long Prairie River in Long Prairie; resurface Hwy 71 one mile north of Long Prairie.

  • Construction dates: Mid-May through early September 2020
  • Traffic impacts: Detour

Hwy 71 — Park Rapids

Install truck route signs, install intersection lighting

  • Construction dates: June 2020
  • Traffic impacts: None

Hwy 71 — Windom to Hwy 30

Resurfacing

  • Scheduled for construction in 2020

Hwy 72 — Blackduck

Replace three culverts between Blackduck and Kelliher

  • Construction dates: August to October 2020
  • Traffic impacts: Detour

Hwy 72 — Waskish

Resurface 14 miles of rural Hwy 72 between Waskish and Baudette

  • Construction dates: May to June 2020
  • Traffic impacts: Lane closures

Hwy 73 — Railroad bridge

Rehabilitate the Hwy 73 bridge over the BNSF Railroad on Hwy 73, 2.5 miles south of Hwy 169 in Saint Louis County

  • Construction dates: May to October 2020
  • Traffic impacts: Detour

Hwy 74 — Bridge replacement

Replace a bridge on Hwy 74 north of Winona County Road 30.

  • Construction dates: May to July 2020
  • Traffic impacts: Detour

Hwy 75 — Argyle

Resurface and pedestrian improvements

  • Construction dates: July to October 2020
  • Traffic impacts: Lane closures

Hwy 75 — Mustinka River Bridge replacement

Replace bridge over Mustinka River; resurface from Fifth Street in Wheaton to Mustinka River

  • Construction dates: 2020 construction season

Hwy 75 — Madison to Bellingham

Resurface Hwy 75 from Hwy 212 to Hwy 7.

  • Construction dates: July to October 2020

Hwy 75 — Pipestone bridge

Replace bridge on Hwy 75 over Pipestone Creek.

  • Construction dates: June to November 2020

Hwy 75 — Rabbit River bridge replacement

Replace the bridge at Rabbit River, south of Doran

  • Scheduled for construction in 2023

Hwy 75 — Warren

Resurface and pedestrian improvements on Hwys 1 and 75

  • Construction dates: July to October 2020
  • Traffic impacts: Lane closures

Hwy 77 — Richfield

Build underpass beneath Hwy 77 connecting 77th St. in Richfield to 66th St.; build ramps, build trail, sidewalk.

  • Scheduled for construction in 2021-2022

Hwys 80-99

Hwy 84 — Pine River

Replace the Hwy 84 bridge over the Norway Brook in Pine River, Cass County. The new structure will have pedestrian sidewalks on both sides and shoulders for bicyclists.

  • Scheduled for construction in 2021

Highway 86 — Lakefield

Upgrade wastewater and water systems throughout the city, including those located under Hwy 86.

  • Construction dates: 2022

Hwy 87 — Frazee

MnDOT will complete two related projects on Hwy 87 in the Frazee area in 2021 and 2022.

  • Scheduled for construction in 2021 (rural segment) and 2022 (urban segment)

Hwy 87 — Frazee to Menahga

Clear cut all trees and vegetation in right of way ahead of 2021 construction project

  • Construction dates: Winter 2020-2021

I-90 — Austin bridge replacements

Replacing two bridges over Interstate 90

  • Scheduled for construction in 2021

I-90 — Austin repaving

I-90 repaving

  • Scheduled for construction in 2020

I-90 — Fairmont to Blue Earth corridor preservation

Pavement restoration and bridge rehab

  • Construction dates: 2019-2020
  • Traffic impacts: Lane restrictions

I-90 — Hayward and Oakland Woods rest area

Rest area reconstruction

  • Construction dates: June 2019 to October 2020
  • Traffic impacts: Rest area will be closed during construction

I-90 — Nodine bridge replacement

Bridge replacement

  • Scheduled for construction in 2020

I-90 and Hwy 63 — Stewartville

Interchange improvements including replacement of the Hwy 63 bridges, and safety and vehicle traffic capacity improvements to the ramp geometrics and traffic operations within the corridor.

  • Scheduled for construction in 2020-2021

Hwy 91 — Adrian North

Resurface from Adrian to Nobles/Murray County line

  • Status: Completed

Hwy 91 — Nobles/Murray County line to Russell

Resurface Hwy 91 from Nobles/Murray County line to Russell, replace four bridges, repair culverts, improve sidewalks in Lake Wilson

  • Status: Completed

Hwy 93 and Hwy 19 — Henderson

Flood feasibility study to evaluate the bridges and approach roadways over the Minnesota River for Hwy 19, Hwy 93 and Sibley County Road 6.

  • Study in progress; no projects have been funded or planned

I-94 — Dale Street Bridge in Saint Paul

Reconstruct Dale Street (Ramsey County Road 53) between Iglehart Avenue and University Avenue, and the Dale Street bridge over I-94.

  • Construction dates: March 2020 through July 2021
  • Traffic impacts: Lane and ramp closures with detours

I-94 — East Metro Interchange (I-694/I-494/I-94)

Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

  • Construction dates: 2019 through late fall 2020
  • Traffic impacts: Lane, ramp closures and delays

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction dates: August 2019 through fall 2021
  • Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

I-94 — Minneapolis

Resurface road and ramps on I-94 between Nicollet Ave. and Hwy 280

  • Construction dates: June 29 through September 2020
  • Traffic impacts: Weekend and overnight directional lane and ramp closures in late July and August

I-94 — Minneapolis bridge over 17th Avenue

Crews repaired and painted the bridge over the blue line light-rail transit at 17th Ave.

  • Status: Completed

I-94 — Minneapolis to Saint Paul

Study to gather public input about this corridor

  • Study in progress; some project funding identified for 2021 and 2022

I-94 — Saint Paul

ADA pedestrian ramps and sidewalk improvements along St. Anthony Ave. and Concordia Ave. Periodic enhancements will occur along the project area.

  • Construction dates: May 2020 through October 2021
  • Pedestrian impacts: Sidewalk closures

I-94 and I-35E — Saint Paul

Concrete pavement repair/resurfacing between Western Ave. and Mounds Blvd.; and on I-35E between I-94 and University Ave. in St. Paul. Resurface ramps and frontage roads, bridge repair, fix drainage and repair various sidewalks and ADA improvements

  • Scheduled for construction in 2022-2023; preliminary work begins fall 2021

I-94 and I-35W — Downtown to Crosstown (Minneapolis)

Improve transit and regional access, reconstruct bridges and pavement

  • Construction dates: August 2017 through fall 2021
  • Traffic impacts: Lane and ramp closures

I-94 and I-694 — Brooklyn Center

Resurface, concrete pavement repairs, drainage and ADA improvements on I-94/I-694 between Brooklyn Blvd. and just east of Dupont Ave. in Brooklyn Center.

  • Currently in design; Scheduled for construction in 2021

I-94 — Central Minnesota

Future road construction plans for I-94 in Wright and Stearns counties, in central Minnesota. Includes the communities of St. Michael, Albertville, Monticello, Clearwater, St. Cloud, Collegeville and Sauk Centre.

  • Current, future plans and studies

I-94 — Maple Grove to Clearwater

Resurface road, replace/construct bridges, add lanes and improve access

  • Construction dates: August 2019 to fall 2021
  • Traffic impacts: All lanes will remain open during construction with lane restrictions on nights or weekends. Special consideration is being made to keep Friday evening weekend rush hour lanes open.

I-94 — Melrose to Freeport

Resurface both directions of I-94 between Melrose and Freeport (nine miles) in Stearns County

  • Construction dates: Late summer 2020
  • Traffic impacts: Daytime single lane closures

I-94 to Hwy 10 — New freeway connection project study

Proposed freeway connection and river crossing between Hwy 10 and I-94 using Hwy 24 in Wright and Sherburne counties

  • Study completed 2007; project is unprogrammed; no funds are available

I-94 and Hwy 27 — Eastbound ramps

MnDOT will design intersection improvements for the Highway 27/Interstate 94 eastbound ramps to improve safety and efficiency along the I-94/Highway 27/County Road 46 corridors.

  • Scheduled for construction in 2023

Hwy 95 — Bayport and Lakeland

Repair pavement, Update drainage, Upgrade sidewalks and curb ramps

  • Construction dates: Work begins spring 2020

Hwy 95 and Manning Avenue — Washington County safety improvements

Widening shoulders, resurface road, add turn lanes and update drainage.

  • Construction dates: July 2017 through late fall 2021
  • Traffic impacts: Closures, detours

Hwy 95/Hemmingway Avenue roundabout — North Branch

Construct a single-lane roundabout on Hwy 95 at Hemmingway Ave. in North Branch.

  • Construction dates: Late April through September 2020
  • Traffic impacts: Road closures with detour, lane restrictions

Hwy 97 — Forest Lake

Constructing left turn lanes on Hwy 97 at North Shore Trail and at Keewahtin Avenue North.

  • Construction dates: Spring through fall 2020

Hwy 97/Goodview Avenue roundabout — Forest Lake

Construct a single-lane roundabout on Hwy 97 at Goodview Ave./8th St. in Forest Lake.

  • Construction dates: May through late August 2020
  • Pedestrian impacts: Lane restrictions and road closures with detour

Hwys 100-199

Co. Rd. 101/Central Ave. Bridge over Hwy 12 — Wayzata

Repaired the Co. Rd. 101/Central Ave. Bridge over Hwy 12, added left turn lanes, reconstructed approaches, and repaired ramp pavement

  • Status: Completed

Hwy 111, Hwy 22 — Nicollet to Gaylord

Resurface from Nicollet to Gaylord

  • Construction dates: May to October 2020
  • Traffic impacts: Detour

Hwy 123 — Sandstone

Resurfacing Hwy 123 from Hwy 23 to County Hwy 30, and realign Hwy 123 and Hwy 23 intersection

  • Scheduled for construction in 2021

Hwy 135 — Biwabik

Reconstruct Hwy 135 in Biwabik; complete streets improvements

  • Construction dates: July to September 2020, May to October 2021
  • Traffic impacts: Lane closures, possible detour

Hwy 149 High Bridge (Smith Ave. and Dodd Rd.) — St. Paul to Mendota Heights

Landscaping

  • Construction dates: Spring 2020 through June 2021
  • Traffic impacts: Possible shoulder closures

Hwy 169 — Belle Plaine

Belle Plaine Area Plan

  • Study completed 2003; no projects have been funded or planned

Hwy 169 — Mobility study

Hwy 169 mobility and transit improvements between Hwy 55 in Golden Valley and Hwy 41 in Shakopee, and between Mankato and the Twin Cities Metro area.

  • Study complete

Hwy 169 — Plymouth

Place concrete barrier on Rockford Rd. bridge

  • Status: Completed

Hwy 169 — Shakopee to Blakely

Identify options for access changes, improvements to safety and mobility

  • Study underway

Hwy 169 and 101st Avenue interchange — Brooklyn Park

The city of Brooklyn Park is constructing a new interchange at Hwy 169 and 101st Ave.

  • Construction dates: March through November 2020
  • Traffic impacts: Hwy 169 lane and traffic shifts, no anticipated lane closures

Hwy 169 and Hwy 41 — River Crossing

Connect Hwy 169 and new Hwy 212 near Hwy 41

  • Study completed in 2015; no projects have been funded or planned

Hwy 169 and Hwy 41 — Scott County intersection improvements

MnDOT and Scott County are constructing a new interchange at Highways 169/41/78 in Jackson and Louisville townships

  • Construction dates: Fall 2018 through fall 2020
  • Traffic impacts: Hwy 169 lane closures and traffic shifts, temporary full road closures and detours, restricted access to Hwy 41 and Co. Rd. 78 from Hwy 169, and permanent access changes.

Hwy 169 and Hwy 47 — Anoka and Ramsey

Repair and resurface approximately 2.5 miles of Hwy 169 between the south end of the Mississippi River bridge to Clay St. in Anoka and Hwy 47 from Pleasant St. to Bunker Lake Rd. in Ramsey

  • Scheduled for construction in 2021

Hwy 169 — Blue Earth to Iowa

Resurface nine miles of Hwy 169 from Faribault County Road 52 (southern limits of Blue Earth) to the Minnesota-Iowa border

  • Preliminary design in progress; scheduled for construction in 2022

Hwy 169 — Elk River freeway

Convert three miles of Hwy 169 to a new freeway system through Elk River from Hwy 101/Hwy 10 to 197th Ave, Sherburne County. Corridors of Commerce project.

  • Preliminary design in progress; scheduled for construction in 2022-2024

Hwy 169 — Elk River to Zimmerman project study

Assessed range of reasonable alternatives to corridor improvements.

  • Study completed 2013; no projects have been funded or planned

Hwy 169 — Marble to Pengilly

Safety improvements

  • Scheduled for construction in 2021

Hwy 169 — Milaca

Install Reduced Conflict Intersections (RCI) at Mille Lacs Co. Rd. 11 north of Milaca, and Co. Rd. 12 and Co. Rd. 13 south of Milaca.

  • Construction dates: May to June 2020
  • Traffic impacts: Lane closures

Hwy 169 — Nashwauk

Construct intersection safety improvements at the intersection of Hwy 169 and Hwy 65 Nashwauk

  • Construction dates: July to August 2020
  • Traffic impacts: Lane closures, local detour

Hwy 169 — Saint Louis County

Resurfacing Hwy 169 from Hwy 53 to CR 26 in St. Louis County, incudes NB Hwy 169 ramp

  • Construction dates: July to October 2020
  • Traffic impacts: Lane closures

Hwy 169 — Saint Peter

The pavement on Hwy 169 from Broadway Ave. to Union St. (approximately half of a mile) is deteriorating more quickly than the subsequent sections of Hwy 169. MnDOT completed a maintenance project in 2019 that extended the life of the pavement in this segment, gaining about 5-7 years before a future project will address a more significant pavement fix and other accommodations

  • Unknown

Hwy 169 — Vineland

Install pedestrian High Intensity Activated Crosswalk System (HAWK) system at Hwy 169/Ataage Dr. in Vineland. Project led by Mille Lacs Band of Ojibwe

  • Construction dates: Late summer 2020
  • Traffic impacts: Single lane or shoulder closures

Hwy 169 and Hwy 210 — Aitkin to north of Hassman

Reconstruct 11 miles of road surface, widen shoulders and upgrade drainage infrastructure.

  • Plans in progress; scheduled for construction in 2022

Hwy 169, Hwy 22, Hwy 99 — St. Peter intersections

A project is planned in 2023 to improve the pavement condition, intersection safety, and mobility along the Hwy 169 corridor on the south side of St. Peter, including the intersections with Hwy 22 and Hwy 99

  • Scheduled for construction in 2023

Hwy 172 — Baudette

Resurface between Baudette and Wheeler’s Point

  • Construction dates: August to October 2020
  • Traffic impacts: Detour

Hwy 194 — Central Entrance repaving

Repaving Hwy 194/Central Entrance in preparation of the Twin Ports Interchange traffic detour

  • Construction dates: July 6-24, 2020
  • Traffic impacts: Work will be done at night to reduce impact

Hwy 194 — RCUT and roundabout

  • Construction dates: 2022
  • Traffic impacts: Lane closures when construction begins.

Hwy 194 and Hwy 2 roundabout

  • Construction dates: 2023
  • Traffic impacts: Detour while roundabout is constructed.  

Hwy 197 — Bemidji

Corridor safety and access management

  • Community Review Panel study (looking for preferred alternative in spring 2021)

Hwys 200-299

Hwy 200 — Laporte

Reconstruct and raise grade

  • Construction dates: June to September 2020
  • Traffic impacts: Detour

Hwy 200 — Mahnomen to Roy Lake

Shoulder widening, pedestrian accessibility improvements, and drainage repairs.

  • Planning

Hwy 200 — Whipholt

Historic restoration at roadside parking area

  • Construction dates: June to September 2020
  • Traffic impacts: None (boat access closed for one to two weeks)

Hwy 210 — Box Culvert Replacements

Replace four box culverts along Hwy 210  in Carlton County.

  •  Scheduled for construction in 2022

Hwy 210 — Brainerd project study

Study of the Hwy 210/Washington St. corridor between Baxter Dr. and Pine Shores Rd in Brainerd, Crow Wing County. Results of the study will  inform plans for the future reconstruction project.

  •  Study 2019-2021; plan 2022-2024; scheduled for construction in 2025 or beyond

Hwy 210 — Crosby to Ironton

Reconstruct or resurface road and improve pedestrian accessibility on Hwy 210 from east of Third Ave East near the Cuyuna Regional Medical Center in Crosby, to west of Sixth Ave in Ironton.

  •  Scheduled for construction in 2021

Hwy 210 — West of I-94 near Fergus Falls

Concrete reconstruct, snow fence, lighting  

  • Construction dates: 2020 construction season

Hwy 210 and Hwy 73 — Cromwell

Drainage and safety improvements

  •  Scheduled for construction in 2021

Hwy 212 — Carver to Norwood Young America

Transportation Planning Study

  • Study underway

Hwy 212 — Norwood Young America

Repave Hwy 212 from Hwy 25/5 to Cologne

  • Construction dates: June through November 2020

Hwy 218 — Blooming Prairie

The Hwy 218 corridor through Blooming Prairie (Fourth Street to Hwy 30) is due for reconstruction in 2023.

  • Scheduled for construction in 2023

Hwy 220 — Oslo

Replace bridges over the Snake and Tamarac Rivers north of Oslo

  • Construction dates: Summer 2019 to late-June 2020
  • Traffic impacts: Detour

Hwy 251 — Hollandale

Resurfacing and culvert replacement

  • Scheduled for construction in 2020

Hwy 252 and I-94 — MnPASS mobility study

Convert Hwy 252 into a freeway between 66th Ave. in Brooklyn Center and Hwy 610 in Brooklyn Park. Work would include removing and replacing intersections along the roadway. Add a MnPASS lane to I-94 from Brooklyn Center to downtown Minneapolis.

  • Study underway

Hwy 263 — I-90 to Ceylon

Resurface Hwy 263 in preparation for a turnback of the highway to Martin County

  • Scheduled for construction in 2022

Hwys 300-694

Hwy 313 — Warroad

Resurface between Warroad and Canada

  • Construction dates: September to October 2020
  • Traffic impacts: Lane closures

Hwy 316 — Hastings

Repave Hwy 316 between the north and south junctions of Hwy 61 and evaluate a portion between the north junction of Hwy 61 and Tuttle Drive

  • Scheduled for construction in 2021-2022

Business Hwy 371 — Barrows to Brainerd

Reconstruct the road, upgrade the signal and improve pedestrian access  from Greenwood St. to Joseph St. in Brainerd; Resurface road from 70th Ave. in Barrows to Greenwood St. Work requires detours.

  • Scheduled for construction in 2022

Hwy 371 — Brainerd Lakes area

Improve access and safety at three intersections along a busy stretch of Hwy 371 with use of reduced conflict intersections between Gull Lake Dam Road (Crow Wing CR 125) and Green Gables Road (Crow Wing CR 126), includes access to Birchdale Rd (Brainerd International Raceway).

  • Plans in progress; scheduled for construction in 2022

Hwy 371 — Hackensack

Reconstruct HWY 371 from CR 40 to CR 5 in Hackensack.

  • Community outreach, information gathering and project development

Hwy 371 — Nisswa to Pine River project study

Project study to expand to four lanes and improve access along the corridor. Since the study was completed, Hwy 371 has been expanded to four lanes between Nisswa and Jenkins. Pine River to Jenkins remains unprogrammed for expansion.

  • Status: Study complete

I-394 — Minneapolis

Repair I-394 bridge over Dunwoody Blvd. in Minneapolis.

  • Construction dates: September 2019 through September 2020
  • Traffic Impacts: Ramp closures and directional overnight closures of I-394 in July
  • Contact: Dave Aeikens

I-494 — Airport to Hwy 169

Study to evaluate design alternatives and determine a scope of work for the future reconstruction of the I-494 corridor from the MSP Intl’ Airport to Hwy 169. The proposed project is envisioned to improve the capacity of the interstate and dramatically improve the reliability of the average rush hour trip.

  • Study underway; scheduled for construction in 2022-2024

I-494 — Bloomington to Eagan

Resurface trail from the River Bridge  to Hwy 13

  • Construction dates: June 15-24, 2020
  • Trail impacts: Trail closed between American Blvd. cul-de-sac and Hwy 13 for 7 days
  • Traffic impacts: Lane closures

I-494 and France Avenue — Bloomington

Repair concrete, install signals and accessible ramps

  • Construction dates: June 8 through mid-July 2020
  • Traffic impacts: Two week closure of ramp from France Ave. to EB I-494; 10-day closure of ramp from WB I-494 to France Ave.

I-494 — Mendota to South Saint Paul

Bridge deck resurfacing and auxiliary lane addition

  • Construction dates: Fall 2018 through fall 2020
  • Traffic impacts: Lane and ramp closures with detours

I-494 — Richfield

Build tunnel under I-494 at Knox Avenue for Orange line bus rapid transit.

  • Construction dates: August 2019 to October 2021
  • Traffic impacts: Closure of ramps from southbound I-35W to westbound I-494 and from eastbound I-494 to southbound I-35W

I-494 and Hwy 62 — Congestion relief study

Mobility and transit improvements

  • Status: Study complete

I-494 and I-35W — Study

Interchange Improvements

  • Study in progress; no projects have been funded or planned

I-494 and I-94 — East Metro Interchange project (I-694/I-494/I-94)

Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

  • Construction dates: 2019 through late fall 2020
  • Traffic impacts: Lane, ramp closures and delays

I-535 – Blatnik Bridge

Replacement of the Blatnik Bridge between Duluth, Minn., and Superior, Wis.

  • Scheduled for construction in 2027

I-694 — Non-motorized crossing study

Determine safety and mobility needs for bicyclists and pedestrians for the area

  • Study completed; no projects have been funded or planned

I-694 and I-94 — East Metro Interchange project (I-694/I-494/I-94)

Reconstruct ramp, build new southbound auxiliary lane from 10th St. to I-94, replace and/or widen northbound and southbound interchange bridges, add northbound and southbound buffer lanes, construct ramp merge area and repair pavement.

  • Construction dates: 2019 through late fall 2020
  • Traffic impacts: Lane, ramp closures and delays

I-694 and Rice Street — Shoreview, Little Canada, Vadnais Heights

Build a new bridge and an offset single point interchange with three roundabouts

  • Construction dates: April 2019 through fall 2020

Stone Arch Bridge — Minneapolis

Preservation of the historic bridge including repointing mortar and repairing/replacing some of the stone

  • Scheduled for construction in 2022-2024

Urban freight perspectives study — Metro district

The Urban Freight Perspectives study is focused on enhancing freight mobility in MnDOT’s Metro District by improving communication with freight stakeholders and integrating freight considerations into the district’s project development process.

  • Study dates: April 2020 through spring 2021